Horseshoe Bend Wind LLC
6889 Eight Mile Road, Arlington, OR 97812Plant Summary Information
Horseshoe Bend Wind LLC is ranked #21 out of 255 power plants in Oregon in terms of total annual net electricity generation.
Horseshoe Bend Wind LLC generated 162.0 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Horseshoe Bend Wind LLC |
---|---|
Utility Name | Caithness Shepherds Flat LLC |
Location | Gilliam County, OR |
Initial Operation Date | July 2012 |
Last Update | Sep 2024 |
Annual Generation | 579.6 GWh |
Annual Consumption | 2.2 M MMBtu |
Ranked #1,133 out of 11,852 Power Plants Nationwide | |
Ranked #271 out of 1,345 Wind Power Plants Nationwide | |
Ranked #21 out of 255 Oregon Power Plants | |
Ranked #4 out of 49 Oregon Wind Power Plants | |
Fuel Types | Wind |
Map of Horseshoe Bend Wind LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Horseshoe Bend Wind LLC.
Monthly Net Generation for Horseshoe Bend Wind LLC
Horseshoe Bend Wind LLC Details
Summary Information | |
---|---|
Plant Name | Horseshoe Bend Wind LLC (57550) |
Plant Address | 6889 Eight Mile Road, Arlington, OR 97812 |
Utility | Caithness Shepherds Flat LLC (56865) |
Latitude, Longitude | 45.58555, -120.00825 |
Generation Dates on File | Aug 2012 to Sep 2024 |
Initial Operation Date | July 2012 |
Annual Generation | 579.6 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG09-84-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Bonneville Power Administration (1738) OR |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator HORSE Details Operating July 2012
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 290 MW |
Summer Capacity | 290 MW |
Winter Capacity | 290 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 116 |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 116 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.5-127 |
Design Wind Speed | 26.8 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 279 |
Horseshoe Bend Wind LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#261 | Langford Wind Power | Christoval, TX | 587.5 GWh |
#262 | Prairie Wind Farm | Montezuma, IA | 587.3 GWh |
#263 | Heart of Texas Wind Project | Brady, TX | 586.8 GWh |
#264 | Kings Point Wind Energy Center | Golden City, MO | 585.4 GWh |
#265 | Carousel Wind Farm LLC | Burlington, CO | 583.9 GWh |
#266 | Castle Gap Wind | Goldthwaite, TX | 583.4 GWh |
#267 | Border Winds Wind Farm | Rolla, ND | 583.3 GWh |
#268 | Limon Wind I | Limon, CO | 582.1 GWh |
#269 | English Farms | Montezuma, IA | 581.3 GWh |
#270 | Minonk Wind Farm | Minonk, IL | 580.4 GWh |
#272 | South Hurlburt Wind LLC | Arlington, OR | 579.2 GWh |
#273 | Cranell Wind Farm LLC | TBD, TX | 578.9 GWh |
#274 | Merricourt Wind Energy Center | Kulm, ND | 578.5 GWh |
#275 | North Hurlburt Wind LLC | Arlington, OR | 577.6 GWh |
#276 | FPL Energy Story Wind LLC | Zearing, IA | 573.8 GWh |
#277 | Bronco Plains Wind II, LLC | Kit Carson, CO | 572.6 GWh |
#278 | Oso Grande Wind Farm | Maljamar, NM | 572.4 GWh |
#279 | Weatherford Wind Energy Center | Weatherford, OK | 571.7 GWh |
#280 | Blue Cloud Wind Energy LLC | Sudan, TX | 571.6 GWh |
#281 | Wheatridge Hybrid | Morrow, OR | 694.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Horseshoe Bend Wind LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arlington Wind Power Project | Arlington, OR | 177.8 GWh | 13 mi |
Carty Generating Station | Boardman, OR | 3.1 TWh | 12.2 mi |
Finley Buttes Landfill Gas | Boardman, OR | 32.4 GWh | 20.5 mi |
Harvest Wind Project | Roosevelt, WA | 216.8 GWh | 22.7 mi |
Leaning Juniper | Arlington, OR | 254.7 GWh | 10.8 mi |
Leaning Juniper Wind Power II | Arlington, OR | 378.1 GWh | 13 mi |
Montague Solar | Arlington, OR | 300.5 GWh | 8.9 mi |
Montague Wind Power Facility LLC | Arlington, OR | 491.2 GWh | 4 mi |
North Hurlburt Wind LLC | Arlington, OR | 577.6 GWh | 10.7 mi |
Pebble Springs Wind LLC | Wasco, OR | 190.5 GWh | 10.4 mi |
South Hurlburt Wind LLC | Arlington, OR | 579.2 GWh | 9 mi |
Star Point Wind Project LLC | Wasco, OR | 194.0 GWh | 23.4 mi |
Threemile Canyon | Boardman, OR | 19.5 GWh | 7.1 mi |
Threemile Digester | Boardman, OR | 37.6 GWh | 10 mi |
Waste Management Columbia Ridge LFGTE | Arlington, OR | 79.7 GWh | 14 mi |
Wheat Field Wind Power Project | Arlington, OR | 190.8 GWh | 16.2 mi |
Wheatridge 1 | Lexington, OR | 278.3 GWh | 18.2 mi |
Wheatridge Hybrid | Morrow, OR | 694.2 GWh | 18.2 mi |
White Creek Wind Farm | Roosevelt, WA | 446.8 GWh | 22.6 mi |
Willow Creek Energy Center | Lone, OR | 140.0 GWh | 4.8 mi |