Hopkinton Phase 2
0 Gray Lane, Ashaway, RI 2804Plant Summary Information
Hopkinton Phase 2 is ranked #35 out of 54 solar farms in Rhode Island in terms of total annual net electricity generation.
Hopkinton Phase 2 generated 950.5 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Hopkinton Phase 2 |
---|---|
Utility Name | Vista Solar, Inc. |
Location | Washington County, RI |
Initial Operation Date | September 2020 |
Last Update | Dec 2022 |
Annual Generation | 3.7 GWh |
Annual Consumption | 13.4 k MMBtu |
Ranked #8,198 out of 11,249 Power Plants Nationwide | |
Ranked #3,201 out of 5,158 Solar Power Plants Nationwide | |
Ranked #59 out of 87 Rhode Island Power Plants | |
Ranked #35 out of 54 Rhode Island Solar Power Plants | |
Fuel Types | Solar |
Map of Hopkinton Phase 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hopkinton Phase 2.
Monthly Net Generation for Hopkinton Phase 2
Hopkinton Phase 2 Details
Summary Information | |
---|---|
Plant Name | Hopkinton Phase 2 (63191) |
Plant Address | 0 Gray Lane Ashaway, RI 2804 |
Utility | Vista Solar, Inc. (62701) |
Latitude, Longitude | 41.44329, -71.79113 |
Generation Dates on File | Sep 2020 to Dec 2022 |
Initial Operation Date | September 2020 |
Annual Generation | 3.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | The Narragansett Electric Co (13214) RI |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator HTP2 Details Operating September 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 2.5 MW |
Summer Capacity | 2.5 MW |
Winter Capacity | 1.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 2.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Hopkinton Phase 2 Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Hopkinton Industrial Park LLC | 401 Main St, Ashaway, RI 2804 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3191 | Mount Hope East | Mount Hope, NY | 3.8 GWh |
#3192 | Strauss CSG | Geneva, NY | 3.8 GWh |
#3193 | Manheim New England | North Dighton, MA | 3.8 GWh |
#3194 | Barrow Solar | Somers, CT | 3.8 GWh |
#3195 | Lafayette Horizon Solar CSG LLC | Lafayette, CO | 3.8 GWh |
#3196 | NSE Camber Solar PS13 LLC (CSG) | Sterling, CO | 3.8 GWh |
#3197 | Stafford St 2 Community Solar | Lecister, MA | 3.8 GWh |
#3198 | Watts 3115 | Adelanto, CA | 3.8 GWh |
#3199 | Frederick County - Landfill | Frederick, MD | 3.8 GWh |
#3200 | Weld 1 Community Solar Array | Platteville, CO | 3.7 GWh |
#3202 | Kearsarge East Providence | East Providence, RI | 3.7 GWh |
#3203 | Fogarty CSG | Middletown, NY | 3.7 GWh |
#3204 | Rosemond Solar Community Solar | Fallsburg, NY | 3.7 GWh |
#3205 | Arnold Cochran | Cochran, GA | 3.7 GWh |
#3206 | SulusSolar29 | Boring, OR | 3.7 GWh |
#3207 | Morgan Solar 4, LLC CSG | Murrayville, IL | 3.7 GWh |
#3208 | Wor-Wic Community College - Offsite | Hebron, MD | 3.7 GWh |
#3209 | Red Toad 1425 A Powatan Road, LLC | Clayton, NC | 3.7 GWh |
#3210 | Dartmouth Farms Solar | Dartmouth, MA | 3.7 GWh |
#3211 | IGS Frankfort 2 CSG | Frankfort, IL | 3.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hopkinton Phase 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alton Road Solar | Bradford, RI | 25.1 GWh | 3.3 mi |
Clinton Solar | Griswold, CT | 1.8 GWh | 11.2 mi |
Covanta Southeastern Connecticut Company | Preston, CT | 126.3 GWh | 14.5 mi |
Foxwoods CoGen | Mashantucket, CT | 11.4 GWh | 9 mi |
Gary Court 1 & 2 | Groton, CT | 492.1 MWh | 14 mi |
GD Hopkinton Main I, LLC | Hopkinton, RI | 17.4 GWh | 0.6 mi |
GD Richmond Buttonwoods I, LLC | Richmond, RI | 2.1 GWh | 7.8 mi |
Jackson Solar (CT) | Griswold, CT | 1.6 GWh | 11.3 mi |
Jewett City 1 | Jewett City, CT | 229.6 MWh | 14.9 mi |
Kearsarge SKSC2 LLC | South Kingstown, RI | 6.0 GWh | 13.9 mi |
Kearsarge Westerly | Westerly, RI | 7.4 GWh | 5 mi |
North Stonington Solar Center, LLC | North Stonington, CT | 5.2 GWh | 2.9 mi |
Richmond NMCA | Wood River Junction, RI | 6.9 GWh | 3.9 mi |
Sherman Solar | Griswold, CT | 1.6 GWh | 11.2 mi |
University Solar, LLC | West Greenwich, RI | 32.6 GWh | 13.6 mi |
Water Treatment 1 & 2 | Groton, CT | 553.0 MWh | 14.6 mi |
WED Kingstown Solar I - East Array | Washington, RI | 5.3 GWh | 9.5 mi |
WED Kingstown Solar I, LLC - West | Richmond, RI | 2.4 GWh | 9.3 mi |
WED Stilson Solar | Richmond, RI | 3.4 GWh | 7.5 mi |
West Greenwich Solar | West Greenwich, RI | 2.9 GWh | 14.8 mi |