Hecate Energy Beacon Solar 3
29956 Highway 14, Cantil, CA 93519Plant Summary Information
Hecate Energy Beacon Solar 3 is ranked #99 out of 801 solar farms in California in terms of total annual net electricity generation.
Hecate Energy Beacon Solar 3 generated 34.8 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Hecate Energy Beacon Solar 3 |
---|---|
Utility Name | AES Distributed Energy |
Location | Kern County, CA |
Initial Operation Date | December 2016 |
Last Update | Oct 2024 |
Annual Generation | 132.1 GWh |
Annual Consumption | 486.2 k MMBtu |
Ranked #2,851 out of 11,866 Power Plants Nationwide | |
Ranked #490 out of 5,672 Solar Power Plants Nationwide | |
Ranked #320 out of 1,571 California Power Plants | |
Ranked #99 out of 801 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Hecate Energy Beacon Solar 3, LLC (2013 to 2013) Sustainable Power Group, LLC (2014 to 2020) AES Distributed Energy (2021 to 2023) |
Map of Hecate Energy Beacon Solar 3
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hecate Energy Beacon Solar 3.
Monthly Net Generation for Hecate Energy Beacon Solar 3
Hecate Energy Beacon Solar 3 Details
Summary Information | |
---|---|
Plant Name | Hecate Energy Beacon Solar 3 (59316) |
Plant Address | 29956 Highway 14, Cantil, CA 93519 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 35.25306, -118.01472 |
Generation Dates on File | Dec 2016 to Oct 2024 |
Initial Operation Date | December 2016 |
Annual Generation | 132.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator BEAC3 Details Operating December 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 56 MW |
Summer Capacity | 51 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Fixed Tilt | No |
Other Solar Technology | No |
Azimuth Angle | 90 |
DC Net Capacity | 62.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Hecate Energy Beacon Solar 3 Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#480 | Hammock Solar | Labelle, FL | 135.1 GWh |
#481 | Citrus Solar Energy Center Hybrid | Arcadia, FL | 134.7 GWh |
#482 | FPL Chipola River Solar Energy Center | Altha, FL | 134.9 GWh |
#483 | Interstate Solar Energy Center | Ft. Pierce, FL | 134.8 GWh |
#484 | Magnolia Solar | Mulberry, FL | 134.6 GWh |
#485 | Barefoot Bay Solar Energy Center | Sebastian, FL | 134.6 GWh |
#486 | Discovery Solar Center | Merrit Island, FL | 134.5 GWh |
#487 | NC 102 Project LLC | Midland, NC | 134.2 GWh |
#488 | Resurgence Solar II | Boron, CA | 123.5 GWh |
#489 | Ghost Orchid Solar Energy Center | Clewiston, FL | 133.5 GWh |
#491 | Colgreen North Shore Solar Farm | Mecca, CA | 132.1 GWh |
#492 | Three Creeks | Parrish, FL | 132.1 GWh |
#493 | Edwards Sanborn E5 | Mojave, CA | 132.1 GWh |
#494 | Trailside Solar Center | Elkton, FL | 131.8 GWh |
#495 | Canoe | Holt, FL | 131.3 GWh |
#496 | Babcock Solar Energy Center Hybrid | Punta Gorda, FL | 129.9 GWh |
#497 | Wheatridge Hybrid | Morrow, OR | 702.8 GWh |
#498 | Loggerhead Solar Energy Center | Port St. Lucie, FL | 131.2 GWh |
#499 | Beulah Solar | Batesburg, SC | 131.1 GWh |
#500 | Sunshine Gateway Solar Energy Center | Lake City, FL | 127.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hecate Energy Beacon Solar 3.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alta Wind X | Mojave, CA | 336.5 GWh | 17 mi |
Beacon Solar Plant Site 2 | Cantil, CA | 110.8 GWh | 1.2 mi |
Beacon Solar Plant Site 5 | Cantil, CA | 92.9 GWh | 1.1 mi |
CalCity Solar 1 | California City, CA | 7.4 GWh | 8.2 mi |
California City | California City, CA | 5.3 GWh | 6.9 mi |
Difwind Farms Ltd VI | Mojave, CA | 15.3 GWh | 16.6 mi |
Edwards Sanborn S1 | Mojave, CA | 92.7 GWh | 16.9 mi |
Edwards Sanborn S3 | Mojave, CA | 79.8 GWh | 17.4 mi |
Hecate Energy Beacon Solar 1 | Cantil, CA | 128.1 GWh | 1.1 mi |
Hecate Energy Beacon Solar 4 | Cantil, CA | 114.2 GWh | 0.7 mi |
North Sky River Energy LLC | Weldon, CA | 386.6 GWh | 11.7 mi |
Pine Tree Solar Project | Owenyo, CA | 6.9 GWh | 10.3 mi |
Pine Tree Wind Power Project | Cantil, CA | 61.0 GWh | 9.1 mi |
RE Barren Ridge 1 | Mojave, CA | 169.5 GWh | 4.5 mi |
Rising Tree Wind Farm | Mojave, CA | 213.4 GWh | 16.7 mi |
Rising Tree Wind Farm II | Mojave, CA | 47.7 GWh | 15.7 mi |
Sky River Wind Energy Center | Tehachapi, CA | 201.6 GWh | 13.1 mi |
Springbok 3 Solar Farm Hybrid | Cantil, CA | 245.2 GWh | 5.7 mi |
Springbok Solar Farm 1 | Cantil, CA | 291.6 GWh | 3.4 mi |
Springbok Solar Farm 2 | Cantil, CA | 404.2 GWh | 2.1 mi |