Harrison County Power Project
12039 SH 43 South, Marshall, TX 75670Plant Summary Information
Harrison County Power Project is ranked #43 out of 758 power plants in Texas in terms of total annual net electricity generation.
Harrison County Power Project is comprised of 3 generators and generated 962.2 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | Harrison County Power Project |
---|---|
Utility Name | Northeast Texas Elec Coop, Inc |
Location | Harrison County, TX |
Initial Operation Date | June 2003 |
Last Update | Oct 2024 |
Annual Generation | 3.3 TWh |
Annual Consumption | 25.1 M MMBtu |
Ranked #357 out of 11,866 Power Plants Nationwide | |
Ranked #212 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #43 out of 758 Texas Power Plants | |
Ranked #32 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
East Texas Electric Coop, Inc (2013 to 2018) Northeast Texas Elec Coop, Inc (2019 to 2023) |
Map of Harrison County Power Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Harrison County Power Project.
Monthly Net Generation for Harrison County Power Project
Harrison County Power Project Details
Summary Information | |
---|---|
Plant Name | Harrison County Power Project (55664) |
Plant Address | 12039 SH 43 South, Marshall, TX 75670 |
Utility | Northeast Texas Elec Coop, Inc (13670) |
Latitude, Longitude | 32.3958, -94.4367 |
Generation Dates on File | Jan 2003 to Oct 2024 |
Initial Operation Date | June 2003 |
Annual Generation | 3.3 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 02-25-000 |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | City Of Longview |
Ash Impoundment | No |
Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
GULF SOUTH PIPELINE COMPANY LP NATURAL GAS PL CO OF AMERICA LLC |
Natural Gas Storage | No |
Generator GT-1 Details Operating June 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Jointly Owned |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | HARRISON |
RTO ISO Location Designation For Reporting Wholesale Sales Data | HARRISON |
Nameplate Capacity | 170 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 144.5 MW |
Winter Capacity | 166.6 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator GT-2 Details Operating June 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Jointly Owned |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 170 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 144.5 MW |
Winter Capacity | 166.6 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator ST-1 Details Operating June 2003
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Jointly Owned |
Duct Burners | Yes |
Nameplate Capacity | 230 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 225.4 MW |
Winter Capacity | 225.4 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Harrison County Power Project Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Northeast Texas Elec Coop, Inc | 2221 H.G. Mosley Pwky., Longview, TX 75604 | Generator GT-1 | 55.00% |
East Texas Electric Coop, Inc | 2905 Westward Drive, Nacogdoches, TX 75961 | Generator GT-1 | 45.00% |
Northeast Texas Elec Coop, Inc | 2221 H.G. Mosley Pwky., Longview, TX 75604 | Generator GT-2 | 55.00% |
East Texas Electric Coop, Inc | 2905 Westward Drive, Nacogdoches, TX 75961 | Generator GT-2 | 45.00% |
Northeast Texas Elec Coop, Inc | 2221 H.G. Mosley Pwky., Longview, TX 75604 | Generator ST-1 | 55.00% |
East Texas Electric Coop, Inc | 2905 Westward Drive, Nacogdoches, TX 75961 | Generator ST-1 | 45.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#202 | Wansley Unit 9 | Franklin, GA | 3.4 TWh |
#203 | West Phoenix | Phoenix, AZ | 3.4 TWh |
#204 | Kings Mountain Energy Center | Kings Mountain, NC | 3.3 TWh |
#205 | Quantum Choctaw Power LLC | Ackerman, MS | 3.3 TWh |
#206 | Cherokee | Denver, CO | 3.3 TWh |
#207 | Sugar Creek Power | West Terre Haute, IN | 3.3 TWh |
#208 | Granite Ridge | Londonderry, NH | 3.3 TWh |
#209 | Marshalltown Generating Station | Marshalltown, IA | 3.3 TWh |
#210 | Bridgeport Station | Bridgeport, CT | 3.3 TWh |
#211 | Newark Energy Center | Newark, NJ | 3.3 TWh |
#213 | Brunner Island | York Haven, PA | 3.5 TWh |
#214 | Wildcat Point Generation Facility | Conowingo, MD | 3.3 TWh |
#215 | Desert Basin | Casa Grande, AZ | 3.3 TWh |
#216 | Chattahoochee Energy Facility | Franklin, GA | 3.3 TWh |
#217 | Westbrook Energy Center Power Plant | Westbrook, ME | 3.2 TWh |
#218 | Lost Pines 1 Power Project | Bastrop, TX | 3.2 TWh |
#219 | Hobbs Generating Station | Hobbs, NM | 3.2 TWh |
#220 | Columbia Energy Center (SC) | Gaston, SC | 3.2 TWh |
#221 | Attala | Sallis, MS | 3.2 TWh |
#222 | Red Oak Power LLC | Sayreville, NJ | 3.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Harrison County Power Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ADA Carbon Solutions Red River | Coushatta, LA | 99.4 GWh | 66.9 mi |
Arsenal Hill | Shreveport, LA | 188.6 GWh | 40.3 mi |
Eastman Cogeneration Facility | Longview, TX | 2.7 TWh | 15.2 mi |
Hecate Energy Upshur Rural LLC | Ore City, TX | 4.8 GWh | 35.4 mi |
International Paper Red River Mill | Campti, LA | 370.6 GWh | 81.3 mi |
International Paper Texarkana Mill | Queen City, TX | 378.2 GWh | 63.1 mi |
J Lamar Stall Unit | Shreveport, LA | 3.4 TWh | 40.4 mi |
Kellam Solar | Ben Wheeler, TX | 112.4 GWh | 74.8 mi |
Knox Lee | Longview, TX | 476.6 GWh | 12 mi |
Lieberman | Mooringsport, LA | 155.8 GWh | 35 mi |
Mansfield Mill | Mansfield, LA | 779.9 GWh | 54 mi |
Martin Lake | Tatum, TX | 10.6 TWh | 12.2 mi |
Nacogdoches Power | Cushing, TX | 172.5 GWh | 47.5 mi |
Pirkey | Hallsville, TX | 3.4 TWh | 5.3 mi |
Samson Solar Energy | Cunningham, TX | 400.5 GWh | 73.6 mi |
Snider Industries | Marshall, TX | 11.5 GWh | 12.9 mi |
Stryker Creek | Jacksonville, TX | 1.1 TWh | 45.2 mi |
Tenaska Gateway Generating Station | Mt. Enterprise, TX | 1.7 TWh | 28.2 mi |
Welsh | Pittsburg, TX | 3.9 TWh | 51.2 mi |
Wilkes | Avinger, TX | 1.1 TWh | 31.9 mi |