IKEA College Park 411
10100 Baltimore Ave., College Park, MD 20740Plant Summary Information
IKEA College Park 411 is ranked #97 out of 140 solar farms in Maryland in terms of total annual net electricity generation.
IKEA College Park 411 generated 544.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | IKEA College Park 411 |
---|---|
Utility Name | IKEA Property Inc |
Location | Prince George's County, MD |
Initial Operation Date | February 2012 |
Last Update | Dec 2023 |
Annual Generation | 2.3 GWh |
Annual Consumption | 8.0 k MMBtu |
Ranked #9,587 out of 11,835 Power Plants Nationwide | |
Ranked #4,347 out of 5,643 Solar Power Plants Nationwide | |
Ranked #130 out of 179 Maryland Power Plants | |
Ranked #97 out of 140 Maryland Solar Power Plants | |
Fuel Types | Solar |
Map of IKEA College Park 411
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for IKEA College Park 411.
Monthly Net Generation for IKEA College Park 411
IKEA College Park 411 Details
Summary Information | |
---|---|
Plant Name | IKEA College Park 411 (58015) |
Plant Address | 10100 Baltimore Ave., College Park, MD 20740 |
Utility | IKEA Property Inc (57389) |
Latitude, Longitude | 39.021, -76.926 |
Generation Dates on File | Feb 2012 to Dec 2023 |
Initial Operation Date | February 2012 |
Annual Generation | 2.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Real Estate and Rental and Leasing (53) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Potomac Electric Power Co (15270) MD |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator PV Details Operating February 2012
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2012 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 12 |
DC Net Capacity | 1.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.2 MW |
Virtual Net Metering Agreement | No |
Generator IKEA Details Operating October 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2021 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 12 |
DC Net Capacity | 1.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.2 MW |
Virtual Net Metering Agreement | No |
IKEA College Park 411 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4337 | Southbridge Solar | Southbridge, MA | 2.3 GWh |
#4338 | SolarClub 35 LLC | Mankato, MN | 2.3 GWh |
#4339 | PSEG Hackettstown | Hackettstown, NJ | 2.3 GWh |
#4340 | County of San Diego SBRC | Chula Vista, CA | 2.3 GWh |
#4341 | E&B Resources | Bakersfield, CA | 2.3 GWh |
#4342 | Rio Rancho High School | Rio Rancho, NM | 2.3 GWh |
#4343 | Brooten CSG1, LLC | Brooten, MN | 2.3 GWh |
#4344 | 456 Lower | Minisink, NY | 2.3 GWh |
#4345 | Kenmare - Mansfield Branch Street | Mansfield, MA | 2.3 GWh |
#4346 | Call Farms 1 | Batavia, NY | 2.3 GWh |
#4348 | Guadalupe Solar Farm | San Jose, CA | 2.3 GWh |
#4349 | 232 Long Branch 29 Solar I, LLC | Shelby, NC | 2.3 GWh |
#4350 | Shelby Solar Array | Shelby, OH | 2.3 GWh |
#4351 | Stow PV | Stow, MA | 2.3 GWh |
#4352 | CPG - Duke 6000 Holabird | Baltimore, MD | 2.3 GWh |
#4353 | Lowry CSG2, LLC | Glenwood, MN | 2.3 GWh |
#4354 | USS Prokosch Solar LLC | Bird Island, MN | 2.3 GWh |
#4355 | Bloomington Solar I | St George, UT | 2.3 GWh |
#4356 | Pittsgrove Solar | Elmer, NJ | 2.3 GWh |
#4357 | Denison Solar Array | Granville, OH | 2.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding IKEA College Park 411.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AOC, Capitol Power Plant | Washington, DC | 49.4 GWh | 10.5 mi |
Bowie State Solar | Bowie, MD | 362.0 MWh | 8.9 mi |
Brookville Smart Bus Depot Microgrid | Silver Spring, MD | 2.2 GWh | 7.2 mi |
Central Utility Plant at White Oak | Silver Spring, MD | 83.0 GWh | 3.3 mi |
FedEx Field Solar Facility | Landover, MD | 3.5 GWh | 8.5 mi |
GWCC PV Solar Farm | Beltsville, MD | 2.4 GWh | 0.9 mi |
Holly Spring Meadows | District Heights, MD | 656.0 MWh | 11 mi |
IGS CC, LLC | Washington, DC | 2.1 GWh | 6.3 mi |
Maryland Bioenergy Center (Jessup) | Jessup, MD | 2.9 GWh | 12.3 mi |
MO32 (CSG) | Spencerville, MD | 3.7 GWh | 7 mi |
Nationals | Washington, DC | 1.7 GWh | 11 mi |
NIH Cogeneration Facility | Bethesda, MD | 176.8 GWh | 9.1 mi |
Ross Hall Central Utility Plant | Washington, DC | 9.0 GWh | 10.7 mi |
Sheriff Road | Hyattsville, MD | 1.9 GWh | 7.8 mi |
Snowden River CSG | Columbia, MD | 2.6 GWh | 11.7 mi |
Sol Phoenix | Capitol Heights, MD | 4.0 GWh | 11.9 mi |
UMCP CHP Plant | College Park, MD | 75.5 GWh | 2.5 mi |
US GSA Heating and Transmission | Washington, DC | 32.8 GWh | 10.8 mi |
WMATA - Anacostia CSG | Washington, DC | 242.0 MWh | 11.4 mi |
WMATA - Naylor Rd. Metro | Temple Hills, MD | 29.0 MWh | 11.9 mi |