IGS SBD1
3388 S. Cactus Avenue, Bloomington, CA 92316Plant Summary Information
IGS SBD1 is ranked #406 out of 799 solar farms in California in terms of total annual net electricity generation.
IGS SBD1 generated 1.0 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | IGS SBD1 |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | San Bernardino County, CA |
Initial Operation Date | February 2023 |
Last Update | Dec 2023 |
Annual Generation | 5.0 GWh |
Annual Consumption | 16.9 k MMBtu |
Ranked #7,667 out of 11,835 Power Plants Nationwide | |
Ranked #2,791 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,077 out of 1,569 California Power Plants | |
Ranked #406 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of IGS SBD1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for IGS SBD1.
Monthly Net Generation for IGS SBD1
IGS SBD1 Details
Summary Information | |
---|---|
Plant Name | IGS SBD1 (66035) |
Plant Address | 3388 S. Cactus Avenue, Bloomington, CA 92316 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 34.03874, -117.38485 |
Generation Dates on File | Feb 2023 to Dec 2023 |
Initial Operation Date | February 2023 |
Annual Generation | 5.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 22-662; 22-662-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator 457 Details Operating February 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2.6 MW |
Summer Capacity | 2.6 MW |
Winter Capacity | 2.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Tilt Angle | 10 |
DC Net Capacity | 3.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
IGS SBD1 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2781 | Ku'ia Solar | Lahaina, HI | 5.0 GWh |
#2782 | CMEEC - Polaris Park Solar Hybrid | Gordon, CT | 4.9 GWh |
#2783 | Ouchchy PV1 | Mebane, NC | 5.0 GWh |
#2784 | Red Maple Solar | Cleveland, MN | 5.0 GWh |
#2785 | County Road 17 (CSG) | Afton, NY | 5.0 GWh |
#2786 | Fairhaven MA 2 | Fairhaven, MA | 5.0 GWh |
#2787 | Livermore Falls CSG | Livermore Falls, ME | 5.0 GWh |
#2788 | Weymouth Solar Plant | La Verne, CA | 5.0 GWh |
#2789 | BE Solar LLC | Atlanta, GA | 5.0 GWh |
#2790 | Chester Solar Farm | Chester, MA | 5.0 GWh |
#2792 | Bedford Solar | Bedford, VA | 4.9 GWh |
#2793 | Westmont 300A | San Pedro, CA | 4.9 GWh |
#2794 | Western Meadowlark Solar SCS NE 1, LLC | Scottsbluff, NE | 4.9 GWh |
#2795 | CED Chicopee Solar | Chicopee, MA | 4.9 GWh |
#2796 | Trona Solar III | Trona, CA | 4.9 GWh |
#2797 | CES Marbletown Solar | Marbletown, NY | 4.9 GWh |
#2798 | Hampshire College Hybrid | Amherst, MA | 4.9 GWh |
#2799 | Johnstown Solar 1, LLC | Gloversville, NY | 4.9 GWh |
#2800 | Barnhill Road Solar, LLC | Elizabeth City, NC | 4.9 GWh |
#2801 | Blue Prairie Solar, LLC | Black River Falls, WI | 4.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding IGS SBD1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Agua Mansa Power Plant | Colton, CA | 10.2 GWh | 1.4 mi |
Broadway 2 - UC Riverside | Riverside, CA | 3.7 GWh | 5.6 mi |
Century Generating Facility | Colton, CA | 651.0 MWh | 2.4 mi |
Chambers 4 - Rialto LGB8 | Rialto, CA | 3.5 GWh | 6.4 mi |
Colton Solar One, LLC | San Bernardino, CA | 2.3 GWh | 5.3 mi |
Colton Solar Two, LLC | Colton, CA | 1.1 GWh | 1.3 mi |
Drews Generating Facility | Colton, CA | 606.0 MWh | 2.4 mi |
ESCA-LL-COLTON, LLC | Colton, CA | 4.6 GWh | 1.4 mi |
IGS SBD2 | San Bernardino, CA | 4.2 GWh | 6.4 mi |
IOS II-LAX9 | Fontana, CA | 7.5 GWh | 5.1 mi |
Niagara Bottling - Rialto | Rialto, CA | 7.9 GWh | 6.3 mi |
Riverside Energy Resource Center | Riverside, CA | 52.6 GWh | 6.5 mi |
Riverside RWQCP Fuel Cell | Riverside, CA | 9.4 GWh | 6.7 mi |
SB Water Reclamation Fuel Cell | San Bernardino, CA | 9.5 GWh | 6.1 mi |
Solar Photovoltaic Project #03 | Rialto, CA | 452.8 MWh | 3.9 mi |
Solar Photovoltaic Project #26 | Rialto, CA | 4.6 GWh | 6.8 mi |
Solar Photovoltaic Project #27 | Rialto, CA | 845.1 MWh | 6.7 mi |
SSI West Riverside Landfill LLC | Riverside, CA | 4.8 GWh | 4.1 mi |
Tequesquite Landfill Solar PV Project | Riverside, CA | 13.2 GWh | 4.2 mi |
UC Riverside Lots 30 & 32 | Riverside, CA | 7.0 GWh | 5.6 mi |