Hector Farm
307 Shiloh Rd., Troy, NC 27371Plant Summary Information
Hector Farm is ranked #211 out of 738 solar farms in North Carolina in terms of total annual net electricity generation.
Hector Farm generated 2.6 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Hector Farm |
---|---|
Utility Name | Strata Manager, LLC |
Location | Montgomery County, NC |
Initial Operation Date | March 2017 |
Last Update | Dec 2022 |
Annual Generation | 10.0 GWh |
Annual Consumption | 36.7 k MMBtu |
Ranked #5,888 out of 11,249 Power Plants Nationwide | |
Ranked #1,505 out of 5,158 Solar Power Plants Nationwide | |
Ranked #287 out of 858 North Carolina Power Plants | |
Ranked #211 out of 738 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Hector Farm, LLC (2016 to 2020) Strata Manager, LLC (2021 to 2022) |
Map of Hector Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hector Farm.
Monthly Net Generation for Hector Farm
Hector Farm Details
Summary Information | |
---|---|
Plant Name | Hector Farm (60577) |
Plant Address | 307 Shiloh Rd. Troy, NC 27371 |
Utility | Strata Manager, LLC (64778) |
Latitude, Longitude | 35.37624, -79.90972 |
Generation Dates on File | Mar 2017 to Dec 2022 |
Initial Operation Date | March 2017 |
Annual Generation | 10.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF 15-174 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Progress East (CPLE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 22.86 kV |
Energy Storage | No |
Generator 1 Details Operating March 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 6.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Hector Farm Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Hector Farm, LLC | 800 Taylor St, Suite 200, Durham, NC 27701 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1495 | Bunn Level Farm, LLC | Bunnlevel, NC | 10.0 GWh |
#1496 | Boaz Farm Solar | Sanford, NC | 10.0 GWh |
#1497 | Spencer Farm, LLC | Salisbury, NC | 10.0 GWh |
#1498 | Laurinburg Farm | Laurinburg, NC | 10.0 GWh |
#1499 | ZV Solar 3, LLC | Red Springs, NC | 10.0 GWh |
#1500 | Rockingham Solar, LLC | Marston, NC | 10.0 GWh |
#1501 | Manway Solar Farm | Garland, NC | 10.0 GWh |
#1502 | Bo Biggs Solar | Lumberton, NC | 10.0 GWh |
#1503 | Floyd Solar, LLC | Fairmont, NC | 10.0 GWh |
#1504 | Elliana Solar | Burlington, NC | 10.0 GWh |
#1506 | Trinity Solar | Trinity, NC | 10.0 GWh |
#1507 | ABD Farms | Asheboro, NC | 9.9 GWh |
#1508 | Spring Hope Solar 2, LLC | Spring Hope, NC | 9.9 GWh |
#1509 | RE Rio Grande Solar LLC | Mojave, CA | 9.9 GWh |
#1510 | G&S Wantage Solar LLC | Wantage, NJ | 9.9 GWh |
#1511 | Arborgate Solar | Pittsboro, NC | 9.9 GWh |
#1512 | Red Oak Solar Farm, LLC | Nashville, NC | 9.9 GWh |
#1513 | 1025 Traveller Solar, LLC | Sanford, NC | 9.9 GWh |
#1514 | Branch Solar Farm | Branch, AR | 9.9 GWh |
#1515 | Sonne Two | Newton, NC | 9.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hector Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Achilles Solar | Troy, NC | 10.7 GWh | 1.1 mi |
Albemarle Prime Power Park | New London, NC | 162.9 MWh | 13.8 mi |
Biscoe Solar LLC | Biscoe, NC | 9.9 GWh | 7.9 mi |
Cabin Creek Solar, LLC | Biscoe, NC | 171.0 GWh | 9.9 mi |
Copperfield | Troy, NC | 4.2 GWh | 5.2 mi |
ESA Albemarle NC Solar | Albemarle, NC | 4.6 GWh | 12.1 mi |
Falls Hydro | Badin, NC | 125.6 GWh | 9.4 mi |
Fisher Solar Farm - NC | Oakboro, NC | 9.9 GWh | 11.7 mi |
Gilead | Gilead, NC | 7.0 GWh | 13.6 mi |
Haywood Farm Solar, LLC | Troy, NC | 9.7 GWh | 2.3 mi |
Kalish Farm Solar | Candor, NC | 9.3 GWh | 11.7 mi |
Little River PV 1 | Randolph, NC | 9.5 GWh | 12.7 mi |
Montgomery Solar LLC | Biscoe, NC | 41.4 GWh | 8.3 mi |
Narrows (NC) | Badin, NC | 453.9 GWh | 10.7 mi |
Panda Solar NC 8, LLC | Star, NC | 4.1 GWh | 11.9 mi |
Samarcand Solar Farm, LLC | Biscoe, NC | 8.8 GWh | 12.9 mi |
Seagrove | Seagrove, NC | 8.8 GWh | 12.8 mi |
Spicewood Solar Farm LLC | Eagle Springs, NC | 9.3 GWh | 12.8 mi |
Uwharrie Mountain Renewable | Mt. Gilead, NC | 47.1 GWh | 4.3 mi |
Whiskey Solar | Cumberland, NC | 11.3 GWh | 12.1 mi |