Highlander Solar Energy Station 1
TBD, Spotsylvania, VA 22551Plant Summary Information
Highlander Solar Energy Station 1 is ranked #29 out of 217 power plants in Virginia in terms of total annual net electricity generation.
Highlander Solar Energy Station 1 generated 45.5 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | Highlander Solar Energy Station 1 |
---|---|
Utility Name | AES Distributed Energy |
Location | Spotsylvania County, VA |
Initial Operation Date | December 2020 |
Last Update | Feb 2025 |
Annual Generation | 295.6 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,906 out of 11,993 Power Plants Nationwide | |
Ranked #189 out of 5,778 Solar Power Plants Nationwide | |
Ranked #29 out of 217 Virginia Power Plants | |
Ranked #4 out of 101 Virginia Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Highlander Solar Station 1 LLC (2018 to 2019) AES Distributed Energy (2020 to 2023) |
Map of Highlander Solar Energy Station 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Highlander Solar Energy Station 1.
Monthly Net Generation for Highlander Solar Energy Station 1
Highlander Solar Energy Station 1 Details
Summary Information | |
---|---|
Plant Name | Highlander Solar Energy Station 1 (62014) |
Plant Address | TBD, Spotsylvania, VA 22551 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 38.24712, -77.78622 |
Generation Dates on File | Dec 2020 to Feb 2025 |
Initial Operation Date | December 2020 |
Annual Generation | 295.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Generator HLND1 Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 165 MW |
Summer Capacity | 165 MW |
Winter Capacity | 165 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 200.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Highlander Solar Energy Station 1 Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#179 | Rancho Seco Solar II, LLC | Twin Cities, CA | 306.4 GWh |
#180 | Crooked Lake Solar, LLC | Blytheville, AR | 306.1 GWh |
#181 | Cavalry Solar Hybrid | Monon, IN | 302.9 GWh |
#182 | SR DeSoto I, LLC | DeSoto, GA | 303.8 GWh |
#183 | Maverick Solar 7, LLC | Desert Center, CA | 300.3 GWh |
#184 | Concho Valley Solar, LLC | San Angelo, TX | 298.4 GWh |
#185 | Red Tailed Hawk Solar LLC | Pierce, TX | 297.8 GWh |
#186 | Orion III Solar Project | Buckholts, TX | 297.6 GWh |
#187 | Harry Allen Solar Energy LLC | Apex, NV | 296.8 GWh |
#188 | Battle Mountain Solar Project | Battle Mountain, NV | 293.8 GWh |
#190 | River Ferry Solar 1 | West Union, IL | 295.3 GWh |
#191 | Old 300 Solar Center, LLC | Needville, TX | 294.9 GWh |
#192 | Yellow Pine II | Enterprise, NV | 282.5 GWh |
#193 | Hudson - High Desert Hybrid | Victorville, CA | 285.7 GWh |
#194 | Valentine Solar, LLC | Rosamond, CA | 292.2 GWh |
#195 | Panoche Valley Solar Farm | Paicines, CA | 292.1 GWh |
#196 | Wistaria Ranch Solar | Calexico, CA | 291.8 GWh |
#197 | Springbok Solar Farm 1 | Cantil, CA | 291.6 GWh |
#198 | Corazon Energy LLC | Rachito Las Lomas, TX | 291.2 GWh |
#199 | Hardin Solar Energy LLC | Alger, OH | 285.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Highlander Solar Energy Station 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Stafford | Stafford, VA | 1.2 GWh | 22.3 mi |
Apple Grove Solar, LLC | Mineral, VA | 166.0 MWh | 23 mi |
Desper Solar | Louisa, VA | 122.9 GWh | 21.2 mi |
Electric Avenue Facility | Culpeper, VA | 480.0 MWh | 10.9 mi |
Energix Aditya, LLC | Mineral, VA | 6.3 GWh | 18.3 mi |
Gordonsville Energy LP | Gordonsville, VA | 1.1 TWh | 24.2 mi |
Ladysmith | Woodford, VA | 895.0 GWh | 19.1 mi |
Louisa Generation Facility | Gordonsville, VA | 236.9 GWh | 24.9 mi |
Madison Solar | Locust Grove, VA | 33.8 GWh | 4.1 mi |
Marsh Run Generation Facility | Remington, VA | 215.4 GWh | 19.5 mi |
Martin Solar Center | Kents Store, VA | 9.3 GWh | 29.1 mi |
North Anna | Mineral, VA | 16.0 TWh | 12.9 mi |
Palmer Solar Center | Troy, VA | 9.7 GWh | 31 mi |
Pleinmont Solar 1 | Spotsylvania, VA | 139.4 GWh | 0 mi |
Pleinmont Solar 2 | Spotsylvania, VA | 441.0 GWh | 0 mi |
Remington | Remington, VA | 365.5 GWh | 20.5 mi |
Remington Solar Facility | Remington, VA | 31.9 GWh | 20.8 mi |
Richmond Spider Solar | Spotsylvania, VA | 38.2 GWh | 0 mi |
Waste Management King George LFGTE | King George, VA | 78.5 GWh | 26 mi |
Whitehouse Solar Farm | Louisa, VA | 49.0 GWh | 18.5 mi |