Holstein 1 Solar Farm
9002 Hwy 153, Wingate, TX 79566Plant Summary Information
Holstein 1 Solar Farm is ranked #34 out of 161 solar farms in Texas in terms of total annual net electricity generation.
Holstein 1 Solar Farm generated 140.4 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Holstein 1 Solar Farm |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Nolan County, TX |
Initial Operation Date | June 2020 |
Last Update | Aug 2024 |
Annual Generation | 389.6 GWh |
Annual Consumption | 1.5 M MMBtu |
Ranked #1,530 out of 11,835 Power Plants Nationwide | |
Ranked #97 out of 5,643 Solar Power Plants Nationwide | |
Ranked #294 out of 749 Texas Power Plants | |
Ranked #34 out of 161 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
226HC 8me LLC (2018 to 2021) Duke Energy Renewables Services (2022 to 2023) |
Map of Holstein 1 Solar Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Holstein 1 Solar Farm.
Monthly Net Generation for Holstein 1 Solar Farm
Holstein 1 Solar Farm Details
Summary Information | |
---|---|
Plant Name | Holstein 1 Solar Farm (61962) |
Plant Address | 9002 Hwy 153, Wingate, TX 79566 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 32.10413, -100.16238 |
Generation Dates on File | May 2020 to Aug 2024 |
Initial Operation Date | June 2020 |
Annual Generation | 389.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG19-35-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator HSF01 Details Operating June 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 280 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Holstein 1 Solar Farm Plant Owners
Owner Name | Address | Ownership |
---|---|---|
226HC 8me, LLC | 550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#87 | Aquamarine | Lemoore, CA | 406.2 GWh |
#88 | Mount Signal Solar Farm II | Calexico, CA | 405.6 GWh |
#89 | CED Crane Solar | Crane, TX | 405.5 GWh |
#90 | Springbok Solar Farm 2 | Cantil, CA | 404.2 GWh |
#91 | Mesquite Solar 1 | Tonopah, AZ | 403.9 GWh |
#92 | Daggett 2 | Daggett, CA | 397.4 GWh |
#93 | Big Plain Solar, LLC | London, OH | 403.0 GWh |
#94 | RE Garland | Rosamond, CA | 383.7 GWh |
#95 | Yellow Pine Solar | Enterprise, NV | 377.8 GWh |
#96 | Buena Vista Energy Center | Chaparral, NM | 386.6 GWh |
#98 | Arica Solar | Desert Center, CA | 387.7 GWh |
#99 | Imperial Solar Energy Center West | Seeley, CA | 388.3 GWh |
#100 | Samson Solar Energy | Cunningham, TX | 388.3 GWh |
#101 | North Rosamond Solar LLC | Rosamond, CA | 387.0 GWh |
#102 | Castle Gap Solar Hybrid | McCarney, TX | 385.9 GWh |
#103 | Riverstart Solar Park LLC | Modoc, IN | 386.0 GWh |
#104 | Brazoria County Solar Project (Danciger) | Damon, TX | 385.6 GWh |
#105 | Mustang Two | Lemoore, CA | 385.4 GWh |
#106 | Fox Squirrel Solar | Mt Sterling, OH | 384.4 GWh |
#107 | Hillcrest Solar | Mt. Orab, OH | 380.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Holstein 1 Solar Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buffalo Gap 2 Wind Farm | Merkel, TX | 427.9 GWh | 14.8 mi |
Buffalo Gap 3 Wind Farm | Nolan, TX | 292.1 GWh | 13.2 mi |
Buffalo Gap Wind Farm | Merkel, TX | 198.5 GWh | 15.5 mi |
Callahan Divide Wind Energy Center | Tusocola, TX | 394.7 GWh | 16.1 mi |
Champion Wind Farm LLC | Roscoe, TX | 306.8 GWh | 34.9 mi |
HEB00070 | Abilene, TX | 385.0 MWh | 32.8 mi |
Horse Hollow Wind Energy Center | Wingate, TX | 2.5 TWh | 9.8 mi |
Inadale Wind Farm LLC Hybrid | Roscoe, TX | 427.2 GWh | 36.5 mi |
Jameson Gas Processing Plant | Silver, TX | 12.9 GWh | 31.2 mi |
Maryneal Windpower | Maryneal, TX | 556.5 GWh | 20.4 mi |
Mesquite Star | Roscoe, TX | 1.2 TWh | 14 mi |
South Trent Wind Farm | Sweetwater, TX | 264.8 GWh | 21.1 mi |
Sweetwater Wind 1 LLC | Sweetwater, TX | 137.6 GWh | 20.5 mi |
Sweetwater Wind 2 LLC | Sweetwater, TX | 429.5 GWh | 20.7 mi |
Sweetwater Wind 3 LLC | Sweetwater, TX | 425.5 GWh | 19.9 mi |
Sweetwater Wind 4 LLC | Roscoe, TX | 609.9 GWh | 25.9 mi |
Sweetwater Wind 5 | Roscoe, TX | 165.2 GWh | 20.9 mi |
Trent Wind Farm | Trent, TX | 535.5 GWh | 22.9 mi |
Turkey Track Wind Energy LLC | Blackwell, TX | 345.7 GWh | 9 mi |
WAL536 | Abilene, TX | 362.0 MWh | 37.6 mi |