Hartwell Lake
6961 Anderson Highway, Hartwell, GA 30643Plant Summary Information
Hartwell Lake is ranked #28 out of 238 power plants in Georgia in terms of total annual net electricity generation.
Hartwell Lake is comprised of 5 generators and generated 54.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Hartwell Lake |
---|---|
Utility Name | USCE-Savannah District |
Location | Hart County, GA |
Initial Operation Date | April 1962 |
Last Update | Dec 2023 |
Annual Generation | 378.9 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #1,563 out of 11,835 Power Plants Nationwide | |
Ranked #122 out of 1,371 Water Power Plants Nationwide | |
Ranked #28 out of 238 Georgia Power Plants | |
Ranked #2 out of 27 Georgia Water Power Plants | |
Fuel Types | Water |
Map of Hartwell Lake
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Hartwell Lake.
Monthly Net Generation for Hartwell Lake
Hartwell Lake Details
Summary Information | |
---|---|
Plant Name | Hartwell Lake (754) |
Plant Address | 6961 Anderson Highway, Hartwell, GA 30643 |
Utility | USCE-Savannah District (19375) |
Latitude, Longitude | 34.3564, -82.8219 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | April 1962 |
Annual Generation | 378.9 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Southeastern Power Administration (SEPA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Savannah River |
Ash Impoundment | No |
Transmission / Distribution Owner | Georgia Power Co (7140) GA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating April 1962
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 85 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 85 MW |
Winter Capacity | 85 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 1962 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 2 Details Operating April 1962
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 85 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 85 MW |
Winter Capacity | 85 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 1962 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 3 Details Out of Service April 1962
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 85 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 85 MW |
Winter Capacity | 85 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
---|---|
First Operation Date | April 1962 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 4 Details Operating April 1962
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 85 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 70 MW |
Winter Capacity | 70 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 1962 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 5 Details Operating November 1983
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 80 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 80 MW |
Winter Capacity | 80 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 1983 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Hartwell Lake Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#112 | Bartletts Ferry | Salem, AL | 397.0 GWh |
#113 | Thompson Falls | Thompson Falls, MT | 396.3 GWh |
#114 | Bradley Lake | Homer, AK | 395.1 GWh |
#115 | Rainbow (MT) | Great Falls, MT | 394.9 GWh |
#116 | Markland | Florence, IN | 394.7 GWh |
#117 | Cabot | Montague, MA | 394.4 GWh |
#118 | Big Creek 1 | Big Creek, CA | 393.8 GWh |
#119 | Curtis Palmer Hydroelectric | Corinth, NY | 393.2 GWh |
#120 | Box Canyon | Ione, WA | 383.5 GWh |
#121 | Parker Dam | Parker, CA | 379.9 GWh |
#123 | Smithland Hydroelectric Plant | Smithland, KY | 378.8 GWh |
#124 | C J Strike | Bruneau, ID | 377.1 GWh |
#125 | Keswick | Redding, CA | 373.0 GWh |
#126 | Pit 5 | Big Bend, CA | 370.1 GWh |
#127 | Old Hickory | Hendersonville, TN | 368.7 GWh |
#128 | James B Black | Big Bend, CA | 367.0 GWh |
#129 | Douglas Dam | Dandridge, TN | 364.9 GWh |
#130 | Kerckhoff 2 | Auberry, CA | 357.0 GWh |
#131 | Trinity | Weaverville, CA | 356.3 GWh |
#132 | Electra | Jackson, CA | 354.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Hartwell Lake.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adams | Piedmont, SC | 4.5 GWh | 28.8 mi |
Anderson (SC) | Anderson, SC | 4.0 GWh | 12.6 mi |
Bluebird Solar SC LLC | Pendleton, SC | 6.6 GWh | 17.4 mi |
Central Energy Facility | Clemson, SC | 1.0 MWh | 22.3 mi |
Comer Solar | Comer, GA | 3.8 GWh | 25.8 mi |
Duke Energy CHP at Clemson University | Clemson, SC | 108.5 GWh | 22.2 mi |
Franklin Milliken | Lavonia, GA | 6.6 GWh | 16.9 mi |
Hartwell Energy Facility | Hartwell, GA | 207.1 GWh | 1.2 mi |
Hollidays Bridge Hydro | Honea Path, SC | 9.3 GWh | 28.1 mi |
Honea Path | Honea Path, SC | 66.0 MWh | 26.7 mi |
John S Rainey | Starr, SC | 4.0 TWh | 2.8 mi |
Pelzer Lower | Williamston, SC | 4.6 GWh | 27.9 mi |
Pelzer Solar I | Pelzer, SC | 2.0 GWh | 27.7 mi |
Pelzer Upper | Petzer, SC | 4.6 GWh | 28.8 mi |
Richard B Russell | Elberton, GA | 330.5 GWh | 26.3 mi |
Rocky River (SC) | Iva, SC | 5.6 GWh | 13.9 mi |
Seneca City of | Seneca, SC | 1.0 GWh | 24.1 mi |
Sonny Solar LLC | Elberton, GA | 82.4 GWh | 21.8 mi |
Valenite | Westminster, SC | 30.0 MWh | 24.2 mi |
W S Lee | Williamston, SC | 5.9 TWh | 27.8 mi |