High Plains
700 Highway 13, Rock River, WY 82083Plant Summary Information
High Plains is ranked #21 out of 69 power plants in Wyoming in terms of total annual net electricity generation.
High Plains generated 92.3 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | High Plains |
---|---|
Utility Name | PacifiCorp |
Location | Albany County, WY |
Initial Operation Date | September 2009 |
Last Update | Dec 2023 |
Annual Generation | 342.1 GWh |
Annual Consumption | 1.3 M MMBtu |
Ranked #1,678 out of 11,835 Power Plants Nationwide | |
Ranked #499 out of 1,343 Wind Power Plants Nationwide | |
Ranked #21 out of 69 Wyoming Power Plants | |
Ranked #9 out of 27 Wyoming Wind Power Plants | |
Fuel Types | Wind |
Map of High Plains
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for High Plains.
Monthly Net Generation for High Plains
High Plains Details
Summary Information | |
---|---|
Plant Name | High Plains (57040) |
Plant Address | 700 Highway 13, Rock River, WY 82083 |
Utility | PacifiCorp (14354) |
Latitude, Longitude | 41.67505, -106.01112 |
Generation Dates on File | Sep 2009 to Dec 2023 |
Initial Operation Date | September 2009 |
Annual Generation | 342.1 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PacifiCorp (14354) WY |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating September 2009
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 122.1 MW |
Summer Capacity | 99 MW |
Winter Capacity | 99 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 66 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 66 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.85-87 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262 |
High Plains Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#489 | Buffalo Ridge II LLC | Elkton, SD | 346.5 GWh |
#490 | Cameron Wind 1 LLC | Rio Hondo, TX | 346.0 GWh |
#491 | Milford Wind Corridor I LLC | Milford, UT | 346.0 GWh |
#492 | Turkey Track Wind Energy LLC | Blackwell, TX | 345.7 GWh |
#493 | Majestic 1 Wind Farm | Panhandle, TX | 345.1 GWh |
#494 | Pine River Wind Park | Shepherd, MI | 344.3 GWh |
#495 | Minco Wind I, LLC | Minco, OK | 343.9 GWh |
#496 | Prairie Winds SD1 | Crow Lake, SD | 343.7 GWh |
#497 | Mehoopany Wind Energy LLC | Noxen, PA | 343.3 GWh |
#498 | Tule Wind LLC | Boulevard, CA | 342.5 GWh |
#500 | Bent Tree Wind Farm Phase 1 | Hartland, MN | 341.6 GWh |
#501 | Canadian Hills Wind | El Rino, OK | 340.5 GWh |
#502 | Sac County Wind, LLC | Sac City, IA | 339.3 GWh |
#503 | Tuscola Bay Wind | Reese, MI | 337.8 GWh |
#504 | Colorado Highlands Wind | Fleming, CO | 337.2 GWh |
#505 | Ivester Wind Farm | Wellsburg, IA | 337.0 GWh |
#506 | Alta Wind X | Mojave, CA | 336.5 GWh |
#507 | Baron Winds Farm | Cohocton, NY | 336.4 GWh |
#508 | Ashtabula Wind II LLC | Luverne, ND | 335.8 GWh |
#509 | Meadow Lake Wind Farm V LLC | Chalmers, IN | 335.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding High Plains.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Corriedale Wind Energy | Cheyenne, WY | 198.3 GWh | 65.9 mi |
Dunlap | Medicine Bow, WY | 432.0 GWh | 26.6 mi |
Ekola Flats | Hanna, WY | 748.0 GWh | 25.2 mi |
Foote Creek I | McFadden, WY | 215.5 GWh | 10.3 mi |
Foote Creek III | McFadden, WY | 14.6 GWh | 8.9 mi |
Foote Creek IV | Rock River, WY | 11.6 GWh | 8.7 mi |
Fremont Canyon | Alcova, WY | 176.3 GWh | 68.5 mi |
Happy Jack Windpower Project | Cheyenne, WY | 55.3 GWh | 64.2 mi |
Kortes | Sinclair, WY | 146.2 GWh | 56.5 mi |
Laramie River Station | Wheatland, WY | 7.2 TWh | 65.3 mi |
McFadden Ridge | Rock River, WY | 104.3 GWh | 3.6 mi |
Medicine Bow | Medicine Bow, WY | 10.9 GWh | 16.3 mi |
Roundhouse Renewable Energy II | Granite, WY | 260.8 GWh | 67.9 mi |
Roundhouse Wind Energy Project | Cheyenne, WY | 827.6 GWh | 61.6 mi |
Seminoe | Sinclair, WY | 140.7 GWh | 56.9 mi |
Seven Mile Hill | Medicine Bow, WY | 463.2 GWh | 25.3 mi |
Silver Sage Windpower | Cheyenne, WY | 107.0 GWh | 63.5 mi |
Sinclair Oil Refinery | Sinclair, WY | 4.8 GWh | 57.1 mi |
TB Flats | Medicine Bow, WY | 1.4 TWh | 36.5 mi |
Whiskey Hill Solar | Walden, CO | 2.4 GWh | 61.3 mi |