Harvest 2
250 N Maxwell Road, Elkton, MI 48731Plant Summary Information
Harvest 2 is ranked #24 out of 36 wind farms in Michigan in terms of total annual net electricity generation.
Harvest 2 generated 55.9 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Harvest 2 |
---|---|
Utility Name | Harvest II Windfarm, LLC |
Location | Huron County, MI |
Initial Operation Date | November 2012 |
Last Update | Dec 2023 |
Annual Generation | 180.2 GWh |
Annual Consumption | 687.9 k MMBtu |
Ranked #2,427 out of 11,835 Power Plants Nationwide | |
Ranked #738 out of 1,343 Wind Power Plants Nationwide | |
Ranked #58 out of 255 Michigan Power Plants | |
Ranked #24 out of 36 Michigan Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Harvest II Windfarm LLC (2013 to 2015) Harvest II Windfarm, LLC (2016 to 2023) |
Map of Harvest 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Harvest 2.
Monthly Net Generation for Harvest 2
Harvest 2 Details
Summary Information | |
---|---|
Plant Name | Harvest 2 (57888) |
Plant Address | 250 N Maxwell Road, Elkton, MI 48731 |
Utility | Harvest II Windfarm, LLC (57256) |
Latitude, Longitude | 43.8556, -83.1669 |
Generation Dates on File | Nov 2012 to Dec 2023 |
Initial Operation Date | November 2012 |
Annual Generation | 180.2 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 12-522-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | ITC Interconnection LLC (60744) |
Grid Voltage | 120.00 kV |
Energy Storage | No |
Generator 1 Details Operating November 2012
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | DECO.EXGNHW2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | DECO.EXGNHW2 |
Nameplate Capacity | 59.4 MW |
Summer Capacity | 59.4 MW |
Winter Capacity | 59.4 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 33 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 33 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V100-1.8 |
Design Wind Speed | 14.3 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 311.7 |
Harvest 2 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#728 | Alta Wind VIII | Mojave, CA | 186.4 GWh |
#729 | Silver Star I Wind Power Project | Dublin, TX | 186.1 GWh |
#730 | Cohocton Wind Project | Cohocton, NY | 185.4 GWh |
#731 | High Sheldon Wind Farm | Strykersville, NY | 184.0 GWh |
#732 | Pinnacle Wind Force LLC | Keyser, WV | 184.0 GWh |
#733 | Peak View Wind Farm | Walsenburg, CO | 183.4 GWh |
#734 | Beebe 1A | Ithaca, MI | 182.9 GWh |
#735 | Los Vientos Wind 1B | Sebastian, TX | 182.1 GWh |
#736 | Bison I Wind Energy Center | New Salem, ND | 181.7 GWh |
#737 | Majestic II Wind | Panhandle, TX | 180.7 GWh |
#739 | FPL Energy Oliver Wind II LLC | Center, ND | 179.9 GWh |
#740 | Busch Ranch II Wind Farm | Walsenburg, CO | 179.7 GWh |
#741 | Strauss Wind Farm | Lompoc, CA | 179.6 GWh |
#742 | Green Pastures Wind II | Seymour, TX | 178.7 GWh |
#743 | Arlington Wind Power Project | Arlington, OR | 177.8 GWh |
#744 | Painted Hills Wind Park | Whitewater, CA | 177.6 GWh |
#745 | Cerro Gordo Wind Farm | Union, IA | 176.4 GWh |
#746 | San Juan Mesa Wind Project LLC | Elida, NM | 176.3 GWh |
#747 | Granite Reliable Power | Dummer, NH | 176.0 GWh |
#748 | Wethersfield | Gainsville, NY | 176.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Harvest 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apple Blossom Wind Farm | Pigeon, MI | 234.5 GWh | 7.9 mi |
Big Turtle Wind Farm 2 | Harbor Beach, MI | 62.1 GWh | 19.1 mi |
Big Turtle Wind Farm, LLC | Harbor Beach, MI | 66.1 GWh | 19.2 mi |
Brookfield | Pigeon, MI | 231.6 GWh | 9.4 mi |
Caro | Caro, MI | 5.9 MWh | 28.1 mi |
Cross Winds Energy Park | Unionville, MI | 669.5 GWh | 23.2 mi |
Deerfield Wind Energy 2 | Port Hope, MI | 291.8 GWh | 15.5 mi |
Deerfield Wind Energy, LLC | Kinde, MI | 497.7 GWh | 14.6 mi |
Echo Wind Park | Elkton, MI | 444.2 GWh | 1.9 mi |
Harvest | Elkton, MI | 101.9 GWh | 2.6 mi |
Main Street (MI) | Sebewaing, MI | 1.0 MWh | 16.6 mi |
McKinley Wind Park | Pigeon, MI | 49.0 GWh | 3.9 mi |
Michigan Wind 1 | Ubly, MI | 131.9 GWh | 14.3 mi |
Michigan Wind 2 | Minden City, MI | 303.9 GWh | 24.8 mi |
Minden Wind Park | Minden City, MI | 107.2 GWh | 24.1 mi |
MSC Sebewaing | Sebewaing, MI | 611.6 MWh | 16.1 mi |
Pheasant Run Wind LLC | Pigeon, MI | 234.8 GWh | 9.4 mi |
Pine Street | Sebewaing, MI | 25.4 GWh | 16.2 mi |
Sigel Wind Park | Harbor Beach, MI | 236.3 GWh | 19.1 mi |
Ubly | Ubly, MI | 16.7 MWh | 14.7 mi |