IKEA Tejon 345
4104 Industrial Park Drive, Lebec, CA 93243Plant Summary Information
IKEA Tejon 345 is ranked #581 out of 799 solar farms in California in terms of total annual net electricity generation.
IKEA Tejon 345 generated 322.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | IKEA Tejon 345 |
---|---|
Utility Name | IKEA Property Inc |
Location | Kern County, CA |
Initial Operation Date | April 2011 |
Last Update | Dec 2023 |
Annual Generation | 2.5 GWh |
Annual Consumption | 8.8 k MMBtu |
Ranked #9,396 out of 11,835 Power Plants Nationwide | |
Ranked #4,190 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,308 out of 1,569 California Power Plants | |
Ranked #581 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of IKEA Tejon 345
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for IKEA Tejon 345.
Monthly Net Generation for IKEA Tejon 345
IKEA Tejon 345 Details
Summary Information | |
---|---|
Plant Name | IKEA Tejon 345 (58028) |
Plant Address | 4104 Industrial Park Drive, Lebec, CA 93243 |
Utility | IKEA Property Inc (57389) |
Latitude, Longitude | 34.97528, -118.94694 |
Generation Dates on File | Jan 2012 to Dec 2023 |
Initial Operation Date | April 2011 |
Annual Generation | 2.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Real Estate and Rental and Leasing (53) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator PV Details Operating April 2011
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2011 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 12 |
DC Net Capacity | 1.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.8 MW |
Virtual Net Metering Agreement | No |
IKEA Tejon 345 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4180 | Lineage Logistics Solar | University Park, IL | 2.5 GWh |
#4181 | Warren County Solar | Belvidere, NJ | 2.5 GWh |
#4182 | Bethlehem Solar | New Scotland, NY | 2.5 GWh |
#4183 | Legoland Solar | Winter Haven, FL | 2.5 GWh |
#4184 | Weber State University - Davis Campus PV | Layton, UT | 2.5 GWh |
#4185 | GD Glocester White Oak I, LLC | Glocester, RI | 2.5 GWh |
#4186 | Enerparc CA1 LLC | Hollister, CA | 2.5 GWh |
#4187 | Westminster Renewables, LLC CSG | Westminster, MA | 2.5 GWh |
#4188 | Woodoak Drive Community Solar Farm CSG | Tusten, NY | 2.5 GWh |
#4189 | Santa Rita Jail Hybrid | Dublin, CA | 13.1 GWh |
#4191 | Bryan Solar Field | Bryan, OH | 2.5 GWh |
#4192 | Amazon Maryland DCA1 | Sparrows Point, MD | 2.5 GWh |
#4193 | Park St | Rutland, VT | 2.5 GWh |
#4194 | Rancho Cucamonga Dist #1 | Rancho Cucamonga, CA | 2.5 GWh |
#4195 | Chicopee | Chicopee, MA | 2.5 GWh |
#4196 | Middlesex Vo Tech Solar 1 LLC | Piscataway, NJ | 2.5 GWh |
#4197 | Storrie Lake Solar Project | Las Vegas, NM | 2.5 GWh |
#4198 | DG Infineum | Linden, NJ | 2.5 GWh |
#4199 | SR Skylark C | Windsor, CO | 2.5 GWh |
#4200 | Cedar Creek | Egg Harbor City, NJ | 2.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding IKEA Tejon 345.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ABEC #3 dba Lakeview Dairy | Bakersfield, CA | 7.8 GWh | 22 mi |
ABEC #4 dba CE&S Dairy | Bakersfield, CA | 8.5 GWh | 16.7 mi |
ABEC Bidart-Old River LLC | Bakersfield, CA | 16.0 GWh | 16.2 mi |
Adobe Solar | Arvin, CA | 39.0 GWh | 8.8 mi |
Alamo | Pearblossom, CA | 91.3 GWh | 18.4 mi |
Algonquin SKIC 10 Solar, LLC | Taft, CA | 17.7 GWh | 19.7 mi |
Algonquin SKIC20 Solar LLC | Taft, CA | 45.5 GWh | 19.7 mi |
Blue Skies Solar, LLC | Arvin, CA | 1.9 GWh | 2.3 mi |
Cawelo Water District Solar | Famoso, CA | 927.0 MWh | 14.2 mi |
Kern Oil & Refining Co | Bakersfield, CA | 34.6 GWh | 22.2 mi |
Maricopa West Solar PV, LLC | Taft, CA | 40.6 GWh | 23.1 mi |
Orion Solar I | Arvin, CA | 28.9 GWh | 12.8 mi |
Orion Solar II | Arvin, CA | 18.3 GWh | 12.8 mi |
Pastoria Energy Facility, LLC | Lebec, CA | 4.1 TWh | 6 mi |
RE Old River One, LLC | Bakersfield, CA | 34.7 GWh | 18.9 mi |
Regulus Solar Project | Bakersfield, CA | 144.5 GWh | 23.1 mi |
Sunny Cow Solar, LLC | Bakersfield, CA | 847.0 MWh | 22.6 mi |
Vulcan San Emidio Solar | Bakersfield, CA | 3.4 GWh | 14.2 mi |
W E Warne | Gorman, CA | 216.9 GWh | 22 mi |
Wheeler Ridge | Bakersfield, CA | 2.4 GWh | 22.1 mi |