High Lonesome Wind Power, LLC Hybrid
2731 W US Hwy 67, Rankin, TX 79778Plant Summary Information
High Lonesome Wind Power, LLC Hybrid is ranked #26 out of 1,345 wind farms nationwide in terms of total annual net electricity generation.
High Lonesome Wind Power, LLC Hybrid generated 238.3 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | High Lonesome Wind Power, LLC Hybrid |
---|---|
Utility Name | High Lonesome Wind Power, LLC |
Location | Upton County, TX |
Initial Operation Date | July 2021 |
Last Update | Sep 2024 |
Annual Generation | 1.2 TWh |
Annual Consumption | 4.6 M MMBtu |
Ranked #645 out of 11,852 Power Plants Nationwide | |
Ranked #26 out of 1,345 Wind Power Plants Nationwide | |
Ranked #94 out of 754 Texas Power Plants | |
Ranked #10 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Map of High Lonesome Wind Power, LLC Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for High Lonesome Wind Power, LLC Hybrid.
Monthly Net Generation for High Lonesome Wind Power, LLC Hybrid
High Lonesome Wind Power, LLC Hybrid Details
Summary Information | |
---|---|
Plant Name | High Lonesome Wind Power, LLC Hybrid (62562) |
Plant Address | 2731 W US Hwy 67, Rankin, TX 79778 |
Utility | High Lonesome Wind Power, LLC (62046) |
Latitude, Longitude | 31.17165, -101.88115 |
Generation Dates on File | Sep 2020 to Sep 2024 |
Initial Operation Date | July 2021 |
Annual Generation | 1.2 TWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 22-147-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 345.00 kV |
Energy Storage | Yes |
Generator BA Details Operating June 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 51.1 MW |
Summer Capacity | 51.1 MW |
Winter Capacity | 51.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 81 |
---|---|
Maximum Charge Rate | 51.1 MW |
Maximum Discharge Rate | 51.1 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 81.3 |
Storage Enclosure Type | CS |
Arbitrage | P |
Frequency Regulation | Yes |
Voltage Or Reactive Power Support | Yes |
Excess Wind And Solar Generation | Yes |
Independent | Yes |
Direct Support Of Another Unit | No |
Support T D Asset | No |
Generator HILO Details Operating July 2023
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 449.5 MW |
Summer Capacity | 449.5 MW |
Winter Capacity | 449.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 140 |
Time From Cold Shutdown To Full Load | 1H |
Turbine Details | |
Number Of Turbines | 140 |
---|---|
Predominant Turbine Manufacturer | Acciona |
Predominant Turbine Model Number | AW132/3000 |
Design Wind Speed | 18 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 398 |
Generator HILO2 Details Operating July 2023
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 22 |
Time From Cold Shutdown To Full Load | 1H |
Turbine Details | |
Number Of Turbines | 22 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.3-116 |
Design Wind Speed | 18 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 295 |
High Lonesome Wind Power, LLC Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#16 | Palo Alto Wind Farm | Emmetsburg, IA | 1.5 TWh |
#17 | Fowler Ridge Wind Farm LLC | Fowler, IN | 1.4 TWh |
#18 | TB Flats | Medicine Bow, WY | 1.4 TWh |
#19 | Beaver Creek Wind | Ogden, IA | 1.4 TWh |
#20 | North English | Montezuma, IA | 1.4 TWh |
#21 | Maverick Creek Wind | Eden, TX | 1.3 TWh |
#22 | Clearwater Wind I | Miles City, MT | 1.3 TWh |
#23 | Lacy Creek Wind Energy Center | Sterling City, TX | 1.3 TWh |
#24 | Neosho Ridge Wind Energy Center | Galesburg, KS | 1.3 TWh |
#25 | Jordan Creek Wind Farm, LLC | Judyville, IN | 1.2 TWh |
#27 | Iron Star Wind Project | Dodge City, KS | 1.2 TWh |
#28 | Inertia Wind Project | Haskell, TX | 1.2 TWh |
#29 | Santa Rita Wind Energy | Big Lake, TX | 1.2 TWh |
#30 | Thunderhead Wind Energy LLC | Boone, NE | 1.2 TWh |
#31 | Red Cloud Wind LLC | Corona, NM | 1.2 TWh |
#32 | Foard City Wind | Crowell, TX | 1.2 TWh |
#33 | Mesquite Star | Roscoe, TX | 1.2 TWh |
#34 | Grande Prairie Wind Farm | O'Neill, NE | 1.2 TWh |
#35 | Ranchero Wind Farm LLC | Iraan, TX | 1.2 TWh |
#36 | Flat Ridge 2 Wind Energy LLC | Zenda, KS | 1.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding High Lonesome Wind Power, LLC Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo 6 | Fort Stockton, TX | 235.1 GWh | 26.2 mi |
Appaloosa Run Wind | Rankin, TX | 697.8 GWh | 3.1 mi |
Castle Gap Solar Hybrid | McCarney, TX | 388.3 GWh | 23.8 mi |
CED Crane Solar | Crane, TX | 402.8 GWh | 26.1 mi |
Desert Sky | Iraan, TX | 462.3 GWh | 21.3 mi |
East Pecos Solar | McCamey, TX | 253.8 GWh | 26.5 mi |
Emerald Grove | Crane, TX | 278.1 GWh | 28.8 mi |
Greasewood Solar | Fort Stockton, TX | 156.9 GWh | 37.2 mi |
King Mountain Wind Ranch 1 | McCamey, TX | 558.4 GWh | 21.5 mi |
Midway Solar - TX | Fort Stockton, TX | 306.0 GWh | 23.6 mi |
NWP Indian Mesa Wind Farm | Iraan, TX | 197.8 GWh | 25.2 mi |
Pearl Solar | Fort Stockton, TX | 98.8 GWh | 26.2 mi |
RE Maplewood | McCamey, TX | 481.1 GWh | 26 mi |
Roadrunner, LLC Hybrid | McCamey, TX | 981.5 GWh | 18.7 mi |
Santa Rita Wind Energy | Big Lake, TX | 1.2 TWh | 33.3 mi |
Shamrock Wind | TBD, TX | 645.2 GWh | 23 mi |
Upton County Solar | McCamey, TX | 285.5 GWh | 24.7 mi |
White Mesa Wind | Ozona, TX | 1.8 TWh | 40.8 mi |
Woodward Mountain I | Girvin, TX | 175.7 GWh | 35 mi |
Woodward Mountain II | Girvin, TX | 168.8 GWh | 35 mi |