Hutchinson Energy Center
3200 E 30th Ave, Hutchinson, KS 67501Plant Summary Information
Hutchinson Energy Center is ranked #19 out of 58 natural gas power plants in Kansas in terms of total annual net electricity generation.
Hutchinson Energy Center is comprised of 5 generators and generated 4.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Hutchinson Energy Center |
---|---|
Utility Name | Evergy Kansas Central, Inc |
Location | Reno County, KS |
Initial Operation Date | May 1965 |
Last Update | Dec 2023 |
Annual Generation | 24.9 GWh |
Annual Consumption | 697.6 k MMBtu |
Ranked #4,795 out of 11,852 Power Plants Nationwide | |
Ranked #1,394 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #71 out of 152 Kansas Power Plants | |
Ranked #19 out of 58 Kansas Natural Gas Power Plants | |
Fuel Types | Natural Gas : 83.9% Distillate Fuel Oil : 16.1% |
Previous Operator |
Westar Energy Inc (2013 to 2018) Evergy Kansas Central, Inc (2019 to 2023) |
Map of Hutchinson Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hutchinson Energy Center.
Monthly Net Generation for Hutchinson Energy Center
Hutchinson Energy Center Details
Summary Information | |
---|---|
Plant Name | Hutchinson Energy Center (1248) |
Plant Address | 3200 E 30th Ave, Hutchinson, KS 67501 |
Utility | Evergy Kansas Central, Inc (22500) |
Latitude, Longitude | 38.0906, -97.87472 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | May 1965 |
Annual Generation | 24.9 GWh |
Fuel Types | Natural Gas : 83.9% Distillate Fuel Oil : 16.1% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Westar Energy Inc (22500) KS |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | KANSAS GAS SERVICE COMPANY |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator GT1 Details Operating May 1974
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WR.HEC.GT.1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WR.HEC.GT.1 |
Nameplate Capacity | 71.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 55.9 MW |
Winter Capacity | 55.9 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1974 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 53.7 MW |
Net Winter Capacity With Natural Gas | 53.7 MW |
Net Summer Capacity With Oil | 53.7 MW |
Net Winter Capacity With Oil | 53.7 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator GT2 Details Operating May 1974
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WR.HEC.GT.2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WR.HEC.GT.2 |
Nameplate Capacity | 71.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 55.9 MW |
Winter Capacity | 55.9 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1974 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 50.7 MW |
Net Winter Capacity With Natural Gas | 50.7 MW |
Net Summer Capacity With Oil | 50 MW |
Net Winter Capacity With Oil | 46 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator GT3 Details Operating May 1974
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WR.HEC.GT.3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WR.HEC.GT.3 |
Nameplate Capacity | 71.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 56.7 MW |
Winter Capacity | 56.7 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1974 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 53 MW |
Net Winter Capacity With Natural Gas | 53 MW |
Net Summer Capacity With Oil | 53 MW |
Net Winter Capacity With Oil | 53 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | No |
Generator GT4 Details Operating June 1975
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WR.HEC.GT.4 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WR.HEC.GT.4 |
Nameplate Capacity | 129 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 69.8 MW |
Winter Capacity | 69.8 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 1975 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator H1DG Details Standby January 1983
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
---|---|
First Operation Date | January 1983 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Hutchinson Energy Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1384 | Bountiful City | Bountiful, UT | 21.4 GWh |
#1385 | Delray | Detroit, MI | 21.4 GWh |
#1386 | Alabama Pine Pulp | Perdue Hill, AL | 407.9 GWh |
#1387 | Peak Power 1 Cogen | New York, NY | 21.4 GWh |
#1388 | Warner Lambert | Ann Arbor, MI | 21.3 GWh |
#1389 | MCRD Parris Island PV Hybrid | Parris Island, SC | 31.5 GWh |
#1390 | POET Biorefining - Jewell | Jewell, IA | 21.3 GWh |
#1391 | Morgan Creek | Colorado City, TX | 73.6 GWh |
#1392 | UDR Glastonbury Fuel Cell | Glastonbury, CT | 21.1 GWh |
#1393 | CCCSD Wastewater Treatment Plnt | Martinez, CA | 21.0 GWh |
#1395 | Bucksport Generation LLC | Bucksport, ME | 21.0 GWh |
#1396 | Welport Lease Project | McKittrick, CA | 20.7 GWh |
#1397 | EQX011 Duane Fuel Cell | Santa Clara, CA | 20.6 GWh |
#1398 | Badger Creek Limited | Bakersfield, CA | 20.6 GWh |
#1399 | Bronx Zoo | New York, NY | 20.4 GWh |
#1400 | POET Biorefining - Portland | Portland, IN | 20.1 GWh |
#1401 | Alsey | Alsey, IL | 20.1 GWh |
#1402 | Columbia Energy Center | Columbia, MO | 20.1 GWh |
#1403 | Baptist Medical Center | Jacksonville, FL | 19.9 GWh |
#1404 | Plains End II LLC | Arvada, CO | 19.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hutchinson Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Cheney Solar | Cheney, KS | 2.5 GWh | 33.4 mi |
City of Pratt Solar | Pratt, KS | 9.9 GWh | 53.1 mi |
DeGraff Butler Electric | Burns, KS | 2.4 GWh | 55.7 mi |
Diamond Vista Wind Project, LLC | Tampa, KS | 982.0 GWh | 48.8 mi |
Ellinwood | Ellinwood, KS | 48.0 MWh | 42.6 mi |
Flat Ridge 2 Wind Energy LLC | Zenda, KS | 1.1 TWh | 54.3 mi |
Flat Ridge 3 | Zenda, KS | 538.2 GWh | 52.9 mi |
Gordon Evans Energy Center | Colwich, KS | 401.1 GWh | 28.3 mi |
Kansas Ethanol, LLC | Lyons, KS | 113.4 GWh | 21.9 mi |
Kingman Wind | Cunningham, KS | 777.4 GWh | 51.9 mi |
McPherson 2 | McPherson, KS | 37.8 GWh | 21.5 mi |
McPherson 3 | McPherson, KS | 15.5 GWh | 25.1 mi |
Mulvane 2 | Mulvane, KS | 20.0 MWh | 54.7 mi |
Ninnescah Wind Energy, LLC | Cunningham, KS | 806.6 GWh | 51.9 mi |
Prairie Sky Solar Farm | Andover, KS | 1.8 GWh | 49.5 mi |
St John | St. John, KS | 17.0 MWh | 48.6 mi |
Sterling | Sterling, KS | 157.0 MWh | 20 mi |
Sunflower Energy Center, LLC | Peabody, KS | 808.8 GWh | 46 mi |
Westar Cities Solar | Hutchinson, KS | 2.2 GWh | 7.4 mi |
Wichita Plant | Wichita, KS | 66.0 MWh | 42.9 mi |