IGS SBD1
3388 S. Cactus Avenue, Bloomington, CA 92316Plant Summary Information
IGS SBD1 is ranked #415 out of 786 solar farms in California in terms of total annual net electricity generation.
IGS SBD1 generated 1.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | IGS SBD1 |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | San Bernardino County, CA |
Initial Operation Date | February 2023 |
Last Update | Dec 2023 |
Annual Generation | 5.0 GWh |
Annual Consumption | 16.9 k MMBtu |
Ranked #7,708 out of 11,717 Power Plants Nationwide | |
Ranked #2,802 out of 5,541 Solar Power Plants Nationwide | |
Ranked #1,088 out of 1,555 California Power Plants | |
Ranked #415 out of 786 California Solar Power Plants | |
Fuel Types | Solar |
Map of IGS SBD1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for IGS SBD1.
Monthly Net Generation for IGS SBD1
IGS SBD1 Details
Summary Information | |
---|---|
Plant Name | IGS SBD1 (66035) |
Plant Address | 3388 S. Cactus Avenue Bloomington, CA 92316 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 34.03874, -117.38485 |
Generation Dates on File | Feb 2023 to Dec 2023 |
Initial Operation Date | February 2023 |
Annual Generation | 5.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 22-662; 22-662-001 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator 457 Details Operating February 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2.6 MW |
Summer Capacity | 2.6 MW |
Winter Capacity | 2.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Tilt Angle | 10 |
DC Net Capacity | 3.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
IGS SBD1 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2792 | Blue Prairie Solar, LLC | Black River Falls, WI | 5.0 GWh |
#2793 | Wilkinson DeFore | Gordon, GA | 5.0 GWh |
#2794 | Antares Community Solar | Tracy, MN | 5.0 GWh |
#2795 | DOCCS Midstate | Marcy, NY | 5.0 GWh |
#2796 | Vermillion River_MN_GRE DEA-GM | Farmington, MN | 5.0 GWh |
#2797 | National Raisin | Fowler, CA | 5.0 GWh |
#2798 | 1047 Little Mountain Solar, LLC | Jonesville, NC | 5.0 GWh |
#2799 | Kearsarge Bellingham PV | Bellingham, MA | 5.0 GWh |
#2800 | Steel Sun 2: 2303-III-2 Hamburg Tpke | Lackawanna, NY | 5.0 GWh |
#2801 | Dudley | Dudley, MA | 5.0 GWh |
#2803 | Lansing Renewables, LLC | Lansing, NY | 5.0 GWh |
#2804 | Steel Sun 2: 2303-III-4 Hamburg Tpke | Lackawanna, NY | 4.9 GWh |
#2805 | Van Buren | Roseboro, NC | 4.9 GWh |
#2806 | Desert Hot Springs Solar | Desert Hot Springs, CA | 4.9 GWh |
#2807 | Suncaster, LLC | Pikeville, NC | 4.9 GWh |
#2808 | Butler Solar Power Project | Butler, MO | 4.9 GWh |
#2809 | Spring Street Solar 1 CSG | Carver, MA | 4.9 GWh |
#2810 | Jackson Legler Solar 1 LLC | Jackson Township, NJ | 4.9 GWh |
#2811 | Burlington Coat Factory Solar | Florence, NJ | 4.9 GWh |
#2812 | Steel Sun 2: 2303-III-9 Hamburg Tpke | Lackawanna, NY | 4.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding IGS SBD1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Agua Mansa Power Plant | Colton, CA | 11.5 GWh | 1.4 mi |
Broadway 2 - UC Riverside | Riverside, CA | 3.9 GWh | 5.6 mi |
Century Generating Facility | Colton, CA | 1.1 GWh | 2.4 mi |
Chambers 4 - Rialto LGB8 | Rialto, CA | 3.5 GWh | 6.4 mi |
Colton Solar One, LLC | San Bernardino, CA | 4.9 GWh | 5.3 mi |
Colton Solar Two, LLC | Colton, CA | 1.2 GWh | 1.3 mi |
Drews Generating Facility | Colton, CA | 865.7 MWh | 2.4 mi |
ESCA-LL-COLTON, LLC | Colton, CA | 4.8 GWh | 1.4 mi |
IGS SBD2 | San Bernardino, CA | 4.2 GWh | 6.4 mi |
IOS II-LAX9 | Fontana, CA | 7.5 GWh | 5.1 mi |
Niagara Bottling - Rialto | Rialto, CA | 8.6 GWh | 6.3 mi |
Riverside Energy Resource Center | Riverside, CA | 54.0 GWh | 6.5 mi |
Riverside RWQCP Fuel Cell | Riverside, CA | 11.4 GWh | 6.7 mi |
SB Water Reclamation Fuel Cell | San Bernardino, CA | 10.3 GWh | 6.1 mi |
Solar Photovoltaic Project #03 | Rialto, CA | 515.1 MWh | 3.9 mi |
Solar Photovoltaic Project #26 | Rialto, CA | 5.0 GWh | 6.8 mi |
Solar Photovoltaic Project #27 | Rialto, CA | 952.3 MWh | 6.7 mi |
SSI West Riverside Landfill LLC | Riverside, CA | 5.1 GWh | 4.1 mi |
Tequesquite Landfill Solar PV Project | Riverside, CA | 13.7 GWh | 4.2 mi |
UC Riverside Lots 30 & 32 | Riverside, CA | 8.2 GWh | 5.6 mi |