HO Clarke Generating
12584 Hiram Clarke Road, Houston, TX 77045Plant Summary Information
HO Clarke Generating is ranked #103 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
HO Clarke Generating is comprised of 8 generators and generated 49.4 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | HO Clarke Generating |
---|---|
Utility Name | ProEnergy Services |
Location | Harris County, TX |
Initial Operation Date | March 2021 |
Last Update | Feb 2025 |
Annual Generation | 469.9 GWh |
Annual Consumption | 5.0 M MMBtu |
Ranked #1,356 out of 11,993 Power Plants Nationwide | |
Ranked #571 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #257 out of 777 Texas Power Plants | |
Ranked #103 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of HO Clarke Generating
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for HO Clarke Generating.
Monthly Net Generation for HO Clarke Generating
HO Clarke Generating Details
Summary Information | |
---|---|
Plant Name | HO Clarke Generating (63335) |
Plant Address | 12584 Hiram Clarke Road, Houston, TX 77045 |
Utility | ProEnergy Services (63082) |
Latitude, Longitude | 29.64536, -95.45169 |
Generation Dates on File | Mar 2021 to Feb 2025 |
Initial Operation Date | March 2021 |
Annual Generation | 469.9 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG20-201-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | KINDER MORGAN TEXAS PIPELINE LLC |
Natural Gas Storage | No |
Generator CTG-7 Details Operating October 2021
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | HOCPRO01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG-8 Details Operating October 2021
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | HOCPRO01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG-1 Details Operating March 2021
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | HOCPRO01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG-2 Details Operating March 2021
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | HOCPRO01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG-3 Details Operating March 2021
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | HOCPRO01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG-4 Details Operating March 2021
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | HOCPRO01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG-5 Details Operating March 2021
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | HOCPRO01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG-6 Details Operating March 2021
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | HOCPRO01 |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
HO Clarke Generating Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-1 | 100.00% |
HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-2 | 100.00% |
HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-3 | 100.00% |
HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-4 | 100.00% |
HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-5 | 100.00% |
HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-6 | 100.00% |
HO Clarke II, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-7 | 100.00% |
HO Clarke II, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-8 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#561 | Geismar Cogen | Geismar, LA | 503.8 GWh |
#562 | Fort Churchill | Yerington, NV | 499.0 GWh |
#563 | Spindle Hill Energy Center | Fort Lupton, CO | 495.4 GWh |
#564 | F.D. Kuester Generating Station | Negaunee, MI | 490.5 GWh |
#565 | Ocotillo | Tempe, AZ | 490.1 GWh |
#566 | Oxnard | Oxnard, CA | 486.5 GWh |
#567 | Dave Gates Generating Station | Anaconda, MT | 478.8 GWh |
#568 | South Belridge Cogeneration Facility | McKittrick, CA | 477.1 GWh |
#569 | Knox Lee | Longview, TX | 476.6 GWh |
#570 | Harrington | Amarillo, TX | 2.1 TWh |
#572 | Whitehorn | Blaine, WA | 449.0 GWh |
#573 | Afton Generating Station | La Mesa, NM | 448.1 GWh |
#574 | Western 102 Power Plant | McCarran, NV | 447.2 GWh |
#575 | Valley (WI) | Milwaukee, WI | 444.8 GWh |
#576 | Wabash Valley Power IGCC | Terre Haute, IN | 441.5 GWh |
#577 | Millennium Power | Charlton, MA | 440.4 GWh |
#578 | Brotman Power Station | Rosharon, TX | 439.1 GWh |
#579 | SABIC Innovative Plastics Mt. Vernon | Mount Vernon, IN | 429.8 GWh |
#580 | Ector County Energy Center | Goldsmith, TX | 425.6 GWh |
#581 | Sewell Creek Energy | Cedartown, GA | 425.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding HO Clarke Generating.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Friendswood Energy | Houston, TX | 88.2 GWh | 0.1 mi |
FTBLID2 | Sugarland, TX | 1.8 GWh | 12.1 mi |
HEB00054 | Houston, TX | 220.0 MWh | 12.5 mi |
HEB00063 | Pearland, TX | 429.0 MWh | 7 mi |
HEB00109 | Katy, TX | 346.0 MWh | 11.1 mi |
HEB00110 | Missouri City, TX | 244.0 MWh | 9.1 mi |
Houston Plant | Houston, TX | 12.4 GWh | 12 mi |
Mckeever | Fresno, TX | 578.0 MWh | 9.6 mi |
OTHERNFBWA | Houston, TX | 178.0 MWh | 10.9 mi |
Rice University | Houston, TX | 18.6 GWh | 6.2 mi |
Southwick | Houston, TX | 367.0 MWh | 6.2 mi |
TECO CHP-1 | Houston, TX | 106.3 GWh | 5.1 mi |
Texas Petrochemicals | Houston, TX | 236.3 GWh | 12.4 mi |
The Methodist Hospital, Gas Turbine | Houston, TX | 13.8 GWh | 5.4 mi |
WAL2993 | Sugar Land, TX | 319.0 MWh | 11.8 mi |
WAL3302 | Houston, TX | 369.0 MWh | 7 mi |
WAL3572 | Pearland, TX | 146.0 MWh | 7.3 mi |
WAL3584 | Houston, TX | 297.0 MWh | 5.5 mi |
WAL5612 | Houston, TX | 264.0 MWh | 9.7 mi |
WAL872 | Pearland, TX | 296.0 MWh | 11.2 mi |