Horry Land Fill Gas Site
1880 Hwy 90, Conway, SC 29526Plant Summary Information
Horry Land Fill Gas Site is ranked #5 out of 8 landfill gas power plants in South Carolina in terms of total annual net electricity generation.
Horry Land Fill Gas Site is comprised of 3 generators and generated 2.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Horry Land Fill Gas Site |
---|---|
Utility Name | South Carolina Public Service Authority |
Location | Horry County, SC |
Initial Operation Date | August 2001 |
Last Update | Dec 2023 |
Annual Generation | 8.4 GWh |
Annual Consumption | 98.1 k MMBtu |
Ranked #6,445 out of 11,835 Power Plants Nationwide | |
Ranked #241 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #104 out of 190 South Carolina Power Plants | |
Ranked #5 out of 8 South Carolina Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Horry Land Fill Gas Site
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Horry Land Fill Gas Site.
Monthly Net Generation for Horry Land Fill Gas Site
Horry Land Fill Gas Site Details
Summary Information | |
---|---|
Plant Name | Horry Land Fill Gas Site (7958) |
Plant Address | 1880 Hwy 90, Conway, SC 29526 |
Utility | South Carolina Public Service Authority (17543) |
Latitude, Longitude | 33.8125, -78.96722 |
Generation Dates on File | Jan 2002 to Dec 2023 |
Initial Operation Date | August 2001 |
Annual Generation | 8.4 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | South Carolina Public Service Authority (SC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Horry Electric Coop Inc (8786) SC |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator HG1 Details Operating August 2001
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2001 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator HG2 Details Operating August 2001
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2001 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator HG3 Details Operating March 2003
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2003 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Horry Land Fill Gas Site Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#231 | Frederick County LFGTE Facility | Winchester, VA | 9.4 GWh |
#232 | Ameresco Johnson Canyon | Gonzales, CA | 9.3 GWh |
#233 | Adrian Energy Associates LLC | Adrian, MI | 9.3 GWh |
#234 | New River Clean Energy | Beckley, WV | 9.1 GWh |
#235 | Veolia ES Blackfoot Landfill Facility | Winslow, IN | 9.0 GWh |
#236 | Ameresco Janesville | Janesville, WI | 9.0 GWh |
#237 | Hardin County LFGTE | Elizabethtown, KY | 8.9 GWh |
#238 | Norther Tier Landfill | Burlington, PA | 8.8 GWh |
#239 | G2 Energy Marion LLC | Ocala, FL | 8.7 GWh |
#240 | Nelson Gardens Landfill Gas to Energy | San Antonio, TX | 8.5 GWh |
#242 | Terreva Wayne County RNG, LLC | Dudley, NC | 8.2 GWh |
#243 | MM Taunton Energy | Taunton, MA | 8.1 GWh |
#244 | Sonoma Central Landfill Phase I | Petaluma, CA | 8.1 GWh |
#245 | Waste Management Northern Oaks LFGTE | Harrison, MI | 8.0 GWh |
#246 | CII Methane Management IV, LLC | Smithfield, NC | 7.9 GWh |
#247 | Prairie Bluff | Houston, MS | 7.8 GWh |
#248 | Flathead Landfill to Gas Energy Facility | Kalispell, MT | 7.8 GWh |
#249 | White Street Renewables | Greensboro, NC | 14.1 GWh |
#250 | COC Surry LFG, LLC | Mount Airy, NC | 7.6 GWh |
#251 | Henrico | Glen Allen, VA | 7.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Horry Land Fill Gas Site.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Acme Solar, LLC | Riegelwood, NC | 7.8 GWh | 35.4 mi |
Arthur 2 Solar | Tabor City, NC | 7.3 GWh | 25.3 mi |
Arthur Solar, LLC | Tabor City, NC | 10.1 GWh | 25 mi |
Beckwith Solar | Tabor City, NC | 9.4 GWh | 23.8 mi |
Bell Bay Solar Farm | Conway, SC | 2.5 GWh | 10.4 mi |
Broadway Solar Center, LLC | Chadbourn, NC | 7.7 GWh | 35.2 mi |
Cardinal Solar LLC | Marion, SC | 16.3 GWh | 35.9 mi |
Chadbourn Farm | Whiteville, NC | 8.6 GWh | 37.2 mi |
Cherry Blossom Solar LLC | Hemingway, SC | 20.9 GWh | 28.4 mi |
Dessie Solar Center LLC | Chadbourn, NC | 8.4 GWh | 34.7 mi |
Freedom Solar | Nichols, SC | 7.8 GWh | 34.4 mi |
Garrell Solar Farm | Chadbourn, NC | 7.2 GWh | 36.8 mi |
Goldenrod Solar | Pamplico, SC | 3.9 GWh | 35.7 mi |
Graham Solar Center LLC | Fair Bluff, NC | 8.5 GWh | 34.5 mi |
Hubble Solar, LLC | Whiteville, NC | 2.3 GWh | 36.8 mi |
International Paper Georgetown Mill | Georgetown, SC | 495.9 GWh | 36.7 mi |
Landrace Holdings, LLC | Conway, SC | 95.6 GWh | 9.4 mi |
Runway Solar Farm | Myrtle Beach, SC | 3.3 GWh | 10.4 mi |
Washington Solar (SC) | Mullins, SC | 2.5 GWh | 33.6 mi |
Willis Solar | Pamplico, SC | 3.9 GWh | 36.3 mi |