Holly Spring Meadows
5503 Marlboro Pike, District Heights, MD 20747Plant Summary Information
Holly Spring Meadows is ranked #132 out of 140 solar farms in Maryland in terms of total annual net electricity generation.
Holly Spring Meadows generated 346.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Holly Spring Meadows |
---|---|
Utility Name | Standard Solar |
Location | Prince George's County, MD |
Initial Operation Date | July 2023 |
Last Update | Dec 2023 |
Annual Generation | 656.0 MWh |
Annual Consumption | 2.2 k MMBtu |
Ranked #10,962 out of 11,852 Power Plants Nationwide | |
Ranked #5,495 out of 5,655 Solar Power Plants Nationwide | |
Ranked #169 out of 179 Maryland Power Plants | |
Ranked #132 out of 140 Maryland Solar Power Plants | |
Fuel Types | Solar |
Map of Holly Spring Meadows
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Holly Spring Meadows.
Monthly Net Generation for Holly Spring Meadows
Holly Spring Meadows Details
Summary Information | |
---|---|
Plant Name | Holly Spring Meadows (66819) |
Plant Address | 5503 Marlboro Pike, District Heights, MD 20747 |
Utility | Standard Solar (60531) |
Latitude, Longitude | 38.86209, -76.91249 |
Generation Dates on File | Aug 2023 to Dec 2023 |
Initial Operation Date | July 2023 |
Annual Generation | 656.0 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Potomac Electric Power Co (15270) MD |
Grid Voltage | 12.07 kV |
Energy Storage | No |
Generator HOLLY Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
East West Fixed Tilt | Yes |
Tilt Angle | 13 |
DC Net Capacity | 1.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.2 MW |
Virtual Net Metering Agreement | No |
Holly Spring Meadows Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5485 | Morgan Lancaster 1 | Lancaster, CA | 688.0 MWh |
#5486 | Solar Photovoltaic Project #06 | Ontario, CA | 687.4 MWh |
#5487 | Hopewell Valley High School Hybrid | Pennington, NJ | 680.0 MWh |
#5488 | Franklin Solar 2 LLC Community Solar | Somerset, NJ | 674.0 MWh |
#5489 | Prosperity Energy Storage Facility Hybrid | Albuquerque, NM | 672.4 MWh |
#5490 | SV CSG Barrass Farms II LL | Marion, IL | 672.0 MWh |
#5491 | Brentwood Solar | Brentwood, NY | 671.0 MWh |
#5492 | Sr Byhalia, LLC | Byhalia, MS | 670.0 MWh |
#5493 | Wild Horse | Ellensburg, WA | 589.0 GWh |
#5494 | IMPA Middletown Solar Park | Middletown, IN | 663.0 MWh |
#5496 | Highland Park Borough Solar | Highland Park, NJ | 649.0 MWh |
#5497 | KDC Solar CV Cedar Lane Park LLC | West Friendship, MD | 647.0 MWh |
#5498 | UMass Boston | Dorchester, MA | 659.0 MWh |
#5499 | Camp Atterbury Microgrid Hybrid | Edinburgh, IN | 629.0 MWh |
#5500 | Hayhurst Texas Solar | Orla, TX | 637.0 MWh |
#5501 | Cougar Solar, LLC | Sanford, NC | 637.0 MWh |
#5502 | Tulare 1 and 2 | Tulare, CA | 636.0 MWh |
#5503 | KDC Solar CV O'Donnell Property LLC | West Friendship, MD | 636.0 MWh |
#5504 | KDC Solar CV Animal Control LLC | West Friendship, MD | 634.0 MWh |
#5505 | Merck | Elkton, VA | 628.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Holly Spring Meadows.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AOC, Capitol Power Plant | Washington, DC | 49.4 GWh | 5.3 mi |
DC Water Solar | Washington, DC | 5.5 GWh | 6.4 mi |
FedEx Field Solar Facility | Landover, MD | 3.5 GWh | 4.1 mi |
First Baptist Church of Glenarden | Upper Marlboro, MD | 2.8 GWh | 3.7 mi |
IGS CC, LLC | Washington, DC | 2.1 GWh | 5.9 mi |
JBAB - Washington DC | Washington, DC | 8.5 GWh | 5.2 mi |
Kirby Road Solar, LLC | Clinton, MD | 2.6 GWh | 5.8 mi |
MNCPPC Randall Farm | Upper Marlboro, MD | 2.4 GWh | 6.2 mi |
Nationals | Washington, DC | 1.7 GWh | 5.1 mi |
Oxon Run CREF | Washington, DC | 3.2 GWh | 5.6 mi |
Ridgecrest | Washington, DC | 2.2 GWh | 3.6 mi |
Sheriff Road | Hyattsville, MD | 1.9 GWh | 3.5 mi |
Sol Phoenix | Capitol Heights, MD | 4.0 GWh | 2.2 mi |
Synergen Panorama, LLC CSG | Fort Washington, MD | 8.1 GWh | 7 mi |
US GSA Heating and Transmission | Washington, DC | 34.2 GWh | 6.4 mi |
Walt Bailey Bioenergy Facility | Washington, DC | 57.1 GWh | 6.4 mi |
WMATA - Anacostia CSG | Washington, DC | 242.0 MWh | 4.4 mi |
WMATA - Naylor Rd. Metro | Temple Hills, MD | 29.0 MWh | 2.5 mi |
WMATA - S. Ave. Carport (East) (CSG) | Hillcrest Heights, MD | 956.0 MWh | 3.7 mi |
WW-DC Solar 1, LLC | Washington, DC | 1.1 GWh | 5.4 mi |