Industry MetroLink PV 1
600 Brea Canyon Road, Industry, CA 91744Plant Summary Information
Industry MetroLink PV 1 is ranked #763 out of 799 solar farms in California in terms of total annual net electricity generation.
Industry MetroLink PV 1 generated 287.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Industry MetroLink PV 1 |
---|---|
Utility Name | City of Industry |
Location | Los Angeles County, CA |
Initial Operation Date | April 2012 |
Last Update | Dec 2023 |
Annual Generation | 860.0 MWh |
Annual Consumption | 3.2 k MMBtu |
Ranked #10,842 out of 11,835 Power Plants Nationwide | |
Ranked #5,421 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,508 out of 1,569 California Power Plants | |
Ranked #763 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Industry MetroLink PV 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Industry MetroLink PV 1.
Monthly Net Generation for Industry MetroLink PV 1
Industry MetroLink PV 1 Details
Summary Information | |
---|---|
Plant Name | Industry MetroLink PV 1 (57860) |
Plant Address | 600 Brea Canyon Road, Industry, CA 91744 |
Utility | City of Industry (57194) |
Latitude, Longitude | 34.00866, -117.8456 |
Generation Dates on File | Apr 2012 to Dec 2023 |
Initial Operation Date | April 2012 |
Annual Generation | 860.0 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 1 Details Operating April 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 223 |
Tilt Angle | 5 |
DC Net Capacity | 2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Industry MetroLink PV 1 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5411 | IGS PCW1 | Rossford, OH | 906.0 MWh |
#5412 | IGS Solar I - EWR5 | Avenel, NJ | 903.0 MWh |
#5413 | Maclay Solar Project | Sylmar, CA | 901.5 MWh |
#5414 | Buidling L | Santa Fe Springs, CA | 899.0 MWh |
#5415 | Mariani Packing Vacaville Solar | Vacaville, CA | 891.0 MWh |
#5416 | NEDC Solar Site | Whitinsville, MA | 878.0 MWh |
#5417 | USS Water Fowl Solar LLC CSG | Silver Lake, MN | 875.0 MWh |
#5418 | Bartow Davidson | Cartersville, GA | 869.0 MWh |
#5419 | City of Boulder WWTP | Boulder, CO | 867.0 MWh |
#5420 | Edwards Air Force Base | Edwards, CA | 866.0 MWh |
#5422 | Stafford Hill Solar Hybrid | Rutland, VT | 859.0 MWh |
#5423 | IKEA Memphis 508 | Cordova, TN | 856.0 MWh |
#5424 | Phoenix Airport East Economy Lot | Phoenix, AZ | 848.0 MWh |
#5425 | Enfield Community Solar | Ithaca, NY | 848.0 MWh |
#5426 | Sunny Cow Solar, LLC | Bakersfield, CA | 847.0 MWh |
#5427 | ZPD-PT Solar Project 2017-044 LLC CSG | Spencer, MA | 846.0 MWh |
#5428 | Solar Photovoltaic Project #27 | Rialto, CA | 845.1 MWh |
#5429 | Howard Lane Solar | Glocester, RI | 842.0 MWh |
#5430 | Source Power NY II - Whaling | Utica, NY | 824.0 MWh |
#5431 | CSU Northridge Plant | Northridge, CA | 819.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Industry MetroLink PV 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blacksand Generating Facility | Brea, CA | 45.1 GWh | 5.3 mi |
Brea Expansion Plant | Brea, CA | 245.2 GWh | 5.3 mi |
Canyon Power Plant | Anaheim, CA | 81.6 GWh | 10.4 mi |
CSUF Nutwood Solar | Fullerton, CA | 2.6 GWh | 9.3 mi |
CSUF State College | Fullerton, CA | 1.5 GWh | 9.3 mi |
CSUF Trigeneration | Fullerton, CA | 33.9 GWh | 9.2 mi |
Gilead Sciences La Verne Rooftop Solar | La Verne, CA | 3.0 GWh | 7.1 mi |
Irwindale Brew Yard, LLC | Irwindale, CA | 1.6 GWh | 9.4 mi |
Kroger La Habra | La Habra, CA | 1.6 GWh | 8 mi |
MM West Covina | West Covina, CA | 39.9 GWh | 3.9 mi |
OLS Energy Chino | Chino, CA | 10.7 GWh | 9.5 mi |
Puente Hills Energy Recovery | Whittier, CA | 159.0 GWh | 10.3 mi |
San Dimas | San Dimas, CA | 24.9 GWh | 8.7 mi |
San Dimas Wash Generating Station | San Dimas, CA | 2.9 GWh | 8.3 mi |
Solar Photovoltaic Project #02 | Chino, CA | 482.7 MWh | 8.4 mi |
Valley View | Yorba Linda, CA | 1.1 GWh | 7.6 mi |
Walnut Creek Energy Park | Industry, CA | 336.7 GWh | 5.7 mi |
Walnut Unified School District Walnut HS Hybrid | Walnut, CA | 1.8 GWh | 1 mi |
Weymouth Solar Plant | La Verne, CA | 5.0 GWh | 7.8 mi |
Yorba Linda | Yorba Linda, CA | 5.0 GWh | 6.9 mi |