Headwaters Wind Farm II LLC
7680 S 1200W, Losanville, IN 47354Plant Summary Information
Headwaters Wind Farm II LLC is ranked #29 out of 198 power plants in Indiana in terms of total annual net electricity generation.
Headwaters Wind Farm II LLC generated 80.6 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Headwaters Wind Farm II LLC |
---|---|
Utility Name | EDP Renewables North America LLC |
Location | Randolph County, IN |
Initial Operation Date | June 2021 |
Last Update | Aug 2024 |
Annual Generation | 533.6 GWh |
Annual Consumption | 1.9 M MMBtu |
Ranked #1,233 out of 11,835 Power Plants Nationwide | |
Ranked #325 out of 1,343 Wind Power Plants Nationwide | |
Ranked #29 out of 198 Indiana Power Plants | |
Ranked #7 out of 18 Indiana Wind Power Plants | |
Fuel Types | Wind |
Map of Headwaters Wind Farm II LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Headwaters Wind Farm II LLC.
Monthly Net Generation for Headwaters Wind Farm II LLC
Headwaters Wind Farm II LLC Details
Summary Information | |
---|---|
Plant Name | Headwaters Wind Farm II LLC (62592) |
Plant Address | 7680 S 1200W, Losanville, IN 47354 |
Utility | EDP Renewables North America LLC (61785) |
Latitude, Longitude | 40.05169, -85.20669 |
Generation Dates on File | Jul 2021 to Aug 2024 |
Initial Operation Date | June 2021 |
Annual Generation | 533.6 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Indiana Michigan Power Co (9324) IN |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator HWII Details Operating June 2021
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Minimum Load | 12 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 52 |
Turbine Details | |
Number Of Turbines | 52 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V150-4.2 |
Design Wind Speed | 12 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 244.4 |
Headwaters Wind Farm II LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#315 | Green River Wind Farm | Deer Grove, IL | 540.4 GWh |
#316 | Oso Grande Wind Farm | Maljamar, NM | 540.3 GWh |
#317 | Lindahl Wind Project, LLC | Tioga, ND | 539.8 GWh |
#318 | Cedar Springs III | Douglas, WY | 539.4 GWh |
#319 | Ocotillo Express LLC | Ocotillo, CA | 539.0 GWh |
#320 | Grant Wind, LLC | Medford, OK | 538.6 GWh |
#321 | Walnut Wind Farm | Walnut, IA | 538.1 GWh |
#322 | High Trail Wind Farm LLC | Ellsworth, IL | 537.3 GWh |
#323 | Trent Wind Farm | Trent, TX | 535.5 GWh |
#324 | Sherbino II | Ft. Stockton, TX | 533.6 GWh |
#326 | New Mexico Wind Energy Center | House, NM | 531.8 GWh |
#327 | Intrepid | Schaller, IA | 531.4 GWh |
#328 | Kossuth | Lu Verne, IA | 531.3 GWh |
#329 | Mountain Breeze Wind, LLC | Grover, CO | 530.5 GWh |
#330 | NedPower Mount Storm | Mount Storm, WV | 530.2 GWh |
#331 | Fluvanna | Fluvanna, TX | 528.5 GWh |
#332 | Las Lomas Wind Project | Falcon, TX | 528.1 GWh |
#333 | Elk City LLC | Sweetwater, OK | 524.2 GWh |
#334 | Frontier Windpower | Newkirk, OK | 523.2 GWh |
#335 | Richland | Odebolt, IA | 521.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Headwaters Wind Farm II LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Anderson 3 | Anderson, IN | 16.6 GWh | 23.1 mi |
Anderson 4 | Anderson, IN | 15.0 GWh | 22.8 mi |
Anderson 5 | Anderson, IN | 6.0 GWh | 22.6 mi |
Bellflower Solar 1 | Lewisville, IN | 258.9 GWh | 21.4 mi |
Bitter Ridge Wind Farm, LLC | Redkey, IN | 351.9 GWh | 21.9 mi |
Bluff Point Wind Facility | Portland, IN | 358.7 GWh | 22.1 mi |
Centerville Solar Park | Centerville, IN | 2.0 GWh | 18.8 mi |
Headwaters Wind Farm LLC | Winchester, IN | 622.9 GWh | 10.3 mi |
Henry County | New Castle, IN | 243.9 GWh | 17.1 mi |
IMPA Knightstown Solar Park | Knightstown, IN | 207.0 MWh | 23.8 mi |
IMPA Middletown Solar Park | Middletown, IN | 663.0 MWh | 17.5 mi |
IMPA Richmond Solar Park | Richmond, IN | 770.0 MWh | 23.9 mi |
IMPA Richmond Solar Park 7 | Richmond, IN | 986.0 MWh | 21.1 mi |
Jay County LFGTE | Portland, IN | 17.0 GWh | 23.5 mi |
New Castle Solar RES | New Castle, IN | 1.3 GWh | 17.2 mi |
Richmond | Centerville, IN | 13.6 GWh | 19.4 mi |
Richmond 6 | Richmond, IN | 3.3 GWh | 24.3 mi |
Richmond Solar Park 4 | Richmond, IN | 12.9 GWh | 19.6 mi |
Riverstart Solar Park LLC | Modoc, IN | 386.0 GWh | 8.6 mi |
Whitewater Valley | RICHMOND, IN | 16.3 GWh | 23.8 mi |