Heber Geothermal
895 Pitzer Road, Heber, CA 92249Plant Summary Information
Heber Geothermal is ranked #22 out of 63 geothermal power plants nationwide in terms of total annual net electricity generation.
Heber Geothermal is comprised of 5 generators and generated 103.5 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Heber Geothermal |
---|---|
Utility Name | ORCAL Geothermal, Inc |
Location | Imperial County, CA |
Initial Operation Date | June 1985 |
Last Update | Dec 2023 |
Annual Generation | 250.1 GWh |
Annual Consumption | 896.9 k MMBtu |
Ranked #2,041 out of 11,852 Power Plants Nationwide | |
Ranked #22 out of 63 Geothermal Power Plants Nationwide | |
Ranked #214 out of 1,570 California Power Plants | |
Ranked #18 out of 30 California Geothermal Power Plants | |
Fuel Types | Geothermal |
Map of Heber Geothermal
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Heber Geothermal.
Monthly Net Generation for Heber Geothermal
Heber Geothermal Details
Summary Information | |
---|---|
Plant Name | Heber Geothermal (54689) |
Plant Address | 895 Pitzer Road, Heber, CA 92249 |
Utility | ORCAL Geothermal, Inc (49748) |
Latitude, Longitude | 32.7146, -115.518 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | June 1985 |
Annual Generation | 250.1 GWh |
Fuel Types | Geothermal |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 83-394-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Imperial Irrigation District (IID) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Irrigation Canal |
Ash Impoundment | |
Transmission / Distribution Owner | Imperial Irrigation District (9216) CA |
Grid Voltage | 92.00 kV |
Energy Storage | No |
Generator 3 Details Operating June 2006
Technology | Geothermal |
---|---|
Prime Mover | Turbines Used in a Binary Cycle |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 3.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 3 MW |
Winter Capacity | 3.5 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2006 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Geothermal |
Time From Cold Shutdown To Full Load | OVER |
Generator 4 Details Operating January 2018
Technology | Geothermal |
---|---|
Prime Mover | Turbines Used in a Binary Cycle |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 19 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 12.5 MW |
Winter Capacity | 19 MW |
Minimum Load | 12.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Geothermal |
Time From Cold Shutdown To Full Load | OVER |
Generator OEC1 Details Operating April 2023
Technology | Geothermal |
---|---|
Prime Mover | Turbines Used in a Binary Cycle |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 26.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 18 MW |
Winter Capacity | 26.5 MW |
Minimum Load | 12 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Geothermal |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator OEC2 Details Operating April 2023
Technology | Geothermal |
---|---|
Prime Mover | Turbines Used in a Binary Cycle |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 26.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 18 MW |
Winter Capacity | 26.5 MW |
Minimum Load | 12 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Geothermal |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator OEC11 Details Operating September 2023
Technology | Geothermal |
---|---|
Prime Mover | Turbines Used in a Binary Cycle |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 16 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 12 MW |
Winter Capacity | 16 MW |
Minimum Load | 8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Geothermal |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Heber Geothermal Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Ormat Nevada Inc | 6140 Plumas Street, Reno, NV 89519 | Generator 1 | 100.00% |
Ormat Nevada Inc | 6140 Plumas Street, Reno, NV 89519 | Generator 2 | 100.00% |
Ormat Nevada Inc | 6140 Plumas Street, Reno, NV 89519 | Generator 3 | 100.00% |
Ormat Nevada Inc | 6140 Plumas Street, Reno, NV 89519 | Generator 4 | 100.00% |
Ormat Nevada Inc | 6140 Plumas Street, Reno, NV 89519 | Generator OEC1 | 100.00% |
Ormat Nevada Inc | 6140 Plumas Street, Reno, NV 89519 | Generator OEC11 | 100.00% |
Ormat Nevada Inc | 6140 Plumas Street, Reno, NV 89519 | Generator OEC2 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Geothermal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#12 | Coso Power Developers | Inyokern, CA | 327.8 GWh |
#13 | Second Imperial Geothermal | Heber, CA | 326.6 GWh |
#14 | Tungsten Mountain | Fallon, NV | 349.2 GWh |
#15 | Salton Sea Power Gen Co - Unit 4 | Calipatria, CA | 319.7 GWh |
#16 | Del Ranch Company | Calipatria, CA | 311.2 GWh |
#17 | Salton Sea Power LLC - Unit 5 | Calipatria, CA | 302.8 GWh |
#18 | Geothermal 2 | Middletown, CA | 296.1 GWh |
#19 | Coso Energy Developers | Inyokern, CA | 277.3 GWh |
#20 | CD4 | Mammoth Lakes, CA | 272.3 GWh |
#21 | Vulcan-BN Geothermal Power Company | Calipatria, CA | 259.4 GWh |
#23 | Geothermal 1 | Middletown, CA | 250.1 GWh |
#24 | Blundell | Milford, UT | 248.2 GWh |
#25 | Steamboat Hills LP | Reno, NV | 235.6 GWh |
#26 | North Valley | Gerlach, NV | 213.9 GWh |
#27 | NGP Blue Mountain I LLC | Winnemucca, NV | 193.9 GWh |
#28 | Puna Geothermal Venture I | Pahoa, HI | 192.6 GWh |
#29 | Neal Hot Springs Geothermal Project | Vale, OR | 176.0 GWh |
#30 | Enel Cove Fort | Cove Fort, UT | 155.0 GWh |
#31 | Tuscarora Geothermal Power Plant | Tuscarora, NV | 125.8 GWh |
#32 | Don A Campbell 1 Geothermal | Gabbs, NV | 118.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Heber Geothermal.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Campo Verde Solar | El Centro, CA | 328.6 GWh | 12.4 mi |
Centinela Solar Energy | Calexico, CA | 491.6 GWh | 7.8 mi |
Drew Solar LLC | Calexico, CA | 307.2 GWh | 8.8 mi |
Drop 5 | Calexico, CA | 9.2 GWh | 7.9 mi |
East Highline | Holtville, CA | 3.0 GWh | 13.7 mi |
El Centro Hybrid | El Centro, CA | 1.1 TWh | 6.2 mi |
Heber Solar | Heber, CA | 25.5 GWh | 1.3 mi |
Imperial Solar Energy Center South | Calexico, CA | 277.2 GWh | 8.9 mi |
Imperial Solar Energy Center West | Seeley, CA | 388.3 GWh | 15.7 mi |
Imperial Valley Solar, LLC | Calexico, CA | 346.4 GWh | 5 mi |
IVC Solar | Imperial, CA | 3.7 GWh | 8.1 mi |
Mount Signal Solar Farm II | Calexico, CA | 413.1 GWh | 7.2 mi |
Mount Signal Solar Farm V | Calexico, CA | 610.3 GWh | 3.8 mi |
Ormesa III | Holtville, CA | 68.5 GWh | 15.4 mi |
Second Imperial Geothermal | Heber, CA | 326.6 GWh | 1 mi |
SEPV Imperial Dixieland East | Imperial, CA | 5.3 GWh | 15.8 mi |
Sol Orchard El Centro PV | El Centro, CA | 46.2 GWh | 6.3 mi |
Spreckels Sugar Company | Brawley, CA | 15.8 GWh | 13.9 mi |
Valencia 3 | Imperial, CA | 8.3 GWh | 11.9 mi |
Wistaria Ranch Solar | Calexico, CA | 297.0 GWh | 6.5 mi |