Hollister Solar LLC
1850 Buena Vista Road, Hollister, CA 95023Plant Summary Information
Hollister Solar LLC is ranked #483 out of 799 solar farms in California in terms of total annual net electricity generation.
Hollister Solar LLC generated 659.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Hollister Solar LLC |
---|---|
Utility Name | Ecos Energy LLC |
Location | San Benito County, CA |
Initial Operation Date | December 2014 |
Last Update | Dec 2023 |
Annual Generation | 3.5 GWh |
Annual Consumption | 12.6 k MMBtu |
Ranked #8,543 out of 11,835 Power Plants Nationwide | |
Ranked #3,463 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,186 out of 1,569 California Power Plants | |
Ranked #483 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Hollister Solar LLC (2013 to 2022) Ecos Energy LLC (2023 to 2023) |
Map of Hollister Solar LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hollister Solar LLC.
Monthly Net Generation for Hollister Solar LLC
Hollister Solar LLC Details
Summary Information | |
---|---|
Plant Name | Hollister Solar LLC (59268) |
Plant Address | 1850 Buena Vista Road, Hollister, CA 95023 |
Utility | Ecos Energy LLC (58135) |
Latitude, Longitude | 36.8625, -121.42889 |
Generation Dates on File | Jan 2015 to Dec 2023 |
Initial Operation Date | December 2014 |
Annual Generation | 3.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF15-152 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 21.00 kV |
Energy Storage | No |
Generator PV10 Details Operating December 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Hollister Solar LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3453 | Otoe Solar Power Generation Station 1 LLC | Apple Valley, CA | 3.5 GWh |
#3454 | Robin NJ | Robinsville, NJ | 3.5 GWh |
#3455 | Valley Center | Valley Center, CA | 3.5 GWh |
#3456 | 1047 Little Mountain Solar, LLC | Jonesville, NC | 3.5 GWh |
#3457 | New Beginnings Solar | Kingston, NY | 3.5 GWh |
#3458 | Battle Creek Solar | Bennington, VT | 3.5 GWh |
#3459 | Arapahoe 3 Community Solar Array | Aurora, CO | 3.5 GWh |
#3460 | Goya Foods, Inc- Jersey City Solar | Jersey City, NJ | 3.5 GWh |
#3461 | Canis Major Solar Farm | Suffield, CT | 3.5 GWh |
#3462 | MHG Wallingford | Wallingford, VT | 3.5 GWh |
#3464 | PowerFin Kingsbery | Austin, TX | 3.5 GWh |
#3465 | Quincy Solar | Watkins, CO | 3.5 GWh |
#3466 | Oak Leaf Solar XXI (CSG) | Watkins, CO | 3.5 GWh |
#3467 | Rodeo Solar D2 | Lancaster, CA | 3.5 GWh |
#3468 | NY - CSG - Ellsworth II | Halfmoon, NY | 3.5 GWh |
#3469 | Wyse Fork Solar Farm, LLC | Dover, NC | 3.5 GWh |
#3470 | Mtn. Solar 2 | Watkins, CO | 3.5 GWh |
#3471 | 10 Finderne Avenue Solar, LLC | Bridgewater Town, NJ | 3.5 GWh |
#3472 | Univ of California San Diego Solar | La Jolla, CA | 3.5 GWh |
#3473 | Panda Solar NC 8, LLC | Star, NC | 3.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hollister Solar LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Johnson Canyon | Gonzales, CA | 9.3 GWh | 22.7 mi |
Ameresco Santa Cruz Energy | Watsonville, CA | 18.8 GWh | 21.7 mi |
D'Arrigo Brothers - Phase 4 | Salinas, CA | 4.1 GWh | 20.5 mi |
Dinosaur Point | Los Banos, CA | 7.9 GWh | 19.2 mi |
Dynegy Moss Landing Power Plant Hybrid | Moss Landing, CA | 4.7 TWh | 19.9 mi |
Enerparc CA1 LLC | Hollister, CA | 2.5 GWh | 2.5 mi |
Foundation Mann Packing | Gonzales, CA | 5.9 GWh | 24.8 mi |
Foundation SaIinas Valley State Prison | Soledad, CA | 5.4 GWh | 27 mi |
Gap Pacific Distribution Center | Fresno, CA | 5.7 GWh | 19.5 mi |
Gilroy Peaking Energy Center | Gilroy, CA | 27.2 GWh | 11.1 mi |
Gilroy Power Plant | Gilroy, CA | 74.5 GWh | 11.2 mi |
Graniterock Quarry | Aromas, CA | 9.1 GWh | 9.7 mi |
Marina Landfill Gas | Marina, CA | 34.0 GWh | 21.4 mi |
Monterey One Water | Marina, CA | 7.8 GWh | 21.8 mi |
Monterey Regional Water Pollution Control Agency | Marina, CA | 1.1 GWh | 22.1 mi |
Taylor Farms | Gonzales, CA | 4.0 GWh | 24.7 mi |
Taylor Farms - Schilling Place | Salinas, CA | 6.5 GWh | 18 mi |
Taylor Farms Salinas | Salinas, CA | 7.6 GWh | 17.8 mi |
TLR000 Hansen Fuel Cell | Salinas, CA | 8.3 GWh | 17.9 mi |
W R Gianelli | Gustine, CA | 95.9 GWh | 24.1 mi |