Improvement Dst No. 4
811 Nadine Lane, Bakersfield, CA 93308Plant Summary Information
Improvement Dst No. 4 is ranked #799 out of 799 solar farms in California in terms of total annual net electricity generation.
Improvement Dst No. 4 generated 1.4 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Improvement Dst No. 4 |
---|---|
Utility Name | Kern County Water Agency |
Location | Kern County, CA |
Initial Operation Date | January 2009 |
Last Update | Dec 2022 |
Annual Generation | 8.0 MWh |
Annual Consumption | 222 MMBtu |
Ranked #11,754 out of 11,836 Power Plants Nationwide | |
Ranked #5,638 out of 5,644 Solar Power Plants Nationwide | |
Ranked #1,568 out of 1,569 California Power Plants | |
Ranked #799 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Improvement Dst No. 4
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Improvement Dst No. 4.
Monthly Net Generation for Improvement Dst No. 4
Improvement Dst No. 4 Details
Summary Information | |
---|---|
Plant Name | Improvement Dst No. 4 (57895) |
Plant Address | 811 Nadine Lane, Bakersfield, CA 93308 |
Utility | Kern County Water Agency (57262) |
Latitude, Longitude | 35.40278, -119.03861 |
Generation Dates on File | Jan 2011 to Dec 2022 |
Initial Operation Date | January 2009 |
Annual Generation | 8.0 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Water Supply and Irrigation Systems (22131) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 4.16 kV |
Energy Storage | No |
Generator ID4 Details Operating January 2009
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.1 MW |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2009 |
Combined Heat & Power | No |
---|---|
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | January 2025 |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | No |
---|---|
Fixed Tilt | Yes |
East West Fixed Tilt | Yes |
Azimuth Angle | 180 |
Tilt Angle | 22 |
DC Net Capacity | 1.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Improvement Dst No. 4 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5624 | Bayer - Whippany, NJ | Whippany, NJ | 32.0 MWh |
#5625 | Lemonweir (Oak 1) | Mauston, WI | 30.0 MWh |
#5626 | WMATA - Naylor Rd. Metro | Temple Hills, MD | 29.0 MWh |
#5627 | Park Solar | Woodbridge, CT | 20.0 MWh |
#5628 | Pierre Solar | Pierre, SD | 17.0 MWh |
#5629 | Glenville Solar (CSG) | Glenville, NY | 17.0 MWh |
#5630 | Bluff Prairie (Vernon) | De Soto, WI | 17.0 MWh |
#5631 | Richmond Hill | Richmond, ME | 16.0 MWh |
#5632 | Webster Creek (Oak 2) | New Lisbon, WI | 14.0 MWh |
#5633 | Ports Newark 8201 Solar | Newark, NJ | 14.0 MWh |
#5634 | Georgetown (Polk Burnett) | Balsam Lake, WI | 13.0 MWh |
#5635 | Cabrillo College | Aptos, CA | 13.0 MWh |
#5636 | Minster 3 | Minster, OH | 12.0 MWh |
#5637 | Source Power NY II - Locust 1 | Cortland, NY | 8.0 MWh |
#5639 | Agua Fria | Glendale, AZ | 197.1 GWh |
#5640 | Verizon Hidden Ridge Solar Project | Irving, TX | 3.0 MWh |
#5641 | Rhode Island Solar Renewable Energy IV, LLC | Tiverton, RI | 1.0 MWh |
#5642 | CASD Solar | Carlisle, PA | 1.0 MWh |
#5643 | ASA DeKalb NY Solar II LLC | DeKalb, NY | 1.0 MWh |
#5644 | LGE-KU Solar Share Facility Simpsonville | Simpsonville, KY | 1.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Improvement Dst No. 4.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Badger Creek Limited | Bakersfield, CA | 17.9 GWh | 5.6 mi |
Bakersfield 111 | Bakersfield, CA | 2.3 GWh | 6.5 mi |
Bakersfield College Solar 01 | Bakersfield, CA | 2.1 GWh | 4 mi |
Bakersfield Industrial PV 1 | Bakersfield, CA | 2.0 GWh | 5.6 mi |
Bakersfield PV 1 | Bakersfield, CA | 6.7 GWh | 6.3 mi |
Bear Mountain Limited | Bakersfield, CA | 40.4 GWh | 6.4 mi |
Calibrant Bakersfield LLC | Bakersfield, CA | 2.4 GWh | 4.1 mi |
Double C Generation Limited Partnership | Bakersfield, CA | 22.9 GWh | 6.8 mi |
Frontier HS Solar Project | Bakersfield, CA | 2.6 GWh | 6.3 mi |
High Sierra Limited | Bakersfield, CA | 23.3 GWh | 7.4 mi |
Kern Front Limited | Bakersfield, CA | 22.0 GWh | 7.9 mi |
Kern River Cogeneration | Bakersfield, CA | 155.5 GWh | 4.5 mi |
Kern River Eastridge Cogen | Bakersfield, CA | 223.0 GWh | 5.1 mi |
Laredo Detention Facility - Solar 2, 3 | Bakersfield, CA | 9.2 GWh | 8.5 mi |
Liberty HS Solar Project | Bakersfield, CA | 2.3 GWh | 5.7 mi |
Live Oak Limited | Bakersfield, CA | 21.3 GWh | 5.6 mi |
Shafter Solar LLC | Bakersfield, CA | 48.2 GWh | 5.1 mi |
Southeast Kern River Cogen | Bakersfield, CA | 95.7 GWh | 4.4 mi |
Sycamore Cogeneration | Bakersfield, CA | 376.5 GWh | 4.6 mi |
Western Power & Steam Inc | Bakersfield, CA | 37.6 GWh | 3 mi |