HEB00095
1911 NE Bob Bullock Loop, Laredo, TX 78045Plant Summary Information
HEB00095 is ranked #192 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
HEB00095 is comprised of 4 generators and generated 95.2 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | HEB00095 |
---|---|
Utility Name | Texas Microgrid, LLC |
Location | Webb County, TX |
Initial Operation Date | September 2018 |
Last Update | Dec 2023 |
Annual Generation | 432.0 MWh |
Annual Consumption | 6.6 k MMBtu |
Ranked #11,082 out of 11,852 Power Plants Nationwide | |
Ranked #1,959 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #633 out of 754 Texas Power Plants | |
Ranked #192 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of HEB00095
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for HEB00095.
Monthly Net Generation for HEB00095
HEB00095 Details
Summary Information | |
---|---|
Plant Name | HEB00095 (66564) |
Plant Address | 1911 NE Bob Bullock Loop, Laredo, TX 78045 |
Utility | Texas Microgrid, LLC (64449) |
Latitude, Longitude | 27.60748, -99.47387 |
Generation Dates on File | Jan 2022 to Dec 2023 |
Initial Operation Date | September 2018 |
Annual Generation | 432.0 MWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | |
Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CENTERPOINT ENERGY ENTEX |
Natural Gas Storage | No |
Generator H0951 Details Operating September 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Unit Code | H095 |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator H0952 Details Operating September 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Unit Code | H095 |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator H0953 Details Operating September 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Unit Code | H095 |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator H0954 Details Operating September 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Unit Code | H095 |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
HEB00095 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1949 | Poplar Bluff Generating Station | Poplar Bluff, MO | 579.0 MWh |
#1950 | Transamerica Pyramid | San Francisco, CA | 525.0 MWh |
#1951 | West Coxsackie | Coxsackie, NY | 521.0 MWh |
#1952 | Tom G Smith | Lake Worth, FL | 444.0 MWh |
#1953 | Wellesley College Central Utility Plant | Wellesley, MA | 480.2 MWh |
#1954 | HEB00092 | Victoria, TX | 473.0 MWh |
#1955 | Northwest Community Hospital | Arlington Heights, IL | 467.0 MWh |
#1956 | Seadrift Coke LP | Port Lavaca, TX | 18.7 GWh |
#1957 | Hopewell Cogeneration NJ | Pennington, NJ | 433.0 MWh |
#1958 | Harbec Energy | Ontario, NY | 977.0 MWh |
#1960 | Stony Brook | Ludlow, MA | 25.0 GWh |
#1961 | HEB00063 | Pearland, TX | 429.0 MWh |
#1962 | St Clair | East China Twp, MI | 290.0 MWh |
#1963 | HEB00591 | Round Rock, TX | 425.0 MWh |
#1964 | HEB_CPS00085 | San Antonio, TX | 422.0 MWh |
#1965 | Hopewell Power Station | Hopewell, VA | 345.0 GWh |
#1966 | WAL791 | Alice, TX | 409.0 MWh |
#1967 | WAL5713 | Laredo, TX | 409.0 MWh |
#1968 | HEB00069 | Corpus Christi, TX | 407.0 MWh |
#1969 | WAL744 | Humble, TX | 404.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding HEB00095.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alexis Solar, LLC | Encino, TX | 17.4 GWh | 90.9 mi |
Cedro Hill Wind LLC | Bruni, TX | 451.1 GWh | 34.9 mi |
Corazon Energy LLC | Rachito Las Lomas, TX | 252.8 GWh | 13.3 mi |
Elara Solar | Pearsall, TX | 240.1 GWh | 90 mi |
Falcon Dam & Power | Falcon Heights, TX | 30.6 GWh | 75 mi |
Javelina Wind Energy II, LLC | MIRANDO, TX | 727.9 GWh | 36.4 mi |
Javelina Wind Energy, LLC | Mirando City, TX | 795.5 GWh | 35.2 mi |
Laredo | Laredo, TX | 42.1 GWh | 3.5 mi |
Las Lomas Wind Project | Falcon, TX | 516.0 GWh | 67.8 mi |
Mars Solar | Bruni, TX | 23.0 GWh | 41.2 mi |
Mesteno | Rio Grande City, TX | 411.4 GWh | 87.3 mi |
Reloj del Sol Wind Farm | San Ygnacio, TX | 222.5 GWh | 40.2 mi |
Rio Bravo Windpower, LLC | Roma, TX | 305.4 GWh | 71.4 mi |
Sendero | Hebbronville, TX | 272.5 GWh | 45.2 mi |
Shakes Solar | Carrizo Springs, TX | 397.8 GWh | 60.2 mi |
Torrecillas Wind Energy, LLC | Bruni, TX | 877.9 GWh | 41.6 mi |
WAL3518 | Laredo, TX | 393.0 MWh | 0.4 mi |
WAL5713 | Laredo, TX | 409.0 MWh | 0.7 mi |
WAL791 | Alice, TX | 409.0 MWh | 88.2 mi |
Whitetail | Oilton, TX | 166.7 GWh | 29.9 mi |