Hilton Head
41 Power Alley, Hilton Head Island, SC 29926Plant Summary Information
Hilton Head is ranked #8 out of 27 distillate fuel oil power plants in South Carolina in terms of total annual net electricity generation.
Hilton Head is comprised of 3 generators and generated -17.5 MWh during the 3-month period between August 2023 to November 2023.
Plant Name | Hilton Head |
---|---|
Utility Name | South Carolina Public Service Authority |
Location | Beaufort County, SC |
Initial Operation Date | August 1973 |
Last Update | Nov 2023 |
Annual Generation | 2.1 GWh |
Annual Consumption | 53.6 k MMBtu |
Ranked #9,736 out of 11,852 Power Plants Nationwide | |
Ranked #290 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #171 out of 190 South Carolina Power Plants | |
Ranked #8 out of 27 South Carolina Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Hilton Head
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hilton Head.
Monthly Net Generation for Hilton Head
Hilton Head Details
Summary Information | |
---|---|
Plant Name | Hilton Head (3318) |
Plant Address | 41 Power Alley, Hilton Head Island, SC 29926 |
Utility | South Carolina Public Service Authority (17543) |
Latitude, Longitude | 32.20887, -80.69875 |
Generation Dates on File | Jan 2001 to Nov 2023 |
Initial Operation Date | August 1973 |
Annual Generation | 2.1 GWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | South Carolina Public Service Authority (SC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | South Carolina Public Service Authority (17543) SC |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator 1 Details Operating August 1973
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 26.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 16 MW |
Winter Capacity | 20 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1973 |
---|---|
Planned Retirement | December 2033 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating August 1974
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 26.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 16 MW |
Winter Capacity | 20 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1974 |
---|---|
Planned Retirement | December 2033 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating April 1979
Technology | Petroleum Liquids |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 64.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 52 MW |
Winter Capacity | 60 MW |
Minimum Load | 7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1979 |
---|---|
Planned Retirement | December 2033 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Hilton Head Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#280 | Possum Point | Dumfries, VA | 2.3 TWh |
#281 | Elizabeth River Power Station | Chesapeake, VA | 109.2 GWh |
#282 | Ray D Nixon | Fountain, CO | 930.7 GWh |
#283 | New Hampton | New Hampton, IA | 2.4 GWh |
#284 | Cleary Flood Hybrid | Taunton, MA | 49.6 GWh |
#285 | Brandywine Power Facility | Brandywine, MD | 545.5 GWh |
#286 | Covanta Southeastern Connecticut Company | Preston, CT | 116.0 GWh |
#287 | Noorvik | Noorvik, AK | 2.2 GWh |
#288 | Butler-Warner Generation Plant | Fayetteville, NC | 38.2 GWh |
#289 | Crisfield | Crisfield, MD | 2.2 GWh |
#291 | McCook | McCook, NE | 2.1 GWh |
#292 | DeCordova Steam Electric Station | Granbury, TX | 95.5 GWh |
#293 | Moreau | Moreau, MO | 2.1 GWh |
#294 | Skagway | Skagway, AK | 4.0 GWh |
#295 | Turkey Point | Homestead, FL | 21.4 TWh |
#296 | Wyodak | Gillette, WY | 1.9 TWh |
#297 | Kennedy International Airport Cogen | Jamaica, NY | 521.7 GWh |
#298 | Kotlik | Kotlik, AK | 2.0 GWh |
#299 | Webster City | Webster City, IA | 2.0 GWh |
#300 | NSB Atqasuk Utility | Atqasuk, AK | 2.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hilton Head.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Effingham Energy Facility | Rincon, GA | 1.5 TWh | 34.5 mi |
Estill Solar II | Estill, SC | 18.1 GWh | 48.3 mi |
Guyton Community Solar | Guyton, GA | 7.2 GWh | 45.7 mi |
IKEA Savannah 490 | Port Wentworth, GA | 1.8 GWh | 27.9 mi |
Imperial Savannah LP | Port Wentworth, GA | 47.5 GWh | 26.6 mi |
International Paper Savanna Mill | Savannah, GA | 695.5 GWh | 26 mi |
Jasper | Hardeeville, SC | 4.9 TWh | 26.9 mi |
McIntosh | Rincon, GA | 30.7 GWh | 29.3 mi |
McIntosh Combined Cycle Facility | Rincon, GA | 7.8 TWh | 29.8 mi |
MCRD Parris Island PV Hybrid | Parris Island, SC | 31.5 GWh | 8.3 mi |
Moffett Solar Project | Ridgeland, SC | 109.8 GWh | 33.3 mi |
Port Wentworth Mill | Port Wentworth, GA | 433.2 GWh | 27.1 mi |
Ridgeland Solar Project | Ridgeland, SC | 17.1 GWh | 23.4 mi |
Rincon Solar I | Rincon, GA | 29.2 GWh | 34.7 mi |
Savannah River Mill | Rincon, GA | 86.3 GWh | 30.6 mi |
SCE&G Nimitz CSG | Ridgeland, SC | 14.7 GWh | 25 mi |
Seabrook Solar | Seabrook, SC | 81.8 GWh | 24.7 mi |
Superior Landfill Gas Recovery | Savannah, GA | 46.9 GWh | 35.8 mi |
Trask East Solar | Beaufort, SC | 23.3 GWh | 18.3 mi |
Yemassee Solar | Yemassee, SC | 21.4 GWh | 36.3 mi |