Holliston Solar CSG
58B Hopping Brook Road, Holliston, MA 1746Plant Summary Information
Holliston Solar CSG is ranked #451 out of 487 solar farms in Massachusetts in terms of total annual net electricity generation.
Holliston Solar CSG generated 255.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Holliston Solar CSG |
---|---|
Utility Name | MN8 Energy LLC |
Location | Middlesex County, MA |
Initial Operation Date | July 2015 |
Last Update | Dec 2023 |
Annual Generation | 1.4 GWh |
Annual Consumption | 5.0 k MMBtu |
Ranked #10,569 out of 11,835 Power Plants Nationwide | |
Ranked #5,218 out of 5,643 Solar Power Plants Nationwide | |
Ranked #547 out of 598 Massachusetts Power Plants | |
Ranked #451 out of 487 Massachusetts Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Marina Energy LLC (2016 to 2018) GSRP (2019 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2023) |
Map of Holliston Solar CSG
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Holliston Solar CSG.
Monthly Net Generation for Holliston Solar CSG
Holliston Solar CSG Details
Summary Information | |
---|---|
Plant Name | Holliston Solar CSG (60731) |
Plant Address | 58B Hopping Brook Road, Holliston, MA 1746 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 42.16964, -71.46822 |
Generation Dates on File | Jan 2016 to Dec 2023 |
Initial Operation Date | July 2015 |
Annual Generation | 1.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 18-2027 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | NSTAR Electric Company (54913) MA |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator PV1 Details Operating July 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2015 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 17 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | Yes |
Virtual Net Metering DC Capacity | 1.4 MW |
Holliston Solar CSG Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5208 | Shirley Landfill | Shirley, MA | 1.4 GWh |
#5209 | Toms River CSG | Toms River, NJ | 1.4 GWh |
#5210 | Parking Lot Array | Cincinnati, OH | 1.4 GWh |
#5211 | Tioga Solar Morris County 1 LLC | Morristown, NJ | 1.4 GWh |
#5212 | Malone Solar Site | Malone, NY | 1.4 GWh |
#5213 | IKEA Las Vegas 462 | Las Vegas, NV | 1.4 GWh |
#5214 | Renewable Energy Center at BJH | St Louis, MO | 1.4 GWh |
#5215 | Manchester Community College East | Manchester, CT | 1.4 GWh |
#5216 | Kearsarge Upper Union | Franklin, MA | 1.3 GWh |
#5217 | AC Criminal Courts Complex SPE2, LLC | Mays Landing, NJ | 1.4 GWh |
#5219 | Port Reading 8 Solar | Carteret, NJ | 1.4 GWh |
#5220 | IKEA Miami 327 | Miami, FL | 1.4 GWh |
#5221 | Greenville | Greenville, GA | 1.4 GWh |
#5222 | West Valley High School Solar | Hemet, CA | 1.4 GWh |
#5223 | Pleasantdale Road Community Solar | Rutland, MA | 1.4 GWh |
#5224 | FastSun 18 CSG | La Crescent, MN | 1.4 GWh |
#5225 | Arrache 4013 | Palmdale, CA | 1.4 GWh |
#5226 | Ledeaux Solar, LLC CSG | North Brookfield, MA | 1.4 GWh |
#5227 | E-Volve Energy Holdings LLC | Sealy, TX | 1.4 GWh |
#5228 | Vidalia Water Treatment Plant | Hahira, GA | 1.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Holliston Solar CSG.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
126 Grove Solar LLC | Franklin, MA | 2.1 GWh | 6.9 mi |
ANP Bellingham Energy Project | Bellingham, MA | 2.6 TWh | 4.2 mi |
ANP Blackstone Energy Project | Blackstone, MA | 2.2 TWh | 8 mi |
Ashland Solar | Ashland, MA | 6.8 GWh | 6.1 mi |
Bellingham Cogeneration Facility | Bellingham, MA | 102.2 GWh | 5.4 mi |
Bourne (MA) - Holliston I | Holliston, MA | 3.2 GWh | 0.9 mi |
BWC Muddy Brook, LLC Hybrid | Mendon, MA | 1.6 GWh | 5.4 mi |
BWC Wading River One, Two, Three CSG | Mendon, MA | 4.8 GWh | 6.6 mi |
Centaurus Solar - MA | Ashland, MA | 3.8 GWh | 6.2 mi |
Exelon Framingham LLC | Framingham, MA | 792.0 MWh | 7.6 mi |
Exelon Medway LLC | Medway, MA | 3.7 GWh | 2.3 mi |
Exelon West Medway II LLC | Medway, MA | 210.2 GWh | 2.5 mi |
GELD Solar Farm | Groton, MA | 3.5 GWh | 6.6 mi |
Holliston LLC | Holliston, MA | 2.0 GWh | 4 mi |
Hopkinton CSG | Hopkinton, MA | 2.7 GWh | 4 mi |
Kearsarge Bellingham PV | Bellingham, MA | 4.8 GWh | 6.8 mi |
Kearsarge William Way | Bellingham, MA | 7.2 GWh | 6.2 mi |
Mendon | Mendon, MA | 3.9 GWh | 5.3 mi |
Milford Power LP | Milford, MA | 210.3 GWh | 3.6 mi |
Town of Norfolk MA at Medway Branch | Norfolk, MA | 1.9 GWh | 7.2 mi |