Hunter

UT Hwy 10, S. of Castle Dale, Castle Dale, UT 84513

Plant Summary Information

Hunter is ranked #29 out of 129 coal plants nationwide in terms of total annual net electricity generation.

Hunter is comprised of 3 generators and generated 1.2 TWh during the 3-month period between May 2024 to August 2024.

Plant NameHunter
Utility NamePacifiCorp
LocationEmery County, UT
Initial Operation DateJune 1978
Last Update Aug 2024
Annual Generation 3.4 TWh
Annual Consumption 46.3 M MMBtu
Ranked #335 out of 11,835 Power Plants Nationwide
Ranked #29 out of 129 Bituminous Coal Power Plants Nationwide
Ranked #3 out of 121 Utah Power Plants
Ranked #2 out of 4 Utah Bituminous Coal Power Plants
Fuel Types Bituminous Coal : 99.7%

Map of Hunter

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hunter.

Create Your Account Today

Monthly Net Generation for Hunter

Hunter Details

Summary Information
Plant NameHunter (6165)
Plant AddressUT Hwy 10, S. of Castle Dale, Castle Dale, UT 84513
UtilityPacifiCorp (14354)
Latitude, Longitude39.1747, -111.0289
Generation Dates on FileJan 2001 to Aug 2024
Initial Operation DateJune 1978
Annual Generation 3.4 TWh
Fuel Types Bituminous Coal : 99.7%
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionWECC
Balancing AuthorityPacifiCorp - East (PACE)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceCottonwood Creek
Ash Impoundment No
Transmission / Distribution OwnerPacifiCorp (14354) UT
Grid Voltage 345.00 kV
Energy StorageNo

Generator 1 Details Operating June 1978

TechnologyConventional Steam Coal
Prime MoverSteam Turbine
OwnershipJointly Owned
Nameplate Capacity488.3 MW
Nameplate Power Factor0.93
Summer Capacity446 MW
Winter Capacity446 MW
Minimum Load80 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1978
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceBituminous Coal
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Time From Cold Shutdown To Full LoadOVER
Pulverized Coal TechnologyYes
Subcritical TechnologyYes
Multiple FuelsNo

Generator 2 Details Operating June 1980

TechnologyConventional Steam Coal
Prime MoverSteam Turbine
OwnershipJointly Owned
Nameplate Capacity488.3 MW
Nameplate Power Factor0.93
Summer Capacity446 MW
Winter Capacity446 MW
Minimum Load80 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1980
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceBituminous Coal
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Time From Cold Shutdown To Full LoadOVER
Pulverized Coal TechnologyYes
Subcritical TechnologyYes
Multiple FuelsNo

Generator 3 Details Operating June 1983

TechnologyConventional Steam Coal
Prime MoverSteam Turbine
OwnershipSingle Owner
Nameplate Capacity495.6 MW
Nameplate Power Factor0.94
Summer Capacity471 MW
Winter Capacity471 MW
Minimum Load60 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 1983
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceBituminous Coal
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Time From Cold Shutdown To Full LoadOVER
Pulverized Coal TechnologyYes
Subcritical TechnologyYes
Multiple FuelsNo

Hunter Plant Owners

Owner NameAddressGeneratorOwnership
PacifiCorp825 NE Multnomah, Suite 600, Portland, OR 97232Generator 193.75%
Provo City Corp251 West 800 North Street, Provo, UT 84601Generator 16.25%
PacifiCorp825 NE Multnomah, Suite 600, Portland, OR 97232Generator 260.31%
Deseret Generation & Tran Coop10714 South Jordan Gateway, South Jordan, UT 84095Generator 225.10%
Utah Associated Mun Power Sys155 North 400 West, Salt Lake City, UT 84103Generator 214.59%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Bituminous Coal.

RankPlant NamePlant LocationAnnual Generation
#19Kyger CreekCheshire, OH4.6 TWh
#20Longview Power PlantMaidsville, WV4.3 TWh
#21FirstEnergy Fort Martin Power StationMaidsville, WV4.3 TWh
#22Crystal RiverCrystal River, FL16.5 TWh
#23James E. Rogers Energy ComplexCliffside, NC6.4 TWh
#24Marshall (NC)Terrell, NC7.2 TWh
#25WarrickNewburgh, IN3.7 TWh
#26Intermountain Power ProjectDelta, UT4.1 TWh
#27Mt StormMount Storm, WV3.5 TWh
#28MeromSullivan, IN3.4 TWh
#30Mitchell (WV)Captina, WV3.4 TWh
#31AES PetersburgPetersburg, IN3.3 TWh
#32BonanzaVernal, UT3.3 TWh
#33WinyahGeorgetown, SC3.2 TWh
#34W H SammisStratton, OH3.1 TWh
#35Belews CreekBelews Creek, NC8.6 TWh
#36ConemaughNew Florence, PA2.9 TWh
#37Seminole (FL)Palatka, FL11.1 TWh
#38KeystoneShelocta, PA2.8 TWh
#39D B WilsonCentertown, KY2.7 TWh

Nearby Power Plants

Below are closest 20 power plants surrounding Hunter.

Plant NamePlant LocationAnnual GenerationDistance
BartholomewSpringville, UT1.7 GWh73 mi
Castle Solar, LLCHuntington, UT55.6 GWh11.2 mi
Clover Creek Solar Community SolarMona, UT200.0 GWh64.9 mi
Currant CreekMona, UT2.8 TWh64.2 mi
Graphite Solar IWellington, UT189.3 GWh30.9 mi
Gunnison SolarGunnison, UT3.9 GWh41.4 mi
Hunter Solar LLC (UT)Clawson, UT268.9 GWh2.5 mi
HuntingtonHuntington, UT2.5 TWh14.4 mi
Hydro Plant No 3east of Ephraim, UT2.8 GWh16.5 mi
Manti LowerManti, UT1.8 GWh32.2 mi
Manti UpperManti, UT58.0 MWh32.2 mi
Nebo Power StationPayson, UT823.4 GWh71.7 mi
Pavant Solar II LLCFillmore, UT102.4 GWh70.4 mi
Pavant Solar IIIFilmore, UT40.8 GWh71.3 mi
PaysonPayson, UT5.0 MWh71.7 mi
Sigurd Solar LLCSigurd, UT207.6 GWh57 mi
Spanish ForkSpanish Fork, UT11.5 GWh69.7 mi
Spanish Fork Wind Park 2 LLCSpanish Fork, UT42.1 GWh68.6 mi
Sunnyside Cogen AssociatesSunnyside, UT306.3 GWh42.7 mi
Unit 4Mt Pleasent, UT3.2 GWh32.9 mi