HEB00769
18611 Eastfield Drive, Webster, TX 77083Plant Summary Information
HEB00769 is ranked #262 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
HEB00769 is comprised of 3 generators and generated 63.7 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | HEB00769 |
---|---|
Utility Name | Texas Microgrid, LLC |
Location | Harris County, TX |
Initial Operation Date | November 2021 |
Last Update | Dec 2023 |
Annual Generation | 289.0 MWh |
Annual Consumption | 4.3 k MMBtu |
Ranked #11,195 out of 11,835 Power Plants Nationwide | |
Ranked #2,054 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #699 out of 749 Texas Power Plants | |
Ranked #262 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of HEB00769
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for HEB00769.
Monthly Net Generation for HEB00769
HEB00769 Details
Summary Information | |
---|---|
Plant Name | HEB00769 (67319) |
Plant Address | 18611 Eastfield Drive, Webster, TX 77083 |
Utility | Texas Microgrid, LLC (64449) |
Latitude, Longitude | 29.55391, -95.15068 |
Generation Dates on File | Jan 2023 to Dec 2023 |
Initial Operation Date | November 2021 |
Annual Generation | 289.0 MWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CENTERPOINT ENERGY |
Natural Gas Storage | No |
Generator H7691 Details Operating November 2021
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator H7692 Details Operating November 2021
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator H7693 Details Operating November 2021
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2021 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
HEB00769 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2044 | WAL5312 | Fort Worth, TX | 296.0 MWh |
#2045 | WAL6929 | Temple, TX | 296.0 MWh |
#2046 | WAL849 | Spring, TX | 293.0 MWh |
#2047 | WAL546 | Richmond, TX | 291.0 MWh |
#2048 | WAL3406 | Dallas, TX | 291.0 MWh |
#2049 | Lake Forest Hospital Central Energy Plant | Lake Forest, IL | 290.0 MWh |
#2050 | WAL194 | Baytown, TX | 290.0 MWh |
#2051 | HEB00292 | Bay City, TX | 290.0 MWh |
#2052 | HEB00594 | The Woodlands, TX | 290.0 MWh |
#2053 | WAL5080 | Hurst, TX | 289.0 MWh |
#2055 | LabCorp Engine | Raritan, NJ | 288.0 MWh |
#2056 | WAL772 | Houston, TX | 287.0 MWh |
#2057 | WAL947 | Sherman, TX | 287.0 MWh |
#2058 | WAL972 | Fort Worth, TX | 287.0 MWh |
#2059 | WAL1272 | Snyder, TX | 287.0 MWh |
#2060 | WAL3425 | Houston, TX | 287.0 MWh |
#2061 | WAL752 | Pasadena, TX | 283.0 MWh |
#2062 | WAL529 | La Marque, TX | 274.0 MWh |
#2063 | Hillsdale | Hillsdale, MI | 309.0 MWh |
#2064 | WAL3224 | Garland, TX | 268.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding HEB00769.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bacliff | Bacliff, TX | 126.9 GWh | 10.8 mi |
Bayou Cogen Plant | Pasadena, TX | 2.3 TWh | 7.9 mi |
Deer Park Energy Center | Deer Park, TX | 7.7 TWh | 11.1 mi |
Exelon LaPorte Generating Station | LaPorte, TX | 189.8 GWh | 11.3 mi |
HEB00028 | League City, TX | 338.0 MWh | 6.9 mi |
HEB00054 | Houston, TX | 220.0 MWh | 6.8 mi |
NASA Johnson Space Center CHP | Houston, TX | 84.5 GWh | 3.7 mi |
San Jacinto Steam Electric Station | La Porte, TX | 716.0 GWh | 11.8 mi |
Shell Deer Park | Deer Park, TX | 1.4 TWh | 11.8 mi |
Texas Petrochemicals | Houston, TX | 236.3 GWh | 11.8 mi |
WAL1062 | Friendswood, TX | 317.0 MWh | 0.5 mi |
WAL2724 | Pasadena, TX | 255.0 MWh | 10.3 mi |
WAL3298 | Kemah, TX | 298.0 MWh | 8 mi |
WAL3425 | Houston, TX | 287.0 MWh | 7.4 mi |
WAL3510 | Pearland, TX | 162.0 MWh | 5.2 mi |
WAL462 | Alvin, TX | 324.0 MWh | 10.3 mi |
WAL5116 | Deer Park, TX | 338.0 MWh | 8.2 mi |
WAL5388 | League City, TX | 315.0 MWh | 6.9 mi |
WAL752 | Pasadena, TX | 283.0 MWh | 6.4 mi |
WAL872 | Pearland, TX | 296.0 MWh | 8.1 mi |