High Springs Solar Power Plant
N.W. 174th Ave, High Springs, FL 32643Plant Summary Information
High Springs Solar Power Plant is ranked #42 out of 199 solar farms in Florida in terms of total annual net electricity generation.
High Springs Solar Power Plant generated 29.5 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | High Springs Solar Power Plant |
---|---|
Utility Name | Duke Energy Florida, LLC |
Location | Alachua County, FL |
Initial Operation Date | April 2023 |
Last Update | Feb 2025 |
Annual Generation | 150.9 GWh |
Annual Consumption | 550.0 k MMBtu |
Ranked #2,729 out of 11,993 Power Plants Nationwide | |
Ranked #430 out of 5,778 Solar Power Plants Nationwide | |
Ranked #112 out of 307 Florida Power Plants | |
Ranked #42 out of 199 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of High Springs Solar Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for High Springs Solar Power Plant.
Monthly Net Generation for High Springs Solar Power Plant
High Springs Solar Power Plant Details
Summary Information | |
---|---|
Plant Name | High Springs Solar Power Plant (65172) |
Plant Address | N.W. 174th Ave, High Springs, FL 32643 |
Utility | Duke Energy Florida, LLC (6455) |
Latitude, Longitude | 29.81002, -82.63984 |
Generation Dates on File | Apr 2023 to Feb 2025 |
Initial Operation Date | April 2023 |
Annual Generation | 150.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Florida Inc (FPC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Duke Energy Florida, LLC (6455) FL |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator PV1 Details Operating April 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 74.9 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 74.9 MW |
Winter Capacity | 74.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2023 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 100.5 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
High Springs Solar Power Plant Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#420 | Ibis | Palm Bay, FL | 152.6 GWh |
#421 | SR Perry | Perry, GA | 152.3 GWh |
#422 | Dileo Solar | Clifton, TX | 152.2 GWh |
#423 | Charlie Creek Solar Power Plant | Wauchula, FL | 152.0 GWh |
#424 | Pelican Solar Center | Ft. Pierce, FL | 151.7 GWh |
#425 | Immokalee | Immokalee, FL | 151.4 GWh |
#426 | Hobnail Solar | Hephzibah, GA | 151.1 GWh |
#427 | Grizzly Ridge Solar | Hamilton County, TX | 151.0 GWh |
#428 | Allora Solar, LLC | Gilbert, SC | 151.0 GWh |
#429 | Columbia Solar Power Plant | Fort White, FL | 150.9 GWh |
#431 | Trenton Solar Power Plant | Trenton, FL | 150.8 GWh |
#432 | Mesquite Solar 4, LLC | Tonopah, AZ | 150.1 GWh |
#433 | Pink Trial Solar Energy Center | Port St. Lucie, FL | 150.6 GWh |
#434 | Solar Star California, XLI, LLC | Rosamond, CA | 150.6 GWh |
#435 | Midlands | St. Matthews, SC | 150.2 GWh |
#436 | River Bend Solar, LLC | Florence, AL | 149.9 GWh |
#437 | FPL Etonia Creek | Palatka, FL | 149.6 GWh |
#438 | Okeechobee Solar | Vero Beach, FL | 149.4 GWh |
#439 | Bluefield Preserve Solar | Okeechobee, FL | 149.3 GWh |
#440 | SR DeSoto II | DeSoto, GA | 148.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding High Springs Solar Power Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bell Ridge Solar | Trenton, FL | 190.5 GWh | 7.6 mi |
Butler Plaza | Gainesville, FL | 2.0 GWh | 20.2 mi |
Columbia County Solar | Fort White, FL | 48.9 GWh | 7.6 mi |
Columbia Solar Power Plant | Fort White, FL | 150.9 GWh | 6 mi |
County Line Renewable Energy Center | High Springs, FL | 79.7 GWh | 2.2 mi |
Deerhaven Generating Station | Gainesville, FL | 709.1 GWh | 15.5 mi |
Deerhaven Renewable | Gainesville, FL | 227.1 GWh | 14.9 mi |
Echo River Solar | Live Oak, FL | 146.5 GWh | 36.2 mi |
Gilchrist County Solar | Newberry, FL | 48.7 GWh | 13.4 mi |
Hardeetown Solar Power Plant | Chiefland, FL | 147.2 GWh | 25.5 mi |
Hildreth Solar Power Plant | O'Brien, FL | 173.9 GWh | 15.3 mi |
Horizon Solar Energy Center | Hawthorne, FL | 112.0 GWh | 36.3 mi |
John R Kelly | Gainesville, FL | 603.3 GWh | 22.2 mi |
Santa Fe Solar Power Plant | Archer, FL | 148.4 GWh | 23.5 mi |
Solar Park Gainesville, LLC | Gainesville, FL | 1.5 GWh | 19.6 mi |
South Energy Center | Gainesville, FL | 44.0 GWh | 21.6 mi |
Sunshine Gateway Solar Energy Center | Lake City, FL | 130.5 GWh | 33.8 mi |
Trenton Solar Power Plant | Trenton, FL | 150.8 GWh | 17.2 mi |
Union Springs Solar Center | Lake Butler, FL | 145.5 GWh | 23.2 mi |
University of Florida | Gainesville, FL | 377.2 GWh | 21 mi |