Indeck West Enfield Energy Center
Route 2, West Enfield, ME 4493Plant Summary Information
Indeck West Enfield Energy Center is ranked #9 out of 10 wood/wood waste solids power plants in Maine in terms of total annual net electricity generation.
Indeck West Enfield Energy Center is comprised of 1 generator and generated 5.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Indeck West Enfield Energy Center |
---|---|
Utility Name | Stored Solar J&WE |
Location | Penobscot County, ME |
Initial Operation Date | December 1987 |
Last Update | Dec 2023 |
Annual Generation | 13.5 GWh |
Annual Consumption | 273.8 k MMBtu |
Ranked #5,506 out of 11,852 Power Plants Nationwide | |
Ranked #146 out of 169 Wood/Wood Waste Solids Power Plants Nationwide | |
Ranked #73 out of 161 Maine Power Plants | |
Ranked #9 out of 10 Maine Wood/Wood Waste Solids Power Plants | |
Fuel Types | Wood/Wood Waste Solids : 99.7% |
Previous Operators |
Covanta Maine LLC (2013 to 2015) Covanta Maine LLC (2016 to 2018) Stored Solar J&WE (2019 to 2023) |
Map of Indeck West Enfield Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Indeck West Enfield Energy Center.
Monthly Net Generation for Indeck West Enfield Energy Center
Indeck West Enfield Energy Center Details
Summary Information | |
---|---|
Plant Name | Indeck West Enfield Energy Center (10766) |
Plant Address | Route 2, West Enfield, ME 4493 |
Utility | Stored Solar J&WE (62815) |
Latitude, Longitude | 45.2537, -68.62792 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | December 1987 |
Annual Generation | 13.5 GWh |
Fuel Types | Wood/Wood Waste Solids : 99.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 85-334-000, 001, 002, 003, 004 |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 04-66-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Penobscot River |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Emera Maine (1179) ME |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating December 1987
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | UN.ENFLD_ME115 IND5 |
Nameplate Capacity | 27.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 20.4 MW |
Winter Capacity | 21.4 MW |
Minimum Load | 6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1987 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wood/Wood Waste Solids |
Startup Source | Gaseous Propane |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Indeck West Enfield Energy Center Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wood/Wood Waste Solids.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#136 | Woodland Pulp, LLC | Baileyville, ME | 366.6 GWh |
#137 | Finch Paper | Glen Falls, NY | 124.9 GWh |
#138 | Hibbing | Hibbing, MN | 68.3 GWh |
#139 | Pixelle Specialty Solutions LLC - Spring Grove Facility | Spring Grove, PA | 389.5 GWh |
#140 | Douglas County Forest Products | Roseburg, OR | 17.1 GWh |
#141 | Stoltze CoGen1 | Columbia Falls, MT | 16.4 GWh |
#142 | KapStone Kraft Paper Corp | Roanoke Rapids, NC | 196.5 GWh |
#143 | POET Biorefining - Chancellor | Chancellor, SD | 23.4 GWh |
#144 | Darrington | Darrington, WA | 16.0 GWh |
#145 | Cosmo Specialty Fibers Plant | Cosmopolis, WA | 99.6 GWh |
#147 | Georgia-Pacific Big Island | Big Island, VA | 53.7 GWh |
#148 | NE Renewable Whitefield, LLC | Whitefield, NH | 13.0 GWh |
#149 | Tamarack Energy Partnership | New Meadows, ID | 12.9 GWh |
#150 | Snider Industries | Marshall, TX | 11.5 GWh |
#151 | Koda Biomass Plant | Shakopee, MN | 43.2 GWh |
#152 | Plummer Cogen | Plummer, ID | 8.8 GWh |
#153 | Decorative Panels Intl | Alpena, MI | 42.9 GWh |
#154 | Collins Pine Project | Chester, CA | 8.2 GWh |
#155 | Androscoggin Mill | Jay, ME | 69.3 GWh |
#156 | Sauder Power Plant | Archbold, OH | 6.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Indeck West Enfield Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Broadway Solar (CSG) | Bangor, ME | 1.3 GWh | 29 mi |
Corkwood Solar (CSG) | Howland, ME | 344.0 MWh | 1.9 mi |
Dynamic Corinth (CSG) | Corinth, ME | 4.0 GWh | 25.6 mi |
Eastern Maine Medical Center | Bangor, ME | 31.6 GWh | 31.4 mi |
Great Lakes Hydro America - ME | Millinocket, ME | 737.2 GWh | 27.4 mi |
Maine Independence Station | Veazie, ME | 936.9 GWh | 29.9 mi |
Medway Hydro | Medway, ME | 27.5 GWh | 24.8 mi |
Milford Hydro Station | Milford, ME | 53.0 GWh | 21.5 mi |
Milo CSG | Milo, ME | 6.0 GWh | 18.9 mi |
Milo PV - BD Solar 1 LLC | Milo, ME | 25.2 GWh | 17.7 mi |
Orono B | Orono, ME | 25.5 GWh | 25.6 mi |
Orono Hydro Station | Orono, ME | 11.6 GWh | 25.9 mi |
Passadumkeag Windpark LLC | Greenbush, ME | 121.1 GWh | 24 mi |
Pumpkin Hill | Lowell, ME | 5.5 GWh | 9.2 mi |
Red Shield Envir Old Town Facility | Old Town, ME | 66.3 GWh | 23.2 mi |
Rollins Wind Project | Winn Village, ME | 132.2 GWh | 13.6 mi |
Silver Maple | Clifton, ME | 52.1 GWh | 33 mi |
Stillwater B | Old Town, ME | 12.8 GWh | 23.7 mi |
Stillwater Hydro Station | Stillwater, ME | 12.1 GWh | 23.9 mi |
West Enfield Hydro | West Enfield, ME | 100.4 GWh | 1 mi |