Harvest Wind Project is ranked #18 out of 23 wind farms in Washington in terms of total annual net electricity generation.
Harvest Wind Project generated 39.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Harvest Wind Project |
---|---|
Utility Name | Harvest Wind Project TIC |
Location | Klickitat County, WA |
Initial Operation Date | December 2009 |
Last Update | Dec 2023 |
Annual Generation | 216.8 GWh |
Annual Consumption | 791.9 k MMBtu |
Ranked #2,211 out of 11,835 Power Plants Nationwide | |
Ranked #675 out of 1,343 Wind Power Plants Nationwide | |
Ranked #63 out of 134 Washington Power Plants | |
Ranked #18 out of 23 Washington Wind Power Plants | |
Fuel Types | Wind |
Map of Harvest Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Harvest Wind Project.
Monthly Net Generation for Harvest Wind Project
Harvest Wind Project Details
Summary Information | |
---|---|
Plant Name | Harvest Wind Project (57152) |
Plant Address | 1135 Dot Rd, Roosevelt, WA 99356 |
Utility | Harvest Wind Project TIC (56499) |
Latitude, Longitude | 45.8131, -120.3475 |
Generation Dates on File | Dec 2009 to Dec 2023 |
Initial Operation Date | December 2009 |
Annual Generation | 216.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | PUD No 1 of Klickitat County (10393) WA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator HWP1 Details Operating December 2009
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 98.9 MW |
Summer Capacity | 98.9 MW |
Winter Capacity | 98.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2009 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
---|---|
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 43 |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Turbine Details | |
Number Of Turbines | 43 |
---|---|
Predominant Turbine Manufacturer | Siemens |
Predominant Turbine Model Number | SWT-2.3-93 |
Design Wind Speed | 17.6 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 260 |
Harvest Wind Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#665 | Lake Benton I | Lake Benton, MN | 223.1 GWh |
#666 | Wessington Springs | Wessington Springs, SD | 221.8 GWh |
#667 | Stony Creek Wind Farm NY | Strykersville, NY | 221.7 GWh |
#668 | San Roman Wind I, LLC | Los Fresnos, TX | 220.9 GWh |
#669 | Brookfield Tehachapi 1 | Mojave, CA | 220.4 GWh |
#670 | NaturEner Glacier Wind Energy 1 | Ethridge, MT | 219.6 GWh |
#671 | Rockland Wind Farm | American Falls, ID | 219.4 GWh |
#672 | Twin Buttes Wind Project | Lamar, CO | 219.0 GWh |
#673 | Independence Wind Farm | Manchester, IA | 217.9 GWh |
#674 | Wapsipinicon Wind Project | Dexter, MN | 217.0 GWh |
#676 | Vasco Winds | Livermore, CA | 216.0 GWh |
#677 | Foote Creek I | McFadden, WY | 215.5 GWh |
#678 | Cassadaga Wind Farm | Cherry Creek, NY | 215.0 GWh |
#679 | Marshall Wind Farm | Frankfort, KS | 213.7 GWh |
#680 | Rising Tree Wind Farm | Mojave, CA | 213.4 GWh |
#681 | Spearville | Ford, KS | 208.9 GWh |
#682 | Elm Creek Wind LLC | Trimont, MN | 208.9 GWh |
#683 | Hoosier Wind Project LLC | Goodland, IN | 207.8 GWh |
#684 | Fairbanks Wind Park | Garden, MI | 207.5 GWh |
#685 | Reloj del Sol Wind Farm | San Ygnacio, TX | 207.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Harvest Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arlington Wind Power Project | Arlington, OR | 177.8 GWh | 9.7 mi |
Big Horn Wind II | Bickleton, WA | 111.0 GWh | 7.6 mi |
Big Horn Wind Project | Bickelton, WA | 477.7 GWh | 5.9 mi |
Biglow Canyon Wind Farm | Wasco, OR | 926.4 GWh | 16.5 mi |
Goodnoe Hills | Goldendale, WA | 223.9 GWh | 8.6 mi |
John Day | Rufus, OR | 6.9 TWh | 18 mi |
Juniper Canyon I Wind Project | Bickleton, WA | 263.0 GWh | 9.2 mi |
Klondike Windpower III | Wasco, OR | 681.0 GWh | 17.6 mi |
Leaning Juniper | Arlington, OR | 254.7 GWh | 12.9 mi |
Leaning Juniper Wind Power II | Arlington, OR | 378.1 GWh | 12 mi |
Lund Hill Solar | Bickleton, WA | 342.2 GWh | 5.2 mi |
Montague Wind Power Facility LLC | Arlington, OR | 485.7 GWh | 20 mi |
North Hurlburt Wind LLC | Arlington, OR | 574.5 GWh | 13.9 mi |
PaTu Wind Farm LLC | Wasco, OR | 25.5 GWh | 19 mi |
Pebble Springs Wind LLC | Wasco, OR | 190.5 GWh | 12.8 mi |
South Hurlburt Wind LLC | Arlington, OR | 583.7 GWh | 14.9 mi |
Waste Management Columbia Ridge LFGTE | Arlington, OR | 81.0 GWh | 16.7 mi |
Wheat Field Wind Power Project | Arlington, OR | 190.8 GWh | 9.6 mi |
White Creek Wind Farm | Roosevelt, WA | 446.8 GWh | 0.3 mi |
WyEast Solar | Wasco, OR | 19.6 GWh | 19.9 mi |