Hecate Energy Beacon Solar 1
29956 Highway 14, Cantil, CA 93519Plant Summary Information
Hecate Energy Beacon Solar 1 is ranked #102 out of 799 solar farms in California in terms of total annual net electricity generation.
Hecate Energy Beacon Solar 1 generated 39.2 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Hecate Energy Beacon Solar 1 |
---|---|
Utility Name | AES Distributed Energy |
Location | Kern County, CA |
Initial Operation Date | April 2017 |
Last Update | Sep 2024 |
Annual Generation | 128.8 GWh |
Annual Consumption | 479.8 k MMBtu |
Ranked #2,877 out of 11,852 Power Plants Nationwide | |
Ranked #494 out of 5,655 Solar Power Plants Nationwide | |
Ranked #324 out of 1,570 California Power Plants | |
Ranked #102 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Hecate Energy Beacon Solar 1, LLC (2013 to 2013) Sustainable Power Group, LLC (2014 to 2020) AES Distributed Energy (2021 to 2023) |
Map of Hecate Energy Beacon Solar 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hecate Energy Beacon Solar 1.
Monthly Net Generation for Hecate Energy Beacon Solar 1
Hecate Energy Beacon Solar 1 Details
Summary Information | |
---|---|
Plant Name | Hecate Energy Beacon Solar 1 (59315) |
Plant Address | 29956 Highway 14, Cantil, CA 93519 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 35.26944, -118.01444 |
Generation Dates on File | Apr 2017 to Sep 2024 |
Initial Operation Date | April 2017 |
Annual Generation | 128.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator BEAC1 Details Operating April 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 56 MW |
Summer Capacity | 51 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 63.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Hecate Energy Beacon Solar 1 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#484 | Nassau Solar Center | Callahan, FL | 131.2 GWh |
#485 | Sunshine Gateway Solar Energy Center | Lake City, FL | 128.0 GWh |
#486 | FPL Chipola River Solar Energy Center | Altha, FL | 130.7 GWh |
#487 | Hobnail Solar | Hephzibah, GA | 130.6 GWh |
#488 | Blue Springs | Marianna, FL | 130.4 GWh |
#489 | Wheatridge Hybrid | Morrow, OR | 694.2 GWh |
#490 | Balm Solar | Wimauma, FL | 130.3 GWh |
#491 | Maiden Creek Solar Power Plant | Maiden, NC | 130.0 GWh |
#492 | Miami Dade Solar Energy Center | Miami, FL | 129.7 GWh |
#493 | Shoe Creek Solar, LLC | Laurinburg, NC | 128.8 GWh |
#495 | Oak Solar | Gaston, NC | 128.5 GWh |
#496 | Innovative Solar 42 | Fayetteville, NC | 128.1 GWh |
#497 | Granite Mountain Solar West, LLC | Cedar City, UT | 128.0 GWh |
#498 | Juniper Solar (FL) | Zephyrhills, FL | 127.9 GWh |
#499 | Luciana | Richgrove, CA | 127.7 GWh |
#500 | Grasshopper Solar | Chase City, VA | 127.0 GWh |
#501 | Farmington Solar | Farmington, ME | 126.4 GWh |
#502 | Terrill Creek | Green Cove Springs, FL | 126.2 GWh |
#503 | Silver Palm | TBD, FL | 126.0 GWh |
#504 | BT Cooke Solar, LLC | Gainsville, TX | 126.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hecate Energy Beacon Solar 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alta Wind X | Mojave, CA | 336.5 GWh | 17.9 mi |
Beacon Solar Plant Site 2 | Cantil, CA | 112.3 GWh | 0.9 mi |
Beacon Solar Plant Site 5 | Cantil, CA | 93.2 GWh | 1.8 mi |
CalCity Solar 1 | California City, CA | 7.4 GWh | 9.3 mi |
California City | California City, CA | 5.3 GWh | 8 mi |
Difwind Farms Ltd VI | Mojave, CA | 15.3 GWh | 17.5 mi |
Edwards Sanborn S1 | Mojave, CA | 93.1 GWh | 18 mi |
Edwards Sanborn S3 | Mojave, CA | 80.0 GWh | 18.5 mi |
Hecate Energy Beacon Solar 3 | Cantil, CA | 132.9 GWh | 1.1 mi |
Hecate Energy Beacon Solar 4 | Cantil, CA | 114.0 GWh | 1.3 mi |
North Sky River Energy LLC | Weldon, CA | 386.6 GWh | 11.1 mi |
Pine Tree Solar Project | Owenyo, CA | 6.9 GWh | 10.6 mi |
Pine Tree Wind Power Project | Cantil, CA | 61.0 GWh | 9.2 mi |
RE Barren Ridge 1 | Mojave, CA | 169.5 GWh | 5.4 mi |
Rising Tree Wind Farm | Mojave, CA | 213.4 GWh | 17.6 mi |
Rising Tree Wind Farm II | Mojave, CA | 47.7 GWh | 16.5 mi |
Sky River Wind Energy Center | Tehachapi, CA | 201.6 GWh | 13.1 mi |
Springbok 3 Solar Farm Hybrid | Cantil, CA | 244.9 GWh | 6.8 mi |
Springbok Solar Farm 1 | Cantil, CA | 291.6 GWh | 3.6 mi |
Springbok Solar Farm 2 | Cantil, CA | 404.2 GWh | 2.5 mi |