Hecate Energy Blair Road LLC
1908 Blair Road, Jacksonville, FL 3221Plant Summary Information
Hecate Energy Blair Road LLC is ranked #139 out of 165 solar farms in Florida in terms of total annual net electricity generation.
Hecate Energy Blair Road LLC generated 1.8 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Hecate Energy Blair Road LLC |
---|---|
Utility Name | Hecate Energy Blair Road LLC |
Location | Duval County, FL |
Initial Operation Date | January 2018 |
Last Update | Dec 2022 |
Annual Generation | 7.0 GWh |
Annual Consumption | 26.1 k MMBtu |
Ranked #6,844 out of 11,249 Power Plants Nationwide | |
Ranked #2,219 out of 5,158 Solar Power Plants Nationwide | |
Ranked #239 out of 272 Florida Power Plants | |
Ranked #139 out of 165 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Hecate Energy Blair Road LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hecate Energy Blair Road LLC.
Monthly Net Generation for Hecate Energy Blair Road LLC
Hecate Energy Blair Road LLC Details
Summary Information | |
---|---|
Plant Name | Hecate Energy Blair Road LLC (62778) |
Plant Address | 1908 Blair Road Jacksonville, FL 3221 |
Utility | Hecate Energy Blair Road LLC (62690) |
Latitude, Longitude | 30.286, -81.834 |
Generation Dates on File | Jan 2018 to Dec 2022 |
Initial Operation Date | January 2018 |
Annual Generation | 7.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | JEA (JEA) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | JEA (9617) FL |
Grid Voltage | 23.00 kV |
Energy Storage | No |
Generator HEJEA Details Operating January 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 4 MW |
Summer Capacity | 4.2 MW |
Winter Capacity | 4.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Tilt Angle | 55 |
DC Net Capacity | 4.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Hecate Energy Blair Road LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2209 | Randolph | Randolph, MA | 7.0 GWh |
#2210 | DG Iron Mountain | Edison, NJ | 7.0 GWh |
#2211 | TWE Chocowinity Solar, LLC | Chocowinity, NC | 7.0 GWh |
#2212 | Dixon Dairy Road Solar | Kings Mountain, NC | 7.0 GWh |
#2213 | BD Solar Ellsworth LLC | Augusta, ME | 7.0 GWh |
#2214 | RE Dillard 2 LLC | Sloughhouse, CA | 7.0 GWh |
#2215 | Yadkinville Solar | Yadkinville, NC | 7.0 GWh |
#2216 | Johnstown Solar 1, LLC | Gloversville, NY | 7.0 GWh |
#2217 | California State Univ at Channel Islands | Camarillo, CA | 7.0 GWh |
#2218 | Eichtens Community Solar | Center, MN | 7.0 GWh |
#2220 | RE Dillard 3 LLC | Sloughhouse, CA | 7.0 GWh |
#2221 | 3232 Batavia Solar | Batavia, NY | 7.0 GWh |
#2222 | Route 19 #2 Community Solar Farm | Pike, NY | 7.0 GWh |
#2223 | Quittacas Pond Solar | Rochester, MA | 7.0 GWh |
#2224 | Richmond NMCA | Wood River Junction, RI | 6.9 GWh |
#2225 | Staunton | Brazil, IN | 6.9 GWh |
#2226 | KDC Solar ASGM | Bridgeton, NJ | 6.9 GWh |
#2227 | Chenango Solar | Castle Creek, NY | 6.9 GWh |
#2228 | Route 14A CDG Solar North and South LLC | Geneva, NY | 6.9 GWh |
#2229 | Belchertown Renewables Community Solar | Belchertown, MA | 6.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hecate Energy Blair Road LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AEP Jacksonville Solar Project | Duval, FL | 13.1 GWh | 18.6 mi |
Anheuser-Busch Jacksonville | Jacksonville, FL | 81.0 GWh | 15.2 mi |
Baptist Medical Center | Jacksonville, FL | 21.8 GWh | 10.4 mi |
Brandy Branch | Baldwin, FL | 5.2 TWh | 7.2 mi |
Egret Solar Center | Glen St. Mary, FL | 151.0 GWh | 20.9 mi |
Greenland Energy Center | Jacksonville, FL | 574.3 GWh | 20.8 mi |
IKEA Jacksonville Rooftop PV System | Jacksonville, FL | 2.6 GWh | 19.7 mi |
Imeson Solar | Jscksonville, FL | 13.1 GWh | 13.8 mi |
J D Kennedy | Jacksonville, FL | 297.6 GWh | 13.5 mi |
Jacksonville Solar | Jacksonville, FL | 19.4 GWh | 7.7 mi |
Jax LNG | Jacksonville, FL | 40.5 GWh | 18.1 mi |
Magnolia Springs Solar Center | Green Cove Springs, FL | 161.6 GWh | 28.1 mi |
Nassau Solar Center | Callahan, FL | 149.7 GWh | 15.3 mi |
Northern Preserve Solar | Glen St. Mary, FL | 134.7 GWh | 23.6 mi |
Northside Generating Station | Jacksonville, FL | 3.2 TWh | 19.1 mi |
Old Plank Road Solar Farm, LLC | Jacksonville, FL | 5.9 GWh | 3.9 mi |
Seminole Mill | Jacksonville, FL | 111.0 GWh | 16.8 mi |
Starratt Solar | Jacksonville, FL | 9.3 GWh | 20 mi |
Terrill Creek | Green Cove Springs, FL | 27.4 GWh | 28.3 mi |
Trail Ridge Landfill Gas Recovery | Baldwin, FL | 35.2 GWh | 13 mi |