Hines Energy Complex
7700 County Road 555, Bartow, FL 33830Plant Summary Information
Hines Energy Complex is ranked #48 out of 11,852 power plants nationwide in terms of total annual net electricity generation.
Hines Energy Complex is comprised of 12 generators and generated 3.8 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Hines Energy Complex |
---|---|
Utility Name | Duke Energy Florida, LLC |
Location | Polk County, FL |
Initial Operation Date | April 1999 |
Last Update | Sep 2024 |
Annual Generation | 11.6 TWh |
Annual Consumption | 91.2 M MMBtu |
Ranked #48 out of 11,852 Power Plants Nationwide | |
Ranked #7 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #5 out of 279 Florida Power Plants | |
Ranked #3 out of 85 Florida Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
Duke Energy Florida, Inc (2013 to 2015) Duke Energy Florida, LLC (2016 to 2023) |
Map of Hines Energy Complex
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hines Energy Complex.
Monthly Net Generation for Hines Energy Complex
Hines Energy Complex Details
Summary Information | |
---|---|
Plant Name | Hines Energy Complex (7302) |
Plant Address | 7700 County Road 555, Bartow, FL 33830 |
Utility | Duke Energy Florida, LLC (6455) |
Latitude, Longitude | 27.78822, -81.86998 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | April 1999 |
Annual Generation | 11.6 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Progress Energy Florida (FPC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Cooling Ponds |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Florida, Inc (6455) FL |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
FLORIDA GAS TRANSMISSION COMPANY GULFSTREAM NATURAL GAS SYSTEM LLC |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator 1GT Details Operating April 1999
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | E100 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 173.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 167 MW |
Winter Capacity | 174 MW |
Minimum Load | 167 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1999 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 163 MW |
Net Winter Capacity With Natural Gas | 176 MW |
Net Summer Capacity With Oil | 163 MW |
Net Winter Capacity With Oil | 176 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 1GT2 Details Operating April 1999
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | E100 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 173.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 167 MW |
Winter Capacity | 177 MW |
Minimum Load | 167 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1999 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 169 MW |
Net Winter Capacity With Natural Gas | 178 MW |
Net Summer Capacity With Oil | 169 MW |
Net Winter Capacity With Oil | 178 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 1ST Details Operating April 1999
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | E100 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 199.7 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 167 MW |
Winter Capacity | 170 MW |
Minimum Load | 162 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1999 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 158 MW |
Net Winter Capacity With Natural Gas | 174 MW |
Net Summer Capacity With Oil | 158 MW |
Net Winter Capacity With Oil | 174 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 2GT Details Operating December 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | F110 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 178.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 176 MW |
Winter Capacity | 179 MW |
Minimum Load | 176 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 172 MW |
Net Winter Capacity With Natural Gas | 184 MW |
Net Summer Capacity With Oil | 172 MW |
Net Winter Capacity With Oil | 184 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 2GT2 Details Operating December 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | F110 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 178.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 174 MW |
Winter Capacity | 183 MW |
Minimum Load | 174 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 175 MW |
Net Winter Capacity With Natural Gas | 184 MW |
Net Summer Capacity With Oil | 175 MW |
Net Winter Capacity With Oil | 184 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 2ST Details Operating December 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | F110 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 191.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 182 MW |
Winter Capacity | 187 MW |
Minimum Load | 182 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 177 MW |
Net Winter Capacity With Natural Gas | 189 MW |
Net Summer Capacity With Oil | 177 MW |
Net Winter Capacity With Oil | 189 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 3GT Details Operating November 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G301 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 178.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 171 MW |
Winter Capacity | 175 MW |
Minimum Load | 171 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 173 MW |
