High Bridge
155 Randolph Ave, St. Paul, MN 55101Plant Summary Information
High Bridge is ranked #5 out of 736 power plants in Minnesota in terms of total annual net electricity generation.
High Bridge is comprised of 3 generators and generated 859.4 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | High Bridge |
---|---|
Utility Name | Northern States Power Co - Minnesota |
Location | Ramsey County, MN |
Initial Operation Date | May 2008 |
Last Update | Sep 2024 |
Annual Generation | 3.2 TWh |
Annual Consumption | 21.6 M MMBtu |
Ranked #368 out of 11,852 Power Plants Nationwide | |
Ranked #221 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #5 out of 736 Minnesota Power Plants | |
Ranked #1 out of 52 Minnesota Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of High Bridge
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for High Bridge.
Monthly Net Generation for High Bridge
High Bridge Details
Summary Information | |
---|---|
Plant Name | High Bridge (1912) |
Plant Address | 155 Randolph Ave, St. Paul, MN 55101 |
Utility | Northern States Power Co - Minnesota (13781) |
Latitude, Longitude | 44.9314, -93.1117 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | May 2008 |
Annual Generation | 3.2 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Mississippi River |
Ash Impoundment | No |
Transmission / Distribution Owner | Northern States Power Co - Minnesota (13781) MN |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | NORTHERN STATES PWR CO |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator 7 Details Operating May 2008
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | HBR0 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
RTO ISO LMP Node Designation | NSP HIBRDGE HIBRDG_7_UNIT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NSP HIBRDGE HIBRDG_7_UNIT |
Nameplate Capacity | 197 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 152 MW |
Winter Capacity | 185 MW |
Minimum Load | 88 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2008 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 8 Details Operating May 2008
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | HBR0 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
RTO ISO LMP Node Designation | NSP HIBRDGE HIBRDG_8_UNIT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NSP HIBRDGE HIBRDG_8_UNIT |
Nameplate Capacity | 197 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 152 MW |
Winter Capacity | 185 MW |
Minimum Load | 88 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2008 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 9 Details Operating May 2008
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | HBR0 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | NSP HIBRDGE HIBRD9_1_UNIT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NSP HIBRDGE HIBRD9_1_UNIT |
Nameplate Capacity | 250 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 226 MW |
Winter Capacity | 236 MW |
Minimum Load | 162 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2008 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
High Bridge Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#211 | Granite Ridge | Londonderry, NH | 3.2 TWh |
#212 | Lost Pines 1 Power Project | Bastrop, TX | 3.2 TWh |
#213 | Cedar Bayou | Baytown, TX | 3.2 TWh |
#214 | Hinds Energy Facility | Jackson, MS | 3.2 TWh |
#215 | Wansley Unit 9 | Franklin, GA | 3.2 TWh |
#216 | Wildcat Point Generation Facility | Conowingo, MD | 3.2 TWh |
#217 | Harrison County Power Project | Marshall, TX | 3.2 TWh |
#218 | Westbrook Energy Center Power Plant | Westbrook, ME | 3.2 TWh |
#219 | Hobbs Generating Station | Hobbs, NM | 3.2 TWh |
#220 | Jack Fusco Energy Center | Thompsons, TX | 3.2 TWh |
#222 | Empire Generating Co LLC | Rensselaer, NY | 3.2 TWh |
#223 | Desert Basin | Casa Grande, AZ | 3.2 TWh |
#224 | Los Medanos Energy Center | Pittsburg, CA | 3.1 TWh |
#225 | Carty Generating Station | Boardman, OR | 3.1 TWh |
#226 | Hermiston Generating Plant | Hermiston, OR | 3.1 TWh |
#227 | Wolf Hollow I LP | Granbury, TX | 3.0 TWh |
#228 | Sugar Creek Power | West Terre Haute, IN | 3.0 TWh |
#229 | Colusa Generating Station | Maxwell, CA | 3.0 TWh |
#230 | McWilliams | Gantt, AL | 3.0 TWh |
#231 | Quantum Choctaw Power LLC | Ackerman, MS | 2.9 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding High Bridge.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Black Dog | Burnsville, MN | 1.8 TWh | 10.7 mi |
Covanta Hennepin Energy | Minneapolis, MN | 207.2 GWh | 9 mi |
Crane Garden | Lester Prairie, MN | 193.0 MWh | 4.2 mi |
Hennepin Island | Minneapolis, MN | 43.4 GWh | 7.8 mi |
Inver Hills | Inver Grove Heights, MN | 78.2 GWh | 10.9 mi |
MNDOT Standby Generation | St. Paul, MN | 30.0 MWh | 1.5 mi |
MSC-GreyCloud01 Community Solar | St. Paul Park, MN | 1.8 GWh | 10.6 mi |
Riverside (MN) | Minneapolis, MN | 2.6 TWh | 10.1 mi |
SAF Hydroelectric LLC | Minneapolis, MN | 28.7 GWh | 7.4 mi |
St Paul Cogeneration | St. Paul, MN | 153.1 GWh | 1.1 mi |
St. Paul Intl Airport Red & Blue Parking | St. Paul, MN | 3.0 GWh | 6 mi |
STAG St. Paul Project CSG | Saint Paul, MN | 1.3 GWh | 5.2 mi |
Thomson Reuters Campus Bldg A-D | Eagan, MN | 99.0 MWh | 7.7 mi |
Thomson Reuters Data Center Bldg ES101 | Eagan, MN | 9.0 MWh | 7.4 mi |
Thomson Reuters Data Center Bldg H | Eagan, MN | 52.0 MWh | 7.1 mi |
Twin Cities Hydro LLC | St. Paul, MN | 71.6 GWh | 4.4 mi |
Univ Minnesota CHP Plant | Minneapolis, MN | 173.9 GWh | 7.1 mi |
West Group Data Center | Eagan, MN | 72.0 MWh | 7.3 mi |
West Group Data Center F | Eagan, MN | 57.0 MWh | 7.1 mi |
Woodbury Solar | Woodbury, MN | 4.2 GWh | 7.8 mi |