Holtsville
180A Morris Ave, Holtsville, NY 11742Plant Summary Information
Holtsville is ranked #2 out of 33 kerosene power plants nationwide in terms of total annual net electricity generation.
Holtsville is comprised of 10 generators and generated 2.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Holtsville |
---|---|
Utility Name | National Grid Generation LLC |
Location | Suffolk County, NY |
Initial Operation Date | July 1974 |
Last Update | Dec 2023 |
Annual Generation | 15.9 GWh |
Annual Consumption | 336.2 k MMBtu |
Ranked #5,344 out of 11,852 Power Plants Nationwide | |
Ranked #2 out of 33 Kerosene Power Plants Nationwide | |
Ranked #235 out of 832 New York Power Plants | |
Ranked #2 out of 13 New York Kerosene Power Plants | |
Fuel Types | Kerosene |
Map of Holtsville
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Holtsville.
Monthly Net Generation for Holtsville
Holtsville Details
Summary Information | |
---|---|
Plant Name | Holtsville (8007) |
Plant Address | 180A Morris Ave, Holtsville, NY 11742 |
Utility | National Grid Generation LLC (56505) |
Latitude, Longitude | 40.81704, -73.06627 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | July 1974 |
Annual Generation | 15.9 GWh |
Fuel Types | Kerosene |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Long Island Power Authority (11171) NY |
Grid Voltage | 69.00 kV / 138.00 kV |
Energy Storage | No |
Generator 1 Details Operating July 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 23690 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 23690 |
Nameplate Capacity | 56.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 55.5 MW |
Winter Capacity | 62.1 MW |
Minimum Load | 37.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1974 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Kerosene |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 2 Details Operating July 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 23691 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 23691 |
Nameplate Capacity | 56.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 55.6 MW |
Winter Capacity | 61.3 MW |
Minimum Load | 35.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1974 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Kerosene |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 3 Details Operating July 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 23692 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 23692 |
Nameplate Capacity | 56.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 51 MW |
Winter Capacity | 64.8 MW |
Minimum Load | 35.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1974 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Kerosene |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 4 Details Operating July 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 23693 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 23693 |
Nameplate Capacity | 56.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 52.4 MW |
Winter Capacity | 64.3 MW |
Minimum Load | 35.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1974 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Kerosene |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 5 Details Operating July 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 23694 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 23694 |
Nameplate Capacity | 56.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 53.4 MW |
Winter Capacity | 65 MW |
Minimum Load | 40.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1974 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Kerosene |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 10 Details Operating July 1975
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 23699 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 23699 |
Nameplate Capacity | 56.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 54.1 MW |
Winter Capacity | 65.6 MW |
Minimum Load | 40.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1975 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Kerosene |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 6 Details Operating July 1975
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 23695 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 23695 |
Nameplate Capacity | 56.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 50.4 MW |
Winter Capacity | 65.4 MW |
Minimum Load | 38.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1975 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Kerosene |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 7 Details Operating July 1975
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 23696 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 23696 |
Nameplate Capacity | 56.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 49.2 MW |
Winter Capacity | 64.8 MW |
Minimum Load | 36.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1975 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Kerosene |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 8 Details Operating July 1975
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 23697 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 23697 |
Nameplate Capacity | 56.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 55.4 MW |
Winter Capacity | 66.8 MW |
Minimum Load | 41.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1975 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Kerosene |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 9 Details Operating July 1975
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 23698 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 23698 |
Nameplate Capacity | 56.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 55.3 MW |
Winter Capacity | 69.1 MW |
Minimum Load | 40.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1975 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Kerosene |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Holtsville Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Kerosene.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Hawkeye Energy Greenport LLC | Greenport, NY | 16.4 GWh |
#3 | Shoreham Energy LLC | Shoreham, NY | 13.3 GWh |
#4 | Jamaica Bay Peaking | Far Rockaway, NY | 55.5 GWh |
#5 | Ravenswood | Long Island, NY | 2.7 TWh |
#6 | New Haven Harbor | New Haven, CT | 30.1 GWh |
#7 | Bergen Generating Station | Ridgefield, NJ | 2.3 TWh |
#8 | Astoria Gas Turbines | Astoria, NY | 33.5 GWh |
#9 | GenConn Middletown LLC | Middletown, CT | 3.5 GWh |
#10 | GenConn Devon LLC | Milford, CT | 2.3 GWh |
#11 | Sherman Avenue | Vineland, NJ | 32.9 GWh |
#12 | South Meadow | Hartford, CT | 1.5 GWh |
#13 | Cos Cob | Greenwich, CT | 1.3 GWh |
#14 | Spencer Gas Turbine | Spencer, IA | 1.2 GWh |
#15 | Berlin 5 | Berlin, VT | 1.2 GWh |
#16 | Exelon West Medway II LLC | Medway, MA | 197.3 GWh |
#17 | PSEG Burlington Generating Station | Burlington, NJ | 27.6 GWh |
#18 | Glenwood Landing | Glenwood Landing, NY | 154.4 GWh |
#19 | M Street Jet | Boston, MA | 275.0 MWh |
#20 | Cumberland (NJ) | Millville, NJ | 65.6 GWh |
#21 | 74th Street | New York, NY | 176.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Holtsville.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blydenburgh Solar Project | Haupaugge, NY | 2.8 GWh | 6.1 mi |
Brentwood Solar | Brentwood, NY | 671.0 MWh | 9.6 mi |
Caithness Long Island Energy Center | Yaphank, NY | 1.8 TWh | 6.6 mi |
Calabro Airport North Solar Project | Shirley, NY | 2.2 GWh | 10 mi |
Calabro Airport South Solar Project | Shirley, NY | 2.2 GWh | 10.9 mi |
Cohalan | Central Islip, NY | 4.9 GWh | 7.7 mi |
Deer Park | Deer Park, NY | 2.9 GWh | 7.7 mi |
Holtsville Solar Project | Holtsville, NY | 2.1 GWh | 2.2 mi |
Kings Park Solar I | Kings Park, NY | 3.4 GWh | 10.2 mi |
Kings Park Solar II | Kings Park, NY | 3.4 GWh | 10.2 mi |
Lincoln Ave Solar Project | Holbrook, NY | 3.5 GWh | 2.6 mi |
Long Island Solar Farm LLC | Upton, NY | 47.7 GWh | 11.8 mi |
MacArthur Waste to Energy Facility | Ronkonkoma, NY | 53.2 GWh | 3 mi |
Orbit Bloom Fuel Cell | Medford, NY | 42.6 GWh | 5.3 mi |
Port Jefferson | Port Jefferson, NY | 396.4 GWh | 9.2 mi |
Richard M Flynn | Holtsville, NY | 429.5 GWh | 0.1 mi |
Riverhead | Riverhead, NY | 1.5 GWh | 8.7 mi |
Stony Brook Cogen Plant | Stony Brook, NY | 288.5 GWh | 7.6 mi |
SWM Fuel Cell | Yaphank, NY | 57.4 GWh | 7.4 mi |
William Floyd School District | Mastic Beach, NY | 3.2 GWh | 11.6 mi |