Hinds Energy Facility
3889 Beasley Road, Jackson, MS 39213Plant Summary Information
Hinds Energy Facility is ranked #9 out of 42 power plants in Mississippi in terms of total annual net electricity generation.
Hinds Energy Facility is comprised of 4 generators and generated 1.0 TWh during the 3-month period between December 2023 to March 2024.
Plant Name | Hinds Energy Facility |
---|---|
Utility Name | Entergy Mississippi LLC |
Location | Hinds County, MS |
Initial Operation Date | May 2001 |
Last Update | Mar 2024 |
Annual Generation | 3.5 TWh |
Annual Consumption | 25.1 M MMBtu |
Ranked #359 out of 11,249 Power Plants Nationwide | |
Ranked #207 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #9 out of 42 Mississippi Power Plants | |
Ranked #8 out of 29 Mississippi Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
Entergy Mississippi Inc (2013 to 2017) Entergy Mississippi LLC (2018 to 2022) |
Map of Hinds Energy Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hinds Energy Facility.
Monthly Net Generation for Hinds Energy Facility
Hinds Energy Facility Details
Summary Information | |
---|---|
Plant Name | Hinds Energy Facility (55218) |
Plant Address | 3889 Beasley Road Jackson, MS 39213 |
Utility | Entergy Mississippi LLC (12685) |
Latitude, Longitude | 32.37897, -90.21991 |
Generation Dates on File | Jun 2001 to Mar 2024 |
Initial Operation Date | May 2001 |
Annual Generation | 3.5 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 01-65-000 |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Entergy Mississippi Inc (12685) MS |
Grid Voltage | 236.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | TEXAS EASTERN TRANSMISSION LP |
Natural Gas Storage | No |
Generator H01 Details Operating May 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PB01 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | EES.CC.HINDS1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | EES.CC.HINDS1 |
Nameplate Capacity | 176.6 MW |
Nameplate Power Factor | 0.85 |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator H02 Details Operating May 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PB01 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | EES.CC.HINDS1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | EES.CC.HINDS1 |
Nameplate Capacity | 176.6 MW |
Nameplate Power Factor | 0.85 |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator H03 Details Operating May 2001
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | PB01 |
Ownership | Single Owner |
Duct Burners | No |
RTO ISO LMP Node Designation | EES.CC.HINDS1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | EES.CC.HINDS1 |
Nameplate Capacity | 198.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 454.6 MW |
Winter Capacity | 515 MW |
Minimum Load | 120 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2001 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Waste Heat |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator H04BS Details Operating January 2020
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 49.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 27.4 MW |
Winter Capacity | 33.4 MW |
Minimum Load | 17 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Hinds Energy Facility Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#197 | Birdsboro Power | Birdsboro, PA | 3.6 TWh |
#198 | Sabine | Orange, TX | 3.6 TWh |
#199 | Harrison County Power Project | Marshall, TX | 3.6 TWh |
#200 | Desert Basin | Casa Grande, AZ | 3.6 TWh |
#201 | Mesquite Generating Station Block 1 | Arlington, AZ | 3.6 TWh |
#202 | Panda Sherman Power Station | Sherman, TX | 3.6 TWh |
#203 | Curtis H Stanton Energy Center | Orlando, FL | 3.6 TWh |
#204 | Empire Generating Co LLC | Rensselaer, NY | 3.6 TWh |
#205 | Magic Valley Generating Station | Edinburg, TX | 3.5 TWh |
#206 | Harding Street | Indianapolis, IN | 3.5 TWh |
#208 | Tenaska Gateway Generating Station | Mt. Enterprise, TX | 3.5 TWh |
#209 | Lost Pines 1 Power Project | Bastrop, TX | 3.5 TWh |
#210 | Gateway Generating Station | Antioch, CA | 3.4 TWh |
#211 | Wolf Hollow I LP | Granbury, TX | 3.4 TWh |
#212 | Carville Energy LLC | St Gabriel, LA | 3.4 TWh |
#213 | Attala | Sallis, MS | 3.4 TWh |
#214 | Red Oak Power LLC | Sayreville, NJ | 3.4 TWh |
#215 | Marshall (NC) | Terrell, NC | 7.5 TWh |
#216 | Port Westward | Clatskanie, OR | 3.4 TWh |
#217 | Los Medanos Energy Center | Pittsburg, CA | 3.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hinds Energy Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Attala | Sallis, MS | 3.4 TWh | 54.1 mi |
CF Industries Yazoo City Complex | Yazoo City, MS | 175.3 GWh | 37.4 mi |
Choctaw County | French Camp, MS | 5.9 TWh | 78.1 mi |
Delta's Edge Solar | Greenwood, MS | 68.4 GWh | 77.8 mi |
ERDC | Vicksburg, MS | 2.0 MWh | 37.7 mi |
Ergon Refining Vicksburg | Vicksburg, MS | 41.8 GWh | 40.2 mi |
Georgia-Pacific Monticello Paper | Monticello, MS | 473.3 GWh | 52.5 mi |
Georgia-Pacific Taylorsville Plywood | Taylorsville, MS | 57.1 GWh | 58 mi |
Gerald Andrus | Greenville, MS | 755.9 GWh | 84.9 mi |
Grand Gulf | Port Gibson, MS | 11.7 TWh | 54.8 mi |
International Paper Vicksburg Mill | Vicksburg, MS | 226.8 GWh | 33.9 mi |
Lineage MS | Richland, MS | 1.5 GWh | 9.4 mi |
Moselle | Moselle, MS | 2.3 TWh | 79.8 mi |
Quantum Choctaw Power LLC | Ackerman, MS | 2.1 TWh | 90.7 mi |
Ratcliffe | De Kalb, MS | 4.0 TWh | 87 mi |
Red Hills Generating Facility | Ackerman, MS | 2.6 TWh | 90.1 mi |
Silver Creek | Prentiss, MS | 92.1 GWh | 56.1 mi |
Sumrall I Solar Farm | Sumrall, MS | 116.4 GWh | 79.6 mi |
Sumrall II Solar Farm | Sumrall, MS | 102.7 GWh | 80.4 mi |
Sylvarena | Raleigh, MS | 256.3 GWh | 54.6 mi |