Heart of Texas Wind Project
2401 US 283, Brady, TX 76825Plant Summary Information
Heart of Texas Wind Project is ranked #83 out of 221 wind farms in Texas in terms of total annual net electricity generation.
Heart of Texas Wind Project generated 158.8 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Heart of Texas Wind Project |
---|---|
Utility Name | Scout Clean Energy LLC |
Location | McCulloch County, TX |
Initial Operation Date | May 2020 |
Last Update | Jan 2025 |
Annual Generation | 596.2 GWh |
Annual Consumption | 2.2 M MMBtu |
Ranked #1,123 out of 11,979 Power Plants Nationwide | |
Ranked #271 out of 1,359 Wind Power Plants Nationwide | |
Ranked #207 out of 774 Texas Power Plants | |
Ranked #83 out of 221 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Heart of Texas Wind, LLC (2016 to 2016) Scout Clean Energy LLC (2019 to 2023) |
Map of Heart of Texas Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Heart of Texas Wind Project.
Monthly Net Generation for Heart of Texas Wind Project
Heart of Texas Wind Project Details
Summary Information | |
---|---|
Plant Name | Heart of Texas Wind Project (61032) |
Plant Address | 2401 US 283, Brady, TX 76825 |
Utility | Scout Clean Energy LLC (63074) |
Latitude, Longitude | 31.24218, -99.42127 |
Generation Dates on File | May 2020 to Jan 2025 |
Initial Operation Date | May 2020 |
Annual Generation | 596.2 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator HTX Details Operating May 2020
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 180 MW |
Summer Capacity | 180 MW |
Winter Capacity | 180 MW |
Minimum Load | 180 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 64 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 64 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.82-127 |
Design Wind Speed | 19.2 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 291.9 |
Heart of Texas Wind Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#261 | Alta Farms II Wind Project, LLC | Clinton, IL | 602.7 GWh |
#262 | Limon Wind I | Limon, CO | 601.8 GWh |
#263 | Cedar Creek II | New Raymer, CO | 601.7 GWh |
#264 | Prairie Queen Wind Farm | Moran, KS | 600.5 GWh |
#265 | Merricourt Wind Energy Center | Kulm, ND | 599.9 GWh |
#266 | South Plains Wind Phase I | Floydada, TX | 599.7 GWh |
#267 | South Hurlburt Wind LLC | Arlington, OR | 599.6 GWh |
#268 | Castle Gap Wind | Goldthwaite, TX | 599.1 GWh |
#269 | Jumbo Hill Wind Project | Andrews, TX | 598.3 GWh |
#270 | Chevelon Butte Wind Farm | Winslow, AZ | 596.3 GWh |
#272 | Chapman Ranch Wind I | Corpus Christi, TX | 595.2 GWh |
#273 | Blue Cloud Wind Energy LLC | Sudan, TX | 595.2 GWh |
#274 | Pattern Panhandle Wind 2 LLC | Panhandle, TX | 595.1 GWh |
#275 | North Hurlburt Wind LLC | Arlington, OR | 594.8 GWh |
#276 | Wheatridge Hybrid | Morrow, OR | 714.7 GWh |
#277 | FPL Energy Story Wind LLC | Zearing, IA | 588.9 GWh |
#278 | FPL Energy Crystal Lake Wind LLC | Britt, IA | 588.6 GWh |
#279 | Logans Gap Wind LLC | Comanche, TX | 588.0 GWh |
#280 | Langford Wind Power | Christoval, TX | 587.5 GWh |
#281 | Astra Wind Farm | Happy, TX | 587.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Heart of Texas Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Angelo Solar | TX | 32.1 GWh | 70.8 mi |
BMP Wind (TX) | Baird, TX | 713.7 GWh | 72.8 mi |
Buchanan Dam (TX) | Buchanan Dam, TX | 14.1 GWh | 68.5 mi |
Cactus Flats Wind Energy Project | Eden, TX | 455.8 GWh | 37 mi |
Castle Gap Wind | Goldthwaite, TX | 599.1 GWh | 63.5 mi |
Concho Valley Solar, LLC | San Angelo, TX | 295.9 GWh | 49.3 mi |
Flat Top Wind I | Mullin, TX | 746.3 GWh | 57.1 mi |
Galloway 1 Solar Farm | Paint Rock, TX | 511.3 GWh | 25.9 mi |
Galloway 2 Solar Farm | Paint Rock, TX | 231.0 GWh | 31.7 mi |
Goldthwaite Wind Energy Facility | Goldthwaite, TX | 490.1 GWh | 57.2 mi |
Holstein 1 Solar Farm | Wingate, TX | 381.4 GWh | 73.8 mi |
Inks | Buchanan Dam, TX | 8.4 GWh | 70.8 mi |
IP Radian, LLC | Brookesmith, TX | 647.3 GWh | 25.2 mi |
Lampwick | Hext, TX | 12.3 GWh | 26.5 mi |
Live Oak Wind Project | Eldorado, TX | 752.7 GWh | 72.3 mi |
Logans Gap Wind LLC | Comanche, TX | 588.0 GWh | 58.8 mi |
Maverick Creek Wind | Eden, TX | 1.4 TWh | 25 mi |
Priddy Wind Project | Goldthwaite, TX | 968.4 GWh | 58.6 mi |
Rambler | San Angelo, TX | 440.9 GWh | 72.1 mi |
Rattlesnake Power, LLC | Brady, TX | 547.2 GWh | 11.2 mi |