Harry Allen Solar Energy LLC
10500 US Hwy 93, Apex, NV 98191Plant Summary Information
Harry Allen Solar Energy LLC is ranked #34 out of 109 power plants in Nevada in terms of total annual net electricity generation.
Harry Allen Solar Energy LLC generated 98.3 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Harry Allen Solar Energy LLC |
---|---|
Utility Name | Invenergy Services LLC |
Location | Clark County, NV |
Initial Operation Date | May 2021 |
Last Update | Aug 2024 |
Annual Generation | 287.9 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,875 out of 11,835 Power Plants Nationwide | |
Ranked #168 out of 5,643 Solar Power Plants Nationwide | |
Ranked #34 out of 109 Nevada Power Plants | |
Ranked #13 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Invenergy Services LLC (2019 to 2023) AEP Renewables (2021 to 2022) |
Map of Harry Allen Solar Energy LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Harry Allen Solar Energy LLC.
Monthly Net Generation for Harry Allen Solar Energy LLC
Harry Allen Solar Energy LLC Details
Summary Information | |
---|---|
Plant Name | Harry Allen Solar Energy LLC (63080) |
Plant Address | 10500 US Hwy 93, Apex, NV 98191 |
Utility | Invenergy Services LLC (49893) |
Latitude, Longitude | 36.43395, -114.9471 |
Generation Dates on File | May 2021 to Aug 2024 |
Initial Operation Date | May 2021 |
Annual Generation | 287.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Nevada Power Co (13407) NV |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating May 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Jointly Owned |
Nameplate Capacity | 100 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 123.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Harry Allen Solar Energy LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
AEP Renewables | 155 W. Nationwide Suite 400, Columbus, OH 43215 | 75.00% |
Dry Lake Solar Holdings LLC | One South Wacker Drive, Suite 1800, Chicago, IL 60606 | 25.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#158 | Panoche Valley Solar Farm | Paicines, CA | 298.3 GWh |
#159 | Victory Pass | Desert Center, CA | 296.2 GWh |
#160 | Hudson - High Desert Hybrid | Victorville, CA | 288.5 GWh |
#161 | Wistaria Ranch Solar | Calexico, CA | 295.2 GWh |
#162 | Concho Valley Solar, LLC | San Angelo, TX | 293.4 GWh |
#163 | Blythe Solar IV, LLC | Blythe, CA | 284.6 GWh |
#164 | Montague Solar | Arlington, OR | 292.3 GWh |
#165 | Springbok Solar Farm 1 | Cantil, CA | 291.6 GWh |
#166 | Ganado Solar | Gail, TX | 288.0 GWh |
#167 | Umbriel Solar | Livington, TX | 289.8 GWh |
#169 | Upton County Solar | McCamey, TX | 287.4 GWh |
#170 | Elm Branch Solar 1 | Bardwell, TX | 287.2 GWh |
#171 | Arlington Energy Center III | Blythe, CA | 263.6 GWh |
#172 | Hardin Solar Energy LLC | Alger, OH | 285.7 GWh |
#173 | Tres Bahias | Port Lavaca, TX | 284.6 GWh |
#174 | East Blackland Solar Project 1 | Manor, TX | 283.4 GWh |
#175 | Colonial Trail West | Spring Grove, VA | 282.3 GWh |
#176 | BPL Files Solar | Itasca, TX | 282.2 GWh |
#177 | Valentine Solar, LLC | Rosamond, CA | 282.1 GWh |
#178 | Emerald Grove | Crane, TX | 281.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Harry Allen Solar Energy LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apex Generating Station | Las Vegas, NV | 2.4 TWh | 1.5 mi |
Apex Solar PV Power Project | North Las Vegas, NV | 49.7 GWh | 3.3 mi |
Arrow Canyon Solar Hybrid | Moapa, NV | 612.4 GWh | 6 mi |
Chuck Lenzie Generating Station | Apex, NV | 6.9 TWh | 3.7 mi |
Dry Lake Solar Energy Center | Moapa, NV | 165.8 GWh | 3.2 mi |
Gemini Solar | Unincorporated, NV | 1.0 TWh | 8.2 mi |
Harry Allen | Las Vegas, NV | 2.4 TWh | 2.5 mi |
IGS VGT | North Las Vegas, NV | 86.0 MWh | 12.6 mi |
Las Vegas Generating Station | North Las Vegas, NV | 410.0 GWh | 17 mi |
Moapa Southern Paiute | Moapa, NV | 604.0 GWh | 11.9 mi |
Mountain View Solar | North Las Vegas, NV | 53.8 GWh | 3.1 mi |
Nellis Air Force Base Solar Array | Las Vegas, NV | 21.7 GWh | 13.4 mi |
Nellis Solar PV II | North Las Vegas, NV | 38.0 GWh | 16.7 mi |
Nevada Cogen Assoc#1 GarnetVly | Las Vegas, NV | 421.0 GWh | 6.4 mi |
Nevada Cogen Associates 2 Black Mountain | Las Vegas, NV | 454.0 GWh | 14.9 mi |
Playa Solar 1, LLC | North Las Vegas, NV | 187.9 GWh | 2.8 mi |
Playa Solar 2 | North Las Vegas, NV | 245.8 GWh | 2.8 mi |
Republic Services Renewable Energy, LLC | Las Vegas, NV | 30.0 GWh | 6.6 mi |
Silverhawk | North Las Vegas, NV | 2.8 TWh | 2 mi |
Spectrum Solar PV Power Project | Las Vegas, NV | 83.0 GWh | 14.7 mi |