Heart of Texas Wind Project
2401 US 283, Brady, TX 76825Plant Summary Information
Heart of Texas Wind Project is ranked #85 out of 218 wind farms in Texas in terms of total annual net electricity generation.
Heart of Texas Wind Project generated 101.3 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Heart of Texas Wind Project |
---|---|
Utility Name | Scout Clean Energy LLC |
Location | McCulloch County, TX |
Initial Operation Date | May 2020 |
Last Update | Sep 2024 |
Annual Generation | 586.8 GWh |
Annual Consumption | 2.2 M MMBtu |
Ranked #1,119 out of 11,852 Power Plants Nationwide | |
Ranked #263 out of 1,345 Wind Power Plants Nationwide | |
Ranked #207 out of 754 Texas Power Plants | |
Ranked #85 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Heart of Texas Wind, LLC (2016 to 2016) Scout Clean Energy LLC (2019 to 2023) |
Map of Heart of Texas Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Heart of Texas Wind Project.
Monthly Net Generation for Heart of Texas Wind Project
Heart of Texas Wind Project Details
Summary Information | |
---|---|
Plant Name | Heart of Texas Wind Project (61032) |
Plant Address | 2401 US 283, Brady, TX 76825 |
Utility | Scout Clean Energy LLC (63074) |
Latitude, Longitude | 31.24218, -99.42127 |
Generation Dates on File | May 2020 to Sep 2024 |
Initial Operation Date | May 2020 |
Annual Generation | 586.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator HTX Details Operating May 2020
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 180 MW |
Summer Capacity | 180 MW |
Winter Capacity | 180 MW |
Minimum Load | 180 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 64 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 64 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 2.82-127 |
Design Wind Speed | 19.2 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 291.9 |
Heart of Texas Wind Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#253 | Pattern Panhandle Wind 2 LLC | Panhandle, TX | 595.1 GWh |
#254 | Astra Wind Farm | Happy, TX | 594.3 GWh |
#255 | Limestone Wind Project | Coolidge, TX | 594.3 GWh |
#256 | Solano Wind | Rio Vista, CA | 592.9 GWh |
#257 | Golden Hill Wind | Wasco, OR | 590.4 GWh |
#258 | Cedar Springs II | Douglas, WY | 590.0 GWh |
#259 | Jumbo Hill Wind Project | Andrews, TX | 589.0 GWh |
#260 | Wild Horse | Ellensburg, WA | 589.0 GWh |
#261 | Langford Wind Power | Christoval, TX | 587.5 GWh |
#262 | Prairie Wind Farm | Montezuma, IA | 587.3 GWh |
#264 | Kings Point Wind Energy Center | Golden City, MO | 585.4 GWh |
#265 | Carousel Wind Farm LLC | Burlington, CO | 583.9 GWh |
#266 | Castle Gap Wind | Goldthwaite, TX | 583.4 GWh |
#267 | Border Winds Wind Farm | Rolla, ND | 583.3 GWh |
#268 | Limon Wind I | Limon, CO | 582.1 GWh |
#269 | English Farms | Montezuma, IA | 581.3 GWh |
#270 | Minonk Wind Farm | Minonk, IL | 580.4 GWh |
#271 | Horseshoe Bend Wind LLC | Arlington, OR | 579.6 GWh |
#272 | South Hurlburt Wind LLC | Arlington, OR | 579.2 GWh |
#273 | Cranell Wind Farm LLC | TBD, TX | 578.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Heart of Texas Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
BMP Wind (TX) | Baird, TX | 626.9 GWh | 72.8 mi |
Buchanan Dam (TX) | Buchanan Dam, TX | 14.1 GWh | 68.5 mi |
Cactus Flats Wind Energy Project | Eden, TX | 428.2 GWh | 37 mi |
Castle Gap Wind | Goldthwaite, TX | 583.4 GWh | 63.5 mi |
Concho Valley Solar, LLC | San Angelo, TX | 295.9 GWh | 49.3 mi |
Flat Top Wind I | Mullin, TX | 786.7 GWh | 57.1 mi |
Galloway 1 Solar Farm | Paint Rock, TX | 495.7 GWh | 25.9 mi |
Galloway 2 Solar Farm | Paint Rock, TX | 230.9 GWh | 31.7 mi |
Goldthwaite Wind Energy Facility | Goldthwaite, TX | 490.1 GWh | 57.2 mi |
Holstein 1 Solar Farm | Wingate, TX | 387.2 GWh | 73.8 mi |
Inks | Buchanan Dam, TX | 8.4 GWh | 70.8 mi |
IP Radian, LLC | Brookesmith, TX | 681.1 GWh | 25.2 mi |
Lampwick | Hext, TX | 12.3 GWh | 26.5 mi |
Langford Wind Power | Christoval, TX | 587.5 GWh | 75.1 mi |
Live Oak Wind Project | Eldorado, TX | 729.6 GWh | 72.3 mi |
Logans Gap Wind LLC | Comanche, TX | 613.6 GWh | 58.8 mi |
Maverick Creek Wind | Eden, TX | 1.3 TWh | 25 mi |
Priddy Wind Project | Goldthwaite, TX | 944.0 GWh | 58.6 mi |
Rambler | San Angelo, TX | 438.7 GWh | 72.1 mi |
Rattlesnake Power, LLC | Brady, TX | 541.8 GWh | 11.2 mi |