Hildreth Solar Power Plant
3701 266th St, O'Brien, FL 32701Plant Summary Information
Hildreth Solar Power Plant is ranked #8 out of 185 solar farms in Florida in terms of total annual net electricity generation.
Hildreth Solar Power Plant generated 35.0 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Hildreth Solar Power Plant |
---|---|
Utility Name | Duke Energy Florida, LLC |
Location | Suwannee County, FL |
Initial Operation Date | March 2023 |
Last Update | Dec 2024 |
Annual Generation | 168.5 GWh |
Annual Consumption | 600.1 k MMBtu |
Ranked #2,560 out of 11,949 Power Plants Nationwide | |
Ranked #351 out of 5,739 Solar Power Plants Nationwide | |
Ranked #78 out of 293 Florida Power Plants | |
Ranked #8 out of 185 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Hildreth Solar Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hildreth Solar Power Plant.
Monthly Net Generation for Hildreth Solar Power Plant
Hildreth Solar Power Plant Details
Summary Information | |
---|---|
Plant Name | Hildreth Solar Power Plant (65170) |
Plant Address | 3701 266th St, O'Brien, FL 32701 |
Utility | Duke Energy Florida, LLC (6455) |
Latitude, Longitude | 29.96484, -82.8232 |
Generation Dates on File | Mar 2023 to Dec 2024 |
Initial Operation Date | March 2023 |
Annual Generation | 168.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Florida Inc (FPC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Florida, LLC (6455) FL |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator PV1 Details Operating March 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 74.9 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 74.9 MW |
Winter Capacity | 74.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 106.4 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Hildreth Solar Power Plant Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#341 | Pearl River Solar Park LLC | Morton, MS | 173.7 GWh |
#342 | FPL Shirer Branch Solar Energy Center | Clarksville, FL | 173.4 GWh |
#343 | Water Strider Solar | Nathalie, VA | 173.0 GWh |
#344 | Fern Solar LLC | Battleboro, NC | 173.0 GWh |
#345 | Decatur Parkway Solar Project, LLC | Bainbridge, GA | 171.6 GWh |
#346 | White Tail | TBD, FL | 170.9 GWh |
#347 | Beautyberry | Clewiston, FL | 170.4 GWh |
#348 | Wild Azalea Solar Energy Center | Chattahoochee, FL | 170.1 GWh |
#349 | RE Barren Ridge 1 | Mojave, CA | 169.5 GWh |
#350 | Greasewood Solar | Fort Stockton, TX | 168.8 GWh |
#352 | Harmony Solar | St. Cloud, FL | 168.4 GWh |
#353 | SR Terrell | Dawson, GA | 168.1 GWh |
#354 | Orchard | Ft. Pierce, FL | 167.9 GWh |
#355 | Turnpike | Vero Beach, FL | 166.9 GWh |
#356 | G.S.E. One LLC | Bonham, TX | 166.5 GWh |
#357 | Elder Branch | Parrish, FL | 166.2 GWh |
#358 | Gunsight Solar, LLC | Swansea, SC | 166.1 GWh |
#359 | LaFayette Solar Farm | LaFayette, AL | 165.4 GWh |
#360 | Shaw Creek Solar, LLC | Aiken, SC | 165.4 GWh |
#361 | Taylor Creek Solar | Orlando, FL | 165.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hildreth Solar Power Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bell Ridge Solar | Trenton, FL | 189.5 GWh | 18.3 mi |
Butler Plaza | Gainesville, FL | 2.0 GWh | 35.6 mi |
Columbia County Solar | Fort White, FL | 23.3 GWh | 7.8 mi |
Columbia Solar Power Plant | Fort White, FL | 149.3 GWh | 9.5 mi |
County Line Renewable Energy Center | High Springs, FL | 55.2 GWh | 13.7 mi |
Deerhaven Generating Station | Gainesville, FL | 721.4 GWh | 29.7 mi |
Deerhaven Renewable | Gainesville, FL | 274.3 GWh | 29 mi |
Echo River Solar | Live Oak, FL | 147.6 GWh | 23 mi |
Gilchrist County Solar | Newberry, FL | 22.5 GWh | 25.6 mi |
Hardeetown Solar Power Plant | Chiefland, FL | 147.5 GWh | 33.1 mi |
High Springs Solar Power Plant | High Springs, FL | 148.1 GWh | 15.3 mi |
Solar Park Gainesville, LLC | Gainesville, FL | 1.5 GWh | 34.4 mi |
Sunshine Gateway Solar Energy Center | Lake City, FL | 130.3 GWh | 22.9 mi |
Suwannee River | Live Oak, FL | 42.3 GWh | 35.6 mi |
Suwannee Solar Facility | Live Oak, FL | 16.7 GWh | 35.3 mi |
Swift Creek Chemical Complex | White Springs, FL | 64.7 GWh | 33.8 mi |
Trenton Solar Power Plant | Trenton, FL | 145.1 GWh | 22.8 mi |
Twin Rivers Solar Power Plant | Jasper, FL | 156.6 GWh | 35.7 mi |
Union Springs Solar Center | Lake Butler, FL | 146.0 GWh | 31.3 mi |
Winquepin Renewable Energy Center | Lee, FL | 96.1 GWh | 35.9 mi |