Hunterstown Power Plant
1731 Hunterstown Road, Gettysburg, PA 17325Plant Summary Information
Hunterstown Power Plant is ranked #21 out of 231 power plants in Pennsylvania in terms of total annual net electricity generation.
Hunterstown Power Plant is comprised of 4 generators and generated 1.6 TWh during the 3-month period between May 2024 to August 2024.
Plant Name | Hunterstown Power Plant |
---|---|
Utility Name | Kestrel Acquisition, LLC |
Location | Adams County, PA |
Initial Operation Date | July 2003 |
Last Update | Aug 2024 |
Annual Generation | 4.2 TWh |
Annual Consumption | 34.1 M MMBtu |
Ranked #267 out of 11,835 Power Plants Nationwide | |
Ranked #146 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #21 out of 231 Pennsylvania Power Plants | |
Ranked #17 out of 78 Pennsylvania Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
NRG Wholesale Generation LP (2013 to 2017) Kestrel Acquisition, LLC (2018 to 2023) |
Map of Hunterstown Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hunterstown Power Plant.
Monthly Net Generation for Hunterstown Power Plant
Hunterstown Power Plant Details
Summary Information | |
---|---|
Plant Name | Hunterstown Power Plant (55976) |
Plant Address | 1731 Hunterstown Road, Gettysburg, PA 17325 |
Utility | Kestrel Acquisition, LLC (61913) |
Latitude, Longitude | 39.8725, -77.1672 |
Generation Dates on File | Oct 2003 to Aug 2024 |
Initial Operation Date | July 2003 |
Annual Generation | 4.2 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 04-77-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Metropolitan Edison Co (12390) PA |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | TEXAS EASTERN TRANSMISSION LP |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator 101 Details Operating July 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CT1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | 10700784 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 10700784 |
Nameplate Capacity | 179 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 165.6 MW |
Winter Capacity | 205.9 MW |
Minimum Load | 85 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 201 Details Operating July 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CT1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | 10700785 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 10700785 |
Nameplate Capacity | 179 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 164.4 MW |
Winter Capacity | 205.3 MW |
Minimum Load | 85 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 301 Details Operating July 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CT1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 179 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 163.2 MW |
Winter Capacity | 204 MW |
Minimum Load | 85 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 401 Details Operating July 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CT1 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 361 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 317.3 MW |
Winter Capacity | 322.9 MW |
Minimum Load | 194 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2003 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Hunterstown Power Plant Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#136 | Cricket Valley Energy | Dover, NY | 4.3 TWh |
#137 | Buck | Salisbury, NC | 4.3 TWh |
#138 | Central Alabama Generating Station | Billingsley, AL | 4.3 TWh |
#139 | Astoria Energy | New York, NY | 4.3 TWh |
#140 | ExxonMobil Beaumont Refinery | Beaumont, TX | 4.4 TWh |
#141 | Astoria Energy II | Astoria, NY | 4.2 TWh |
#142 | Woodbridge Energy Center | Keasbey, NJ | 4.2 TWh |
#143 | Rowan | Salisbury, NC | 4.2 TWh |
#144 | Allegheny Energy Units 3 4 & 5 | Springdale, PA | 4.2 TWh |
#145 | Ratcliffe | De Kalb, MS | 4.2 TWh |
#147 | Cane Island | Intercession City, FL | 4.2 TWh |
#148 | Green Country Energy LLC | Jenks, OK | 4.1 TWh |
#149 | Pastoria Energy Facility, LLC | Lebec, CA | 4.1 TWh |
#150 | Dell Power Station | Dell, AR | 4.1 TWh |
#151 | Tracy | Sparks, NV | 4.0 TWh |
#152 | L V Sutton Combined Cycle | Wilmington, NC | 4.0 TWh |
#153 | Delta Energy Center | Pittsburg, CA | 4.0 TWh |
#154 | John S Rainey | Starr, SC | 4.0 TWh |
#155 | Tenaska Frontier Generation Station | Shiro, TX | 4.0 TWh |
#156 | Hermiston Power Partnership | Hermiston, OR | 4.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hunterstown Power Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adams Solar LLC PA | Gettysburg, PA | 106.8 GWh | 1.7 mi |
Baker Point | Thurmont, MD | 12.9 GWh | 23.3 mi |
Blue Ridge Landfill | Chambersburg, PA | 45.9 GWh | 21.8 mi |
Bomber CSG | Hampstead, MD | 9.0 GWh | 25.2 mi |
CASD Solar | Carlisle, PA | 1.0 MWh | 23.7 mi |
Cumberland County PA LFG Recovery | Shippensburg, PA | 45.8 GWh | 25.6 mi |
Dickinson Solar | Carlisle, PA | 3.8 GWh | 22.6 mi |
Emmitsburg Solar Arrays | Emmitsburg, MD | 2.5 GWh | 14.6 mi |
Falling Spring | Chambersburg, PA | 906.0 MWh | 26.4 mi |
FFP - MD Foxhall | Freeland, MD | 1.4 GWh | 26.2 mi |
Haleon York RDC Solar Facility | York, PA | 1.6 GWh | 25.7 mi |
Hunterstown | Gettysburg, PA | 39.5 GWh | 0.5 mi |
Knouse Solar Project 1 | Gardners, PA | 4.2 GWh | 11.2 mi |
Mount Saint Mary's | Emmitsburg, MD | 17.6 GWh | 16.6 mi |
Mountain | Mount Holly Springs, PA | 5.4 GWh | 17.3 mi |
Pixelle Specialty Solutions LLC - Spring Grove Facility | Spring Grove, PA | 387.5 GWh | 15.9 mi |
Shepherds Mill CSG | Union Bridge, MD | 3.5 GWh | 21.4 mi |
Union Bridge Solar | Union Bridge, MD | 12.3 GWh | 21.4 mi |
Vitro Architectural Glass (PA) | Carlisle, PA | 72.5 MWh | 17.5 mi |
York County Resource Recovery | York, PA | 249.9 GWh | 25.4 mi |