Henrietta Solar Project
19177 Kent Ave., Lemoore, CA 19177Plant Summary Information
Henrietta Solar Project is ranked #74 out of 799 solar farms in California in terms of total annual net electricity generation.
Henrietta Solar Project generated 42.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Henrietta Solar Project |
---|---|
Utility Name | Southern Power Co |
Location | Kings County, CA |
Initial Operation Date | August 2016 |
Last Update | Dec 2023 |
Annual Generation | 234.2 GWh |
Annual Consumption | 831.6 k MMBtu |
Ranked #2,124 out of 11,852 Power Plants Nationwide | |
Ranked #229 out of 5,655 Solar Power Plants Nationwide | |
Ranked #233 out of 1,570 California Power Plants | |
Ranked #74 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Parrey, LLC (2013 to 2015) Southern Power Co (2016 to 2023) |
Map of Henrietta Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Henrietta Solar Project.
Monthly Net Generation for Henrietta Solar Project
Henrietta Solar Project Details
Summary Information | |
---|---|
Plant Name | Henrietta Solar Project (58975) |
Plant Address | 19177 Kent Ave., Lemoore, CA 19177 |
Utility | Southern Power Co (17650) |
Latitude, Longitude | 36.21881, -119.80583 |
Generation Dates on File | Jun 2016 to Dec 2023 |
Initial Operation Date | August 2016 |
Annual Generation | 234.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator PV1 Details Operating August 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 102 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 127.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Henrietta Solar Project Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Parrey, LLC | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#219 | Resurgence Solar | Boron, CA | 233.7 GWh |
#220 | Eleven Mile Solar Center | Coolidge, AZ | 230.4 GWh |
#221 | Wilmot Energy Center LLC | Tucson, AZ | 241.7 GWh |
#222 | SR Snipesville II | Denton, GA | 240.4 GWh |
#223 | Oak Trail Solar, LLC | Moyock, NC | 240.4 GWh |
#224 | Elara Solar | Pearsall, TX | 240.1 GWh |
#225 | River Ferry Solar 1 | West Union, IL | 236.2 GWh |
#226 | East Line Solar | Coolidge, AZ | 235.9 GWh |
#227 | Alamo 6 | Fort Stockton, TX | 235.1 GWh |
#228 | SR Snipesville III | Denton, GA | 235.0 GWh |
#230 | Willow Spring Solar, LLC | Rosamond, CA | 234.2 GWh |
#231 | Maverick Solar 4, LLC | Desert Center, CA | 234.0 GWh |
#232 | SR Clay, LLC | Fort Gaines, GA | 233.9 GWh |
#233 | RE Astoria | Rosamond, CA | 233.5 GWh |
#234 | Briar Creek Solar 1 | Corsicana, TX | 233.3 GWh |
#235 | Prairie State Solar Project | Swanwick Township, IL | 233.2 GWh |
#236 | Enterprise Solar, LLC | Newcastle, UT | 232.7 GWh |
#237 | West of the Pecos Solar | TBD, TX | 232.4 GWh |
#238 | Galloway 2 Solar Farm | Paint Rock, TX | 230.9 GWh |
#239 | CA Flats Solar 130, LLC | Shandon, CA | 228.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Henrietta Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Almond | Lemoore, CA | 9.6 GWh | 5.8 mi |
American Kings Solar, LLC | Lemoore, CA | 325.3 GWh | 5.3 mi |
Aquamarine | Lemoore, CA | 409.5 GWh | 5.8 mi |
Chestnut | Lemoore, CA | 322.2 GWh | 6.9 mi |
Guernsey Solar Station | Hanford, CA | 24.2 GWh | 9.5 mi |
Hanford Energy Park Peaker | Hanford, CA | 4.2 GWh | 9.5 mi |
Henrietta Peaker | Lemoore, CA | 5.0 GWh | 5.7 mi |
Java Solar, LLC | Lemoore, CA | 28.6 GWh | 1.2 mi |
Lemoore 1 | Lemoore, CA | 232.0 MWh | 2.7 mi |
Mustang Two | Lemoore, CA | 393.0 GWh | 5 mi |
RE Kansas Solar, LLC | Lemoore, CA | 38.7 GWh | 2.5 mi |
RE Kansas South LLC | Lemoore, CA | 51.1 GWh | 1.7 mi |
RE Kent South, LLC | Lemoore, CA | 40.6 GWh | 5.6 mi |
RE Mustang LLC | Lemoore, CA | 149.9 GWh | 5.4 mi |
Slate Hybrid | Stratford, CA | 665.0 GWh | 5 mi |
Solar Blue | Lemoore, CA | 560.8 GWh | 6.3 mi |
Verwey-Hanford Dairy Digester #1 | Hanford, CA | 360.0 MWh | 7.3 mi |
Verwey-Hanford Dairy Digester #2 | Hanford, CA | 5.3 GWh | 7.3 mi |
Verwey-Hanford Dairy Digester #3 | Hanford, CA | 5.3 GWh | 7.3 mi |
Westside Solar Power PV1 | Lemoore, CA | 4.6 GWh | 5.6 mi |