Hog Creek Wind Project is ranked #49 out of 182 power plants in Ohio in terms of total annual net electricity generation.
Hog Creek Wind Project generated 30.1 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Hog Creek Wind Project |
---|---|
Utility Name | Hog Creek Wind Project LLC |
Location | Hardin County, OH |
Initial Operation Date | December 2017 |
Last Update | Aug 2024 |
Annual Generation | 198.1 GWh |
Annual Consumption | 712.4 k MMBtu |
Ranked #2,309 out of 11,835 Power Plants Nationwide | |
Ranked #704 out of 1,343 Wind Power Plants Nationwide | |
Ranked #49 out of 182 Ohio Power Plants | |
Ranked #7 out of 22 Ohio Wind Power Plants | |
Fuel Types | Wind |
Map of Hog Creek Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hog Creek Wind Project.
Monthly Net Generation for Hog Creek Wind Project
Hog Creek Wind Project Details
Summary Information | |
---|---|
Plant Name | Hog Creek Wind Project (61330) |
Plant Address | 1853 County road . 95, Ada, OH 45810 |
Utility | Hog Creek Wind Project LLC (60969) |
Latitude, Longitude | 40.79307, -83.72871 |
Generation Dates on File | Dec 2017 to Aug 2024 |
Initial Operation Date | December 2017 |
Annual Generation | 198.1 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | American Transmission Co (659) |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator WT1 Details Operating December 2017
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 66 MW |
Summer Capacity | 66 MW |
Winter Capacity | 66 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 30 |
Turbine Details | |
Number Of Turbines | 30 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V110-2.0 |
Design Wind Speed | 14.5 MPH |
Wind Quality Class | 4 - Very Low Wind |
Turbine Hub Height Feet | 312 |
Hog Creek Wind Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#694 | Sky River Wind Energy Center | Tehachapi, CA | 201.6 GWh |
#695 | Scurry County Wind II | Snyder, TX | 201.1 GWh |
#696 | Red Mesa Wind LLC | Seboyeta, NM | 201.1 GWh |
#697 | Windthorst-2 | Archer, TX | 201.0 GWh |
#698 | Flat Water Wind Farm LLC | Du Bois, NE | 200.7 GWh |
#699 | Milo Wind Project LLC | Portales, NM | 200.6 GWh |
#700 | Osceola Windpower II | Harris, IA | 198.9 GWh |
#701 | Buffalo Gap Wind Farm | Merkel, TX | 198.5 GWh |
#702 | Corriedale Wind Energy | Cheyenne, WY | 198.3 GWh |
#703 | Spearville 3 LLC | Spearville, KS | 198.2 GWh |
#705 | NWP Indian Mesa Wind Farm | Iraan, TX | 197.8 GWh |
#706 | Ball Hill Wind Energy, LLC | Forestville, NY | 197.7 GWh |
#707 | Montezuma Wind II | Birds Landing, CA | 196.6 GWh |
#708 | Cotton Plains Wind Farm | Floydada, TX | 196.6 GWh |
#709 | Cedar Creek Wind, LLC | Shelley, ID | 194.9 GWh |
#710 | Weaver Wind | Township 16, ME | 194.9 GWh |
#711 | Nine Canyon | Kennewick, WA | 194.7 GWh |
#712 | Star Point Wind Project LLC | Wasco, OR | 194.0 GWh |
#713 | Jericho Rise Wind Farm LLC | Chateaugay, NY | 193.4 GWh |
#714 | Golden Spread Panhandle Wnd Rch | Wilderado, TX | 192.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hog Creek Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buckeye Power Inc. | Marion, OH | 3.9 GWh | 20.6 mi |
DG AMP Solar Jackson Center | Jackson Center, OH | 2.8 GWh | 29.3 mi |
Energy Developments, Hancock | Findlay, OH | 21.4 GWh | 25.2 mi |
Findlay Wind Farm | Findlay, OH | 7.2 GWh | 21.7 mi |
Hardin Solar Energy LLC | Alger, OH | 285.7 GWh | 10.2 mi |
Harpster Wind | Harpster, OH | 1.9 GWh | 26.7 mi |
Jackson Cntr Peaking | Jackson Center, OH | 34.0 MWh | 28.2 mi |
Ohio Northern University Solar Site | Ada, OH | 4.0 GWh | 6.2 mi |
POET Biorefining - Fostoria | Fostoria, OH | 21.5 GWh | 31.9 mi |
POET Biorefining - Leipsic, LLC | Leipsic, OH | 13.0 GWh | 25.9 mi |
POET Biorefining - Marion, LLC | Marion, OH | 29.7 GWh | 32.2 mi |
RP Wind | Russells Point, OH | 7.6 GWh | 25.3 mi |
Scioto Ridge Wind Farm | Belle Center, OH | 515.9 GWh | 16 mi |
Valfilm Wind Project | Findlay, OH | 6.9 GWh | 20.6 mi |
Wapakoneta-Pratt | Wapakoneta, OH | 23.0 GWh | 29.5 mi |
Whirlpool Corporation - Marion Wind Farm | Marion, OH | 8.9 GWh | 32 mi |
Whirlpool Corporation - Ottawa Wind Farm | Ottawa, OH | 3.8 GWh | 21.5 mi |
Wyandot Solar Farm | Upper Sandusky, OH | 11.4 GWh | 22.3 mi |
Zephyr Wind | Findlay, OH | 10.1 GWh | 21.4 mi |
Zephyr Wind Project - 2.0 | Findlay, OH | 10.4 GWh | 21.3 mi |