Hyder II Hybrid
75100 E County 14 1/2 St, Hyder, AZ 85333Plant Summary Information
Hyder II Hybrid is ranked #54 out of 103 solar farms in Arizona in terms of total annual net electricity generation.
Hyder II Hybrid generated 5.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Hyder II Hybrid |
---|---|
Utility Name | Arizona Public Service Co |
Location | Yuma County, AZ |
Initial Operation Date | December 2013 |
Last Update | Dec 2023 |
Annual Generation | 30.3 GWh |
Annual Consumption | 108.8 k MMBtu |
Ranked #4,543 out of 11,852 Power Plants Nationwide | |
Ranked #999 out of 5,655 Solar Power Plants Nationwide | |
Ranked #102 out of 156 Arizona Power Plants | |
Ranked #54 out of 103 Arizona Solar Power Plants | |
Fuel Types | Solar |
Map of Hyder II Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hyder II Hybrid.
Monthly Net Generation for Hyder II Hybrid
Hyder II Hybrid Details
Summary Information | |
---|---|
Plant Name | Hyder II Hybrid (58383) |
Plant Address | 75100 E County 14 1/2 St, Hyder, AZ 85333 |
Utility | Arizona Public Service Co (803) |
Latitude, Longitude | 33.027, -113.3489 |
Generation Dates on File | Dec 2013 to Dec 2023 |
Initial Operation Date | December 2013 |
Annual Generation | 30.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Arizona Public Service Company (AZPS) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Arizona Public Service Co (803) AZ |
Grid Voltage | 12.47 kV |
Energy Storage | Yes |
Generator PV1 Details Operating December 2013
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 14 MW |
Summer Capacity | 14 MW |
Winter Capacity | 14 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2013 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 21 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator H214M Details Operating April 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 14 MW |
Summer Capacity | 14 MW |
Winter Capacity | 14 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 42 |
---|---|
Maximum Charge Rate | 14 MW |
Maximum Discharge Rate | 14 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 4.6 |
Storage Enclosure Type | CS |
Load Following | Yes |
System Peak Shaving | P |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 58383 |
Direct Support Gen Id | PV1 |
Support T D Asset | No |
Hyder II Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#989 | UN-School House LLC | Morris Township, PA | 31.0 GWh |
#990 | Woodmere Solar Farm | Edison, CA | 31.0 GWh |
#991 | North Stonington Solar Center, LLC | North Stonington, CT | 30.9 GWh |
#992 | Williamston Speight Solar, LLC | Williamston, NC | 30.9 GWh |
#993 | Saddle Mountain Solar I | Tonopah, AZ | 30.9 GWh |
#994 | Hecate Energy Cherrydale LLC | Cape Charles, VA | 30.6 GWh |
#995 | Caden Energix Pamplin LLC | Appomattox, VA | 30.6 GWh |
#996 | Maryland Solar | Hagerstown, MD | 30.6 GWh |
#997 | Riverhead Solar Farm | Calverton, NY | 30.4 GWh |
#998 | Apple Data Center PV3 | Conover, NC | 30.3 GWh |
#1000 | Correctional Solar LLC | Barhamsville, VA | 30.1 GWh |
#1001 | Woodland Solar Farm | Smithfield, VA | 30.0 GWh |
#1002 | Desert Star Hybrid | Buckeye, AZ | 30.0 GWh |
#1003 | Copperhead Solar, LLC | Riesel, TX | 29.7 GWh |
#1004 | Tropico Solar PV Plant | Delano, CA | 30.0 GWh |
#1005 | RE Adams East, LLC | Fresno, CA | 29.9 GWh |
#1006 | Hollyfield | Manquin, VA | 29.8 GWh |
#1007 | Wister Solar | Niland, CA | 29.7 GWh |
#1008 | Morelos del Sol | Lost Hills, CA | 29.5 GWh |
#1009 | Baker City Solar | Baker City, OR | 29.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hyder II Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Agave | AZ | 39.3 GWh | 35.9 mi |
Agua Caliente Solar Project | Dateland, AZ | 675.2 GWh | 9.1 mi |
Arlington Valley Energy Facility | Arlington, AZ | 3.5 TWh | 34.3 mi |
Arlington Valley Solar Energy II | Arlington, AZ | 348.5 GWh | 35.4 mi |
Gila Bend Hybrid | Gila Bend, AZ | 80.0 GWh | 27.7 mi |
Harquahala Generating Project | Tonopah, AZ | 2.7 TWh | 33.9 mi |
Hyder Solar Hybrid | Hyder, AZ | 40.2 GWh | 0.3 mi |
McFarland A Solar and Storage | Dateland, AZ | 378.2 GWh | 9.7 mi |
Mesquite Generating Station Block 1 | Arlington, AZ | 3.6 TWh | 35.6 mi |
Mesquite Generating Station Block 2 | Arlington, AZ | 3.5 TWh | 35.6 mi |
Mesquite Solar 1 | Tonopah, AZ | 403.9 GWh | 33.7 mi |
Mesquite Solar 2, LLC | Tonopah, AZ | 282.9 GWh | 33 mi |
Mesquite Solar 3, LLC | Tonopah, AZ | 465.9 GWh | 32.5 mi |
Mesquite Solar 4, LLC | Tonopah, AZ | 117.5 GWh | 32.3 mi |
Mesquite Solar 5, LLC | Tonopah, AZ | 113.8 GWh | 32.3 mi |
Red Hawk | Arlington, AZ | 3.8 TWh | 36.3 mi |
Saddle Mountain Solar I | Tonopah, AZ | 30.9 GWh | 26.1 mi |
Solana Generating Station | Gila Bend, AZ | 823.1 GWh | 23.9 mi |
Sun Streams 2 | Hassayampa, AZ | 311.6 GWh | 36.9 mi |
Sun Streams, LLC | Arlington, AZ | 418.3 GWh | 37.1 mi |