Holtsville Solar Project
249 Buckley Road, Holtsville, NY 11742Plant Summary Information
Holtsville Solar Project is ranked #370 out of 452 solar farms in New York in terms of total annual net electricity generation.
Holtsville Solar Project generated 357.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Holtsville Solar Project |
---|---|
Utility Name | CVI Renewables Holdings, LLC. |
Location | Suffolk County, NY |
Initial Operation Date | December 2017 |
Last Update | Dec 2023 |
Annual Generation | 2.1 GWh |
Annual Consumption | 7.5 k MMBtu |
Ranked #9,751 out of 11,835 Power Plants Nationwide | |
Ranked #4,498 out of 5,643 Solar Power Plants Nationwide | |
Ranked #695 out of 832 New York Power Plants | |
Ranked #370 out of 452 New York Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Agilitas Energy, LLC (2017 to 2019) CVI Renewables Holdings, LLC. (2020 to 2023) |
Map of Holtsville Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Holtsville Solar Project.
Monthly Net Generation for Holtsville Solar Project
Holtsville Solar Project Details
Summary Information | |
---|---|
Plant Name | Holtsville Solar Project (61902) |
Plant Address | 249 Buckley Road, Holtsville, NY 11742 |
Utility | CVI Renewables Holdings, LLC. (63970) |
Latitude, Longitude | 40.79767, -73.03398 |
Generation Dates on File | Jan 2018 to Dec 2023 |
Initial Operation Date | December 2017 |
Annual Generation | 2.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 18-276-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Long Island Power Authority (11171) NY |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Generator HOLTS Details Operating December 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 175 |
Tilt Angle | 20 |
DC Net Capacity | 1.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Holtsville Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4488 | Ontario Sun | Sandy Creek, NY | 2.1 GWh |
#4489 | 100 Brook Hill Drive Solar | West Nyack, NY | 2.1 GWh |
#4490 | Billings Road | Hardwick, VT | 2.1 GWh |
#4491 | Grafton Solar | Grafton, MA | 2.1 GWh |
#4492 | Broadalbin-Perth Solar | Amsterdam, NY | 2.1 GWh |
#4493 | Schueler Community Solar | Annandale, MN | 2.1 GWh |
#4494 | USS Reindeer Solar LLC CSG | Sauk Rapids, MN | 2.1 GWh |
#4495 | Oberlin Spear Point Solar One | Oberlin, OH | 2.1 GWh |
#4496 | 435A Bergen Avenue | Kearney, NJ | 2.1 GWh |
#4497 | Primrose Solar, LLC | Mankato, MN | 2.1 GWh |
#4499 | COU Solar I, LLC | Lisbon, NY | 2.1 GWh |
#4500 | USS Big Lake 1 Solar CSG | Big Lake, MN | 2.1 GWh |
#4501 | Solar Star Palo Alto I, LLC | Palo Alto, CA | 2.1 GWh |
#4502 | Greenwood Solar Farm | Avoca, MI | 2.1 GWh |
#4503 | Nunn | Apple Valley, CA | 2.1 GWh |
#4504 | Victor Mesa Linda B2 | Victorville, CA | 2.1 GWh |
#4505 | WHA Southbridge Solar Park CSG | Wilmington, DE | 2.1 GWh |
#4506 | Brookville Smart Bus Depot Microgrid | Silver Spring, MD | 2.2 GWh |
#4507 | ELP - Kipp | Hudson, NY | 2.1 GWh |
#4508 | USS Verbena Solar LLC | Stewart, MN | 2.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Holtsville Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blydenburgh Solar Project | Haupaugge, NY | 2.8 GWh | 7.9 mi |
Brentwood Solar | Brentwood, NY | 671.0 MWh | 11 mi |
Caithness Long Island Energy Center | Yaphank, NY | 1.8 TWh | 5 mi |
Calabro Airport North Solar Project | Shirley, NY | 2.2 GWh | 8.5 mi |
Calabro Airport South Solar Project | Shirley, NY | 2.2 GWh | 9.3 mi |
Cohalan | Central Islip, NY | 4.9 GWh | 8.7 mi |
Deer Park | Deer Park, NY | 2.9 GWh | 8.7 mi |
Holtsville | Holtsville, NY | 15.9 GWh | 2.2 mi |
Kings Park Solar II | Kings Park, NY | 3.4 GWh | 12.3 mi |
Lincoln Ave Solar Project | Holbrook, NY | 3.5 GWh | 2.8 mi |
Long Island Solar Farm LLC | Upton, NY | 47.8 GWh | 10.7 mi |
MacArthur Waste to Energy Facility | Ronkonkoma, NY | 52.6 GWh | 3.9 mi |
Orbit Bloom Fuel Cell | Medford, NY | 42.6 GWh | 3.9 mi |
Port Jefferson | Port Jefferson, NY | 446.7 GWh | 10.8 mi |
Richard M Flynn | Holtsville, NY | 429.5 GWh | 2 mi |
Riverhead | Riverhead, NY | 1.5 GWh | 10.6 mi |
Shoreham Solar Commons | Shoreham, NY | 46.9 GWh | 12.1 mi |
Stony Brook Cogen Plant | Stony Brook, NY | 288.5 GWh | 9.6 mi |
SWM Fuel Cell | Yaphank, NY | 57.4 GWh | 5.5 mi |
William Floyd School District | Mastic Beach, NY | 3.2 GWh | 9.7 mi |