High Shoals PV1
High Shoals Rd, High Shoals, NC 28092Plant Summary Information
High Shoals PV1 is ranked #69 out of 748 solar farms in North Carolina in terms of total annual net electricity generation.
High Shoals PV1 generated 6.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | High Shoals PV1 |
---|---|
Utility Name | Pine Gate Renewables |
Location | Gaston County, NC |
Initial Operation Date | April 2022 |
Last Update | Dec 2023 |
Annual Generation | 31.2 GWh |
Annual Consumption | 110.7 k MMBtu |
Ranked #4,500 out of 11,852 Power Plants Nationwide | |
Ranked #987 out of 5,655 Solar Power Plants Nationwide | |
Ranked #127 out of 863 North Carolina Power Plants | |
Ranked #69 out of 748 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Ecoplexus, Inc (2014 to 2021) Pine Gate Renewables (2022 to 2023) |
Map of High Shoals PV1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for High Shoals PV1.
Monthly Net Generation for High Shoals PV1
High Shoals PV1 Details
Summary Information | |
---|---|
Plant Name | High Shoals PV1 (59997) |
Plant Address | High Shoals Rd, High Shoals, NC 28092 |
Utility | Pine Gate Renewables (61298) |
Latitude, Longitude | 35.39648, -81.21914 |
Generation Dates on File | Apr 2022 to Dec 2023 |
Initial Operation Date | April 2022 |
Annual Generation | 31.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
Grid Voltage | 44.00 kV |
Energy Storage | No |
Generator HISHO Details Operating April 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 16 MW |
Summer Capacity | 16 MW |
Winter Capacity | 16 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Fixed Tilt | No |
Azimuth Angle | 180 |
DC Net Capacity | 22.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
High Shoals PV1 Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Fresh Air Energy XXXII, LLC | 101 2nd St., Ste. 1250, San Francisco, CA 94105 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#977 | Watson Seed Farm PV1 | Whitakers, NC | 32.2 GWh |
#978 | Cement City Solar, LLC | Cement City, MI | 32.1 GWh |
#979 | Buckingham Solar LLC | Cumberland, VA | 31.9 GWh |
#980 | Remington Solar Facility | Remington, VA | 31.9 GWh |
#981 | Mohave Energy - Hybrid | Fort Mohave, AZ | 31.8 GWh |
#982 | RE Bagdad Solar I LLC | Bagdad, AZ | 31.7 GWh |
#983 | Alta Luna | Deming, NM | 31.7 GWh |
#984 | Davis Monthan AFB (AZ) West Airfield | Tucson, AZ | 31.5 GWh |
#985 | NY8 - Puckett Solar | Chenango Forks, NY | 31.3 GWh |
#986 | Huron Solar Station | Huron, CA | 31.3 GWh |
#988 | Stratford Solar Center, LLC | Suffolk, VA | 31.0 GWh |
#989 | UN-School House LLC | Morris Township, PA | 31.0 GWh |
#990 | Woodmere Solar Farm | Edison, CA | 31.0 GWh |
#991 | North Stonington Solar Center, LLC | North Stonington, CT | 30.9 GWh |
#992 | Williamston Speight Solar, LLC | Williamston, NC | 30.9 GWh |
#993 | Saddle Mountain Solar I | Tonopah, AZ | 30.9 GWh |
#994 | Hecate Energy Cherrydale LLC | Cape Charles, VA | 30.6 GWh |
#995 | Caden Energix Pamplin LLC | Appomattox, VA | 30.6 GWh |
#996 | Maryland Solar | Hagerstown, MD | 30.6 GWh |
#997 | Riverhead Solar Farm | Calverton, NY | 30.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding High Shoals PV1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apple Data Center PV | Maiden, NC | 35.6 GWh | 13.4 mi |
Auten Road Farm, LLC | Gastonia, NC | 9.6 GWh | 7.8 mi |
Battleground | Kings Mountain, NC | 5.4 GWh | 13.7 mi |
Cherryville City Hall | Cherryville, NC | 11.0 MWh | 9.2 mi |
DE Solar 1725 Drywall Dr | Mt. Holly, NC | 796.0 MWh | 13.4 mi |
Freemont Solar Center LLC | Stanley, NC | 6.2 GWh | 12.7 mi |
Gaston County Renewable Energy Center | Dallas, NC | 21.0 GWh | 2.8 mi |
Gaston Memorial Hospital | Gastonia, NC | 33.0 MWh | 9.6 mi |
Gaston Solar Power Plant | Cherryville Township, NC | 46.9 GWh | 7 mi |
Gastonia Solar Center | Gastonia, NC | 8.1 GWh | 11.7 mi |
Gastonia, Tulip Drive | Gastonia, NC | 26.0 MWh | 7.5 mi |
Haynes Farm | Lincolnton, NC | 7.8 GWh | 9 mi |
High Shoals Hydro (NC) | High Shoals, NC | 3.3 GWh | 1 mi |
Lincoln Combustion | Stanley, NC | 3.7 GWh | 10.7 mi |
Lincolnton High School | Lincolnton, NC | 21.0 MWh | 6.1 mi |
Long Creek Waste Water Plant | Dallas, NC | 433.0 MWh | 7.3 mi |
Maiden Community Center | Maiden, NC | 30.0 MWh | 12.5 mi |
Mariposa Solar Center LLC | Stanley, NC | 9.1 GWh | 7.6 mi |
Waco Farm | Waco, NC | 8.8 GWh | 12.1 mi |
York Road Solar I, LLC | Kings Mountain, NC | 3.1 GWh | 13.7 mi |