Hecate Energy Beacon Solar 4
29956 Highway 14, Cantil, CA 93519Plant Summary Information
Hecate Energy Beacon Solar 4 is ranked #110 out of 799 solar farms in California in terms of total annual net electricity generation.
Hecate Energy Beacon Solar 4 generated 37.8 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Hecate Energy Beacon Solar 4 |
---|---|
Utility Name | AES Distributed Energy |
Location | Kern County, CA |
Initial Operation Date | December 2016 |
Last Update | Aug 2024 |
Annual Generation | 113.7 GWh |
Annual Consumption | 427.3 k MMBtu |
Ranked #3,023 out of 11,835 Power Plants Nationwide | |
Ranked #539 out of 5,643 Solar Power Plants Nationwide | |
Ranked #344 out of 1,569 California Power Plants | |
Ranked #110 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Hecate Energy Beacon Solar 4, LLC (2013 to 2013) Sustainable Power Group, LLC (2014 to 2020) AES Distributed Energy (2021 to 2023) |
Map of Hecate Energy Beacon Solar 4
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hecate Energy Beacon Solar 4.
Monthly Net Generation for Hecate Energy Beacon Solar 4
Hecate Energy Beacon Solar 4 Details
Summary Information | |
---|---|
Plant Name | Hecate Energy Beacon Solar 4 (59317) |
Plant Address | 29956 Highway 14, Cantil, CA 93519 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 35.25361, -118.02694 |
Generation Dates on File | Nov 2016 to Aug 2024 |
Initial Operation Date | December 2016 |
Annual Generation | 113.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator BEAC4 Details Operating December 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Summer Capacity | 47 MW |
Winter Capacity | 45 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 56.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Hecate Energy Beacon Solar 4 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#529 | Sweetbay Solar Center | North of Indiantown, FL | 116.6 GWh |
#530 | OE_MS6 | St.Artesia, MS | 114.9 GWh |
#531 | OE_GA3 | Camilla, GA | 116.0 GWh |
#532 | Pioneer Trail Solar Energy Center | New Smyrna Beach, FL | 115.6 GWh |
#533 | Macho Springs | Deming, NM | 115.5 GWh |
#534 | Terrill Creek | Green Cove Springs, FL | 114.9 GWh |
#535 | LA3 West Baton Rouge Solar Facility | West Baton Rouge, LA | 114.3 GWh |
#536 | SEGS IX | Hinkley, CA | 114.2 GWh |
#537 | Antelope DSR 1 | Lancaster, CA | 114.2 GWh |
#538 | Nestlewood Solar | Hamersville, OH | 114.1 GWh |
#540 | SR DeSoto II | DeSoto, GA | 113.7 GWh |
#541 | Yellow Pine II | Enterprise, NV | 109.8 GWh |
#542 | Silver Palm | TBD, FL | 113.2 GWh |
#543 | Moffett Solar Project | Ridgeland, SC | 113.2 GWh |
#544 | SolaireHolman Solar Project | Alpine, TX | 113.1 GWh |
#545 | Beacon Solar Plant Site 2 | Cantil, CA | 113.0 GWh |
#546 | SR Turkey Creek, LLC | Lancaster, KY | 113.0 GWh |
#547 | Silver State Solar Power North | Primm, NV | 112.8 GWh |
#548 | Southampton Solar, LLC | Newsoms, VA | 111.6 GWh |
#549 | Pineapple | Port St Lucie, FL | 111.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hecate Energy Beacon Solar 4.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alta Wind X | Mojave, CA | 336.5 GWh | 16.6 mi |
Beacon Solar Plant Site 2 | Cantil, CA | 113.0 GWh | 1.8 mi |
Beacon Solar Plant Site 5 | Cantil, CA | 93.1 GWh | 0.5 mi |
CalCity Solar 1 | California City, CA | 7.4 GWh | 8.5 mi |
California City | California City, CA | 5.3 GWh | 7.2 mi |
Difwind Farms Ltd VI | Mojave, CA | 15.3 GWh | 16.2 mi |
Edwards Sanborn S1 | Mojave, CA | 93.5 GWh | 16.7 mi |
Edwards Sanborn S3 | Mojave, CA | 79.4 GWh | 17.3 mi |
Hecate Energy Beacon Solar 1 | Cantil, CA | 129.0 GWh | 1.3 mi |
Hecate Energy Beacon Solar 3 | Cantil, CA | 133.3 GWh | 0.7 mi |
North Sky River Energy LLC | Weldon, CA | 386.6 GWh | 11.1 mi |
Pine Tree Solar Project | Owenyo, CA | 6.9 GWh | 9.7 mi |
Pine Tree Wind Power Project | Cantil, CA | 61.0 GWh | 8.4 mi |
RE Barren Ridge 1 | Mojave, CA | 169.5 GWh | 4.1 mi |
Rising Tree Wind Farm | Mojave, CA | 213.4 GWh | 16.3 mi |
Rising Tree Wind Farm II | Mojave, CA | 47.7 GWh | 15.2 mi |
Sky River Wind Energy Center | Tehachapi, CA | 201.6 GWh | 12.4 mi |
Springbok 3 Solar Farm Hybrid | Cantil, CA | 242.6 GWh | 5.9 mi |
Springbok Solar Farm 1 | Cantil, CA | 291.6 GWh | 4.1 mi |
Springbok Solar Farm 2 | Cantil, CA | 404.2 GWh | 2.8 mi |