Haynes
6801 E. 2nd St., Long Beach, CA 90803Plant Summary Information
Haynes is ranked #16 out of 1,570 power plants in California in terms of total annual net electricity generation.
Haynes is comprised of 11 generators and generated 957.6 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Haynes |
---|---|
Utility Name | Los Angeles Department of Water & Power |
Location | Los Angeles County, CA |
Initial Operation Date | September 1962 |
Last Update | Sep 2024 |
Annual Generation | 2.6 TWh |
Annual Consumption | 21.5 M MMBtu |
Ranked #444 out of 11,852 Power Plants Nationwide | |
Ranked #270 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #16 out of 1,570 California Power Plants | |
Ranked #14 out of 346 California Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Haynes
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Haynes.
Monthly Net Generation for Haynes
Haynes Details
Summary Information | |
---|---|
Plant Name | Haynes (400) |
Plant Address | 6801 E. 2nd St., Long Beach, CA 90803 |
Utility | Los Angeles Department of Water & Power (11208) |
Latitude, Longitude | 33.76474, -118.09913 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | September 1962 |
Annual Generation | 2.6 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Pacific Ocean |
Ash Impoundment | No |
Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | SOUTHERN CALIFORNIA GAS COMPANY |
Natural Gas Storage | No |
Generator 1 Details Operating September 1962
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | none |
RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
Nameplate Capacity | 230 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 222 MW |
Winter Capacity | 222 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1962 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating April 1963
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | none |
RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
Nameplate Capacity | 230 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 222 MW |
Winter Capacity | 222 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 1963 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 10 Details Operating January 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | none |
RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
Nameplate Capacity | 182.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 162.5 MW |
Winter Capacity | 162.5 MW |
Minimum Load | 105 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 162.5 MW |
Net Winter Capacity With Natural Gas | 155 MW |
Net Summer Capacity With Oil | 162.5 MW |
Net Winter Capacity With Oil | 155 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 8 Details Operating January 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | none |
RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
Nameplate Capacity | 264.3 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 235 MW |
Winter Capacity | 250 MW |
Minimum Load | 73 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|
Generator 9 Details Operating January 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | none |
RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
Nameplate Capacity | 182.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 162.5 MW |
Winter Capacity | 162.5 MW |
Minimum Load | 105 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 162.5 MW |
Net Winter Capacity With Natural Gas | 155 MW |
Net Summer Capacity With Oil | 162.5 MW |
Net Winter Capacity With Oil | 155 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 11 Details Operating June 2013
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | none |
RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
Nameplate Capacity | 108.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 99.2 MW |
Winter Capacity | 99.2 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2013 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 12 Details Operating June 2013
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | none |
RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
Nameplate Capacity | 108.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 99.2 MW |
Winter Capacity | 99.2 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2013 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 13 Details Operating June 2013
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | none |
RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
Nameplate Capacity | 108.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 99.2 MW |
Winter Capacity | 99.2 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2013 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 14 Details Operating June 2013
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | none |
RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
Nameplate Capacity | 108.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 99.2 MW |
Winter Capacity | 99.2 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2013 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 15 Details Operating June 2013
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | none |
RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
Nameplate Capacity | 108.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 99.2 MW |
Winter Capacity | 99.2 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2013 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 16 Details Operating June 2013
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | none |
RTO ISO Location Designation For Reporting Wholesale Sales Data | none |
Nameplate Capacity | 108.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 99.2 MW |
Winter Capacity | 99.2 MW |
Minimum Load | 52 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2013 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Haynes Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#260 | Seminole | Konowa, OK | 2.6 TWh |
#261 | Mankato Energy Center | Mankato, MN | 2.6 TWh |
#262 | Red Oak Power LLC | Sayreville, NJ | 2.6 TWh |
#263 | Rocky Mountain Energy Center | Keenesburg, CO | 2.6 TWh |
#264 | Sunrise Power LLC | Fellows, CA | 2.6 TWh |
#265 | Gila River Power Block 3 | Gila Bend, AZ | 2.6 TWh |
#266 | Osprey Energy Center Power Plant | Auburndale, FL | 2.6 TWh |
#267 | AES Alamitos Energy Center | Long Beach, CA | 2.6 TWh |
#268 | AES Huntington Beach Energy Project | Huntington Beach, CA | 2.6 TWh |
#269 | Riverside (MN) | Minneapolis, MN | 2.6 TWh |
#271 | Corpus Christi Energy Center | Corpus Christi, TX | 2.6 TWh |
#272 | State Line Combined Cycle | Joplin, MO | 2.6 TWh |
#273 | ExxonMobil Baytown Turbine | Baytown, TX | 2.5 TWh |
#274 | Otay Mesa Generating Project | San Diego, CA | 2.5 TWh |
#275 | ANP Bellingham Energy Project | Bellingham, MA | 2.5 TWh |
#276 | Oyster Creek Unit VIII | Freeport, TX | 2.5 TWh |
#277 | Harry Allen | Las Vegas, NV | 2.5 TWh |
#278 | La Paloma Generating Plant | McKittrick, CA | 2.5 TWh |
#279 | Magic Valley Generating Station | Edinburg, TX | 2.5 TWh |
#280 | C D McIntosh Jr | Lakeland, FL | 2.5 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Haynes.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AES Alamitos Energy Center | Long Beach, CA | 2.6 TWh | 0.2 mi |
AES Alamitos LLC | Long Beach, CA | 167.2 GWh | 0.3 mi |
Barre Peaker | Stanton, CA | 21.5 GWh | 7.3 mi |
BCE Los Alamitos 1 | Los Alamitos, CA | 3.6 GWh | 2.7 mi |
BCE Los Alamitos 2 | Los Alamitos, CA | 3.4 GWh | 3.1 mi |
Colon PV | Wilmington, CA | 1.4 GWh | 9 mi |
CSU Long Beach Lots 7 & 14 | Long Beach, CA | 6.9 GWh | 1.4 mi |
Dominguez Plant | Long Beach, CA | 13.7 GWh | 9.5 mi |
Equilon Los Angeles Refining | Wilmington, CA | 317.3 GWh | 8 mi |
Harbor Cogen | Wilmington, CA | 25.6 GWh | 7.6 mi |
Long Beach Generation LLC | Long Beach, CA | 10.1 GWh | 7.2 mi |
Signal Hill West Unit | Signal Hill, CA | 35.7 GWh | 5.4 mi |
Southeast Resource Recovery | Long Beach, CA | 89.9 GWh | 8.1 mi |
Stanton Energy Reliability Center Hybrid | Stanton, CA | 1.8 GWh | 7.1 mi |
Staples La Mirada, CA | La Mirada, CA | 1.5 GWh | 9.3 mi |
THUMS | Long Beach, CA | 346.3 GWh | 6.6 mi |
Toyota Long Beach Trigen | Long Beach, CA | 5.1 GWh | 7.2 mi |
Valero Wilmington Cogeneration Plant | Wilmington, CA | 236.7 GWh | 8.1 mi |
Watson Cogeneration | Carson, CA | 2.4 TWh | 9.1 mi |
Wilmington Hydrogen Plant | Wilmington, CA | 180.4 GWh | 8.2 mi |