Net Winter Capacity With Natural Gas | 183 MW |
Net Summer Capacity With Oil | 173 MW |
Net Winter Capacity With Oil | 183 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 3GT2 Details Operating November 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | G301 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 178.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 176 MW |
Winter Capacity | 177 MW |
Minimum Load | 176 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 173 MW |
Net Winter Capacity With Natural Gas | 183 MW |
Net Summer Capacity With Oil | 173 MW |
Net Winter Capacity With Oil | 183 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 3ST Details Operating November 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | G301 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 204 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 176 MW |
Winter Capacity | 183 MW |
Minimum Load | 176 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 175 MW |
Net Winter Capacity With Natural Gas | 187 MW |
Net Summer Capacity With Oil | 175 MW |
Net Winter Capacity With Oil | 187 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 4GT Details Operating December 2007
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | H400 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 199 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 171 MW |
Winter Capacity | 179 MW |
Minimum Load | 171 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2007 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 174 MW |
Net Winter Capacity With Natural Gas | 180 MW |
Net Summer Capacity With Oil | 174 MW |
Net Winter Capacity With Oil | 180 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 4GT2 Details Operating December 2007
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | H400 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 199 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 176 MW |
Winter Capacity | 179 MW |
Minimum Load | 176 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2007 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 173 MW |
Net Winter Capacity With Natural Gas | 181 MW |
Net Summer Capacity With Oil | 173 MW |
Net Winter Capacity With Oil | 181 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 4ST Details Operating December 2007
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | H400 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 212.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 178 MW |
Winter Capacity | 186 MW |
Minimum Load | 178 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2007 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 172 MW |
Net Winter Capacity With Natural Gas | 183 MW |
Net Summer Capacity With Oil | 172 MW |
Net Winter Capacity With Oil | 183 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Hines Energy Complex Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | West County Energy Center | Loxahatchee, FL | 21.0 TWh |
#2 | Jack McDonough | Smyrna, GA | 18.1 TWh |
#3 | Barry | Bucks, AL | 13.0 TWh |
#4 | Crystal River | Crystal River, FL | 16.3 TWh |
#5 | H Allen Franklin Combined Cycle | Smiths, AL | 12.1 TWh |
#6 | Greensville County Power Station | Emporia, VA | 12.0 TWh |
#8 | Guernsey Power Station | Byesville, OH | 11.6 TWh |
#9 | Okeechobee Clean Energy Center | Okeechobee, FL | 11.3 TWh |
#10 | Union Power Station | El Dorado, AR | 11.1 TWh |
#11 | Midland Cogeneration Venture | Midland, MI | 10.8 TWh |
#12 | Lackawanna Energy Center | Jessup, PA | 10.3 TWh |
#13 | Forney Energy Center | Forney, TX | 9.9 TWh |
#14 | Hanging Rock Energy Facility | Ironton, OH | 9.6 TWh |
#15 | Warren County | Front Royal, VA | 9.3 TWh |
#16 | York Energy Center | Delta, PA | 9.0 TWh |
#17 | Fort Myers | Ft. Myers, FL | 9.0 TWh |
#18 | Sherwood H Smith Jr Energy Complex | Hamlet, NC | 8.8 TWh |
#19 | Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.7 TWh |
#20 | Nine Mile Point | Westwego, LA | 8.7 TWh |
#21 | Sanford | DeBary, FL | 8.6 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hines Energy Complex.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alafia Solar | Mulberry, FL | 105.4 GWh | 10.5 mi |
Bartow Solar Energy LLC | Bartow, FL | 12.7 GWh | 10 mi |
Bonnie Mine Solar | Bartow, FL | 56.6 GWh | 10 mi |
Durrance | Mulberry, FL | 108.3 GWh | 6.7 mi |
Fort Green Solar Power Plant | Bowling Green, FL | 158.8 GWh | 11.1 mi |
Hardee Power Station | Bowling Green, FL | 929.5 GWh | 12 mi |
Jamison Solar (FL) | Mulberry, FL | 140.9 GWh | 5.4 mi |
Lake Hancock Solar | Bartow, FL | 90.8 GWh | 11.1 mi |
Laurel Oaks Solar | Plant City, FL | 118.4 GWh | 15.4 mi |
Magnolia Solar | Mulberry, FL | 137.0 GWh | 14.1 mi |
Midulla Generating Station | Bowling Green, FL | 2.1 TWh | 11.6 mi |
Mosaic Co Bartow Facility | Bartow, FL | 126.4 GWh | 8.8 mi |
Mosaic New Wales Operations | Mulberry, FL | 420.4 GWh | 11.6 mi |
Mosaic South Pierce Operations | Mulberry, FL | 140.2 GWh | 4.5 mi |
Mulberry Cogeneration Facility | Bartow, FL | 399.7 GWh | 4.2 mi |
Orange Cogeneration Facility | Bartow, FL | 391.0 GWh | 6.3 mi |
Payne Creek Solar | Bowling Green, FL | 121.5 GWh | 10.3 mi |
Peace Creek Solar | Bartow, FL | 92.1 GWh | 9.4 mi |
Polk | Mulberry, FL | 5.8 TWh | 8.4 mi |
Tiger Bay | Ft. Meade, FL | 1.1 TWh | 3.2 mi |