Horse Creek Wind Farm
694 CR 284, Weinert, TX 76388Plant Summary Information
Horse Creek Wind Farm is ranked #40 out of 218 wind farms in Texas in terms of total annual net electricity generation.
Horse Creek Wind Farm generated 204.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Horse Creek Wind Farm |
---|---|
Utility Name | Horse Creek Wind, LLC |
Location | Haskell County, TX |
Initial Operation Date | October 2016 |
Last Update | Dec 2023 |
Annual Generation | 818.8 GWh |
Annual Consumption | 3.0 M MMBtu |
Ranked #859 out of 11,835 Power Plants Nationwide | |
Ranked #122 out of 1,343 Wind Power Plants Nationwide | |
Ranked #146 out of 749 Texas Power Plants | |
Ranked #40 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Map of Horse Creek Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Horse Creek Wind Farm.
Monthly Net Generation for Horse Creek Wind Farm
Horse Creek Wind Farm Details
Summary Information | |
---|---|
Plant Name | Horse Creek Wind Farm (60339) |
Plant Address | 694 CR 284, Weinert, TX 76388 |
Utility | Horse Creek Wind, LLC (60129) |
Latitude, Longitude | 33.35, -99.54 |
Generation Dates on File | Oct 2016 to Dec 2023 |
Initial Operation Date | October 2016 |
Annual Generation | 818.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 16-41-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Electric Transmission Texas LLC (50174) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator HCWF Details Operating October 2016
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | HORSECRK_RN |
RTO ISO Location Designation For Reporting Wholesale Sales Data | HORSECRK_RN |
Nameplate Capacity | 230 MW |
Summer Capacity | 230 MW |
Winter Capacity | 230 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 100 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 100 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.3-116 |
Design Wind Speed | 14.1 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.5 |
Horse Creek Wind Farm Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#112 | Isabella Wind Park | Rosebush, MI | 848.4 GWh |
#113 | Canadian Breaks, LLC | Vega, TX | 841.7 GWh |
#114 | Cimarron Bend Wind Project I, LLC | Minneola, KS | 840.5 GWh |
#115 | O'Brien Wind | Primghar, IA | 834.6 GWh |
#116 | Tecolote Wind LLC | Duran, NM | 834.4 GWh |
#117 | Pioneer Prairie Wind Farm | McIntire, IA | 831.2 GWh |
#118 | Haystack Wind Project, LLC | Carroll, NE | 827.8 GWh |
#119 | Roundhouse Wind Energy Project | Cheyenne, WY | 827.6 GWh |
#120 | Blazing Star 2 Wind Farm | Hendricks, MN | 822.7 GWh |
#121 | Buffalo Dunes Wind Project | Satanta, KS | 821.0 GWh |
#123 | Red Dirt Wind Project | Hennessy, OK | 814.2 GWh |
#124 | Blazing Star Wind Farm 1 | Hendricks, MN | 812.3 GWh |
#125 | Javelina Wind Energy, LLC | Mirando City, TX | 811.3 GWh |
#126 | Plum Creek Wind Project (NE) | Winside, NE | 810.2 GWh |
#127 | Ninnescah Wind Energy, LLC | Cunningham, KS | 810.0 GWh |
#128 | Lundgren Wind Project | Otho, IA | 805.8 GWh |
#129 | Sunflower Energy Center, LLC | Peabody, KS | 805.4 GWh |
#130 | Cimarron Bend Wind Project II, LLC | Minneola, KS | 804.4 GWh |
#131 | Golden West Power Partners LLC | Calhan, CO | 803.4 GWh |
#132 | Flat Top Wind I | Mullin, TX | 803.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Horse Creek Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ANSON Solar Center, LLC | Anson, TX | 318.9 GWh | 43.2 mi |
Azure Sky Solar | Haskell, TX | 505.1 GWh | 23.1 mi |
Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.2 TWh | 20.2 mi |
El Campo Wind | Truscott, TX | 741.3 GWh | 28.5 mi |
Foard City Wind | Crowell, TX | 1.2 TWh | 40.7 mi |
Green Pastures Wind I | Seymour, TX | 89.4 GWh | 20.6 mi |
Green Pastures Wind II | Seymour, TX | 178.7 GWh | 20.5 mi |
Griffin Trail Wind | E Seymour, TX | 757.1 GWh | 18.1 mi |
Hackberry Wind Farm | Albany, TX | 352.4 GWh | 40.8 mi |
Inertia Wind Project | Haskell, TX | 1.2 TWh | 11.7 mi |
King Creek Wind Farm 1, LLC | Throckmorton, TX | 552.4 GWh | 7 mi |
King Creek Wind Farm 2, LLC | Throckmorton, TX | 639.1 GWh | 14.5 mi |
Mesquite Wind Power LLC | Abilene, TX | 414.7 GWh | 50.1 mi |
OCI Alamo 7 LLC | Haskell, TX | 250.2 GWh | 21.4 mi |
Seymour Hills Wind Project, LLC | Seymour, TX | 135.5 GWh | 25.5 mi |
TG East | Truscott, TX | 1.1 TWh | 28.3 mi |
Trinity Hills | Olney, TX | 786.1 GWh | 47.8 mi |
Western Trail Wind, LLC | Electra, TX | 888.2 GWh | 44.2 mi |
Willow Springs Wind Farm | Weinert, TX | 906.6 GWh | 4.9 mi |
Young Wind | Graham, TX | 1.6 TWh | 42.8 mi |