HEB00092
6106 N. Navarro, Victoria, TX 77901Plant Summary Information
HEB00092 is ranked #190 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
HEB00092 is comprised of 4 generators and generated 104.3 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | HEB00092 |
---|---|
Utility Name | Texas Microgrid, LLC |
Location | Victoria County, TX |
Initial Operation Date | January 2018 |
Last Update | Dec 2023 |
Annual Generation | 473.0 MWh |
Annual Consumption | 7.2 k MMBtu |
Ranked #11,039 out of 11,835 Power Plants Nationwide | |
Ranked #1,954 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #626 out of 749 Texas Power Plants | |
Ranked #190 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of HEB00092
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for HEB00092.
Monthly Net Generation for HEB00092
HEB00092 Details
Summary Information | |
---|---|
Plant Name | HEB00092 (66563) |
Plant Address | 6106 N. Navarro, Victoria, TX 77901 |
Utility | Texas Microgrid, LLC (64449) |
Latitude, Longitude | 28.85187, -96.99681 |
Generation Dates on File | Jan 2022 to Dec 2023 |
Initial Operation Date | January 2018 |
Annual Generation | 473.0 MWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | |
Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CENTERPOINT ENERGY ENTEX |
Natural Gas Storage | No |
Generator H0921 Details Operating January 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Unit Code | H092 |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator H0922 Details Operating January 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Unit Code | H092 |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator H0923 Details Operating January 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Unit Code | H092 |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator H0924 Details Operating January 2018
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Unit Code | H092 |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2018 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
HEB00092 Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1944 | Dover | Dover, OH | 78.0 GWh |
#1945 | J C McNeil | Burlington, VT | 155.5 GWh |
#1946 | Encina Water Pollution Control | Carlsbad, CA | 14.2 GWh |
#1947 | Lodi | Lodi, CA | 546.0 MWh |
#1948 | Cushing | Cushing, OK | 575.0 MWh |
#1949 | Poplar Bluff Generating Station | Poplar Bluff, MO | 579.0 MWh |
#1950 | Transamerica Pyramid | San Francisco, CA | 525.0 MWh |
#1951 | West Coxsackie | Coxsackie, NY | 521.0 MWh |
#1952 | Tom G Smith | Lake Worth, FL | 444.0 MWh |
#1953 | Wellesley College Central Utility Plant | Wellesley, MA | 480.2 MWh |
#1955 | Northwest Community Hospital | Arlington Heights, IL | 467.0 MWh |
#1956 | Seadrift Coke LP | Port Lavaca, TX | 18.7 GWh |
#1957 | Hopewell Cogeneration NJ | Pennington, NJ | 433.0 MWh |
#1958 | Harbec Energy | Ontario, NY | 977.0 MWh |
#1959 | HEB00095 | Laredo, TX | 432.0 MWh |
#1960 | Stony Brook | Ludlow, MA | 26.3 GWh |
#1961 | HEB00063 | Pearland, TX | 429.0 MWh |
#1962 | HEB00591 | Round Rock, TX | 425.0 MWh |
#1963 | St Clair | East China Twp, MI | 290.0 MWh |
#1964 | HEB_CPS00085 | San Antonio, TX | 422.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding HEB00092.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aktina Solar | El Campo, TX | 844.6 GWh | 47.4 mi |
Blackjack Creek Wind Farm | Skidmore, TX | 553.7 GWh | 54.8 mi |
CatanSolar | Runge, TX | 22.6 GWh | 42.4 mi |
CFB Power Plant | Point Comfort, TX | 929.9 GWh | 31 mi |
CG PS Victoria WWTP, LLC | Victoria, TX | 85.0 MWh | 4.1 mi |
Coleto Creek | Fannin, TX | 2.9 TWh | 16.3 mi |
Cranell Wind Farm LLC | TBD, TX | 577.6 GWh | 52.8 mi |
Formosa Utility Venture Ltd | Point Comfort, TX | 4.7 TWh | 29.7 mi |
Ganado Solar | Gail, TX | 288.0 GWh | 33.4 mi |
OTHERCitizensHospital | Victoria, TX | 823.0 MWh | 2.9 mi |
Port Comfort Power LLC | Point Comfort, TX | 70.8 GWh | 30.7 mi |
Sam Rayburn | Nursery, TX | 314.2 GWh | 8.9 mi |
Seadrift Coke LP | Port Lavaca, TX | 18.7 GWh | 26.4 mi |
Tres Bahias | Port Lavaca, TX | 284.6 GWh | 31.6 mi |
Tres City Power LLC | Victoria, TX | 43.4 GWh | 4.7 mi |
Tres Port Power, LLC | Victoria, TX | 56.4 GWh | 11.2 mi |
Union Carbide Seadrift Cogen | Seadrift, TX | 574.6 GWh | 27.3 mi |
Victoria | Victoria, TX | 974.1 GWh | 4.5 mi |
Victoria Port Power II LLC | Victoria, TX | 114.7 GWh | 11 mi |
Victoria Texas Plant | Victoria, TX | 411.2 GWh | 12.5 mi